Text
Oroo
UNITED STATES
3 1.
'( )f 't
. , -
_
NUcLEAT1 REGULATORY COMMISSION
E ) ) * f/ p E
o
REGION l
631 PARK AVENUE
.
gg
k:NG OF PRUS$1 A, PENNSYLV ANI A 19406
DEC 2 3 M
Docket Nos. 50-317
50-318
Baltimore Gas and Electric Company
ATTN: Mr. A. E. Lundvall, Jr.
Vice President, Supply
P. O. Box 1475
Baltimore, Maryland 21203
Gentlemen:
Subject:
Combined Inspections 50-317/78-37 and 50-318/78-33
This refers to the inspection conducted by Mr. P. S. Koltay of this
office on November 27 - December 1,1978 at Lusby, Maryland of activities
authorized by NRC License Nos. DPR-53 and DPR-69 and to the discussions
of our findings held by Mr. Koltay with Mr. J. B. Bullock and other
members of your staff at the conclusion of the inspection.
This inspection was to provide the fire protection program review team
from the Nuclear Regulatory Commission: Office of Nuclear Reactor Regulation
with direct knowledge of the arrangement of safety related equipment,
fire hazards, and fire protection equipment.
Areas examined during this inspection are described in the Office of
Inspection and Enforcement Inspection Report which is enclosed with this
l etter. Within these areas, the inspection consisted of selective
examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were
observed.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part
2, Title 10, Code of Federal Regulations, a copy of this letter and the
enclosed inspection report will be placed in the NRC's Public Document
Room.
If this report contains any information that you (or your contractor)
believe to be proprietary, it is necessary that you make a written
application within 20 days to this office to withhold such information
from public disclosure.
Any such application must be accompanied by an
790206644
.
.
Baltimore Gas and Electric Company
2
affidavit executed by the owner of the information, which identifies the
document or part sought to be withheld, and which contains a statement
of reasons which addresses with specificity the items which will be
considered by the Commission as listed in subparagraph (b) (4) of Section
2.790.
The information sought to be withheld shall be incorporated as
far as possible into a separate part of the affidavit.
If we do not
hear from you in this regard within the specified period, the report
will be placed in the Public Document Room.
No reply to this letter is required; however, should you have any ques-
tions concerning this inspection, we will be pleased to discuss them
with you.
Sincerely,
~n
Y
W
Robert T. Carlson, Chief
Reactor Construction and Engineering
Support Branch
Enclosure: Office of Inspection and Enforcement Inspection
Combined Report Numbers 50-317/78-37; 50-318/78-33
cc w/ encl:
R. M. Douglass, Manager, Quality Assurance
L. B. Russell, Chief Engineer
W. Gibson, General Supervisor, Operations QA
R. C. L. Olson, Senior Engineer