TXX-2957, Notification of Completion of Investigation on Installation of Pipe Elbows Connecting Steam Generators to cross-over Leg Piping.Concludes Matter Not Reportable Under 10CFR50.55(e). Supporting Records Available at Site for Inspector Review
| ML19274E880 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 02/20/1979 |
| From: | Gary R TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| To: | Seidle W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| References | |
| TXX-2957, NUDOCS 7904280221 | |
| Download: ML19274E880 (1) | |
Text
-. _..._ -.
&N TENAS ITil,lTIES GENER.\\ TING CO.TIPANY
...a inn n u.u, w. n u re. r a w 2..
o.
February 20, 1979 n ; un, TXX-2957 y,...
fir. W. C. Seidle, Chief Reactor Construction & Engineering Support Branch U. S. fluclear Regulatory Commission Office of Inspection and Enforcement 611 Ryan Plaza Dr., Suite 1000 Docket flos. 50-445 Arlington, Texas 76011 50-446 COMAfiCHE PEAK STEA'1 ELECTRIC STAT 10ft 1931-83 2300 11W IllSTALLATI0tl IllSTALLATIO:10F PIPE ELBOWS Il1 STEAf1 GEfiERATORS LOOP PIPIflG FILE fl0. 10110
Dear Mr. Seidle:
On January 17, 1979, we verbally informed your Mr. R. G. Taylor of a deficiency in regard to installation of pipe elbows connecting the steam generators to the cross-over leg piping.
We submitted an interim response logged TXX-2955 that advised you that we were continuing our investigation and evaluation. We have completed our investigation and have concluded that the matter is not reportable under 10 CFR 50.55(e).
Records supporting these deter-ninations are available for your Inspector's review at the CPSES site.
Very truly yours, R.
. Gary RJG:dla cc:
fiRC Region IV - (0 + 1 copy)
Director, Inspection & Enforcement - (15 copies) c/o Distribution Services Branch, DDC, AD:1.
U. S. fluclear Regulatory Commission Washington, D. C. 20555 790428022(
..