TXX-2955, Notification of Continuation of Investigation on Installation of Pipe Elbows Connecting Steam Generators to cross-over Leg Piping.Condition Considered Potentially Reportable Under 10CFR50.55(e)
| ML19274E882 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 02/13/1979 |
| From: | Gary R TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| To: | Seidle W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| References | |
| TXX-2955, NUDOCS 7904280224 | |
| Download: ML19274E882 (1) | |
Text
f0/E TEN AS lTil.lTIES GENERATING CO.Til'ANY
..<,.nn,n o i.m.n-i,ui m ii u..t.,n February 13, 1979 TXX-2955 n,-
fir. W. C. Seidle, Chief Reactor Construction & Engirteering Support 3 ranch U. 5. fluclear Regulatory Commission Office of Inspection and Enforcement 611 Rycn Plaza Dr., Suite 1000 Docket Nos. 50-445 Arlington, Texas 76011 50-446 COMAtlCHE PEAK STEAli LLECTRIC STATI0i; 1931-03 2300 liW Ifl$ fALLATION IriSTALLATION OF PIPE El.PO'.IS II;
~
STEAM GENERATORS LOOP PIPIf!G IllTERIM RESPONSE FILE NO. 10110
Dear fir. Seidle:
On January 17, 1979, we verbally informed your Mr. R. G. Taylor, CPSES Resident Inspector, of a deficiency in regard to installation of pipe elbows connecting the stean generators to the cross-over leg piping. We considered this " pot.entially" reportable under 10 CFR 50.55(c).
We are continuing our investigation and evaluation and will notify you as soon as we have reached a conclusion.
Very truly yours, s
N/
R. J. Gary RJG:dla cc:
flRC Region IV - (0 1 1 copy)
Director, Inspection & Enforcement - (15 copies) c/o Distribution Services Branch, DDC, ADM.
U. S. fluclear Regulatory Commission llashingtori, D. C.
20555 7 904 280 2ZT
&