Forwards IE Insp Repts 50-321/79-12 & 50-366/79-16 on 790507-11 & Notice of Violation
ML19270H440
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 06/15/1979
From: Sutherland J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: John Miller
GEORGIA POWER CO.
Shared Package
ML19270H437 List:
References
NUDOCS 7908160490
Download: ML19270H440 (2)


See also: IR 05000321/1979012

Text

'

'

, [ p asomo

UNITL D ST ATES

g **,$

NUCLE AR REGULATORY COMMISSION

!\\

,

,,g

REGION 11

h $[; /

3-

~*

,

!

tot uAHu T T A si,, N W , sulil 3100

AT L ANT A, ot oHWA 30303

(g ' W

.....

6

In Reply Refer To:

RII:CMll

JUN 151979

50-321/74-12

50-366/79-16

Georgia Power Company

ATTN:

J. H. Miller, Jr.

Executive Vice President

270 Peachtree Street

AtIanta, GA 30303

Gentlemen:

This refers to the inspection conducted by C. H. Ilosey of this of fice on May 7-11,

1979, of activities authorized by NRC Operating License Nos. DPR-57 and NPF-5

for the Hatch Unit I and 2 f acilities, and to the discussion of our findings

held with M. Hanry at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

We have examined actions you have taken with regard to previously identified

enforcement matters. These are discussed in the enclosed inspection report.

During the inspection, it was found that certain activities under your license

appear to be in noncompliance with NLC requirements. These items and references

to pertinent requirements are listed in the Notice of Violation enclosed herewith

as Appendix A.

This notice is sent to you pursuant to the provisions of Section 2.201

of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations.

Section 2.201 requires you to submit to this office, within 20 days of your

receipt of this notice, a written statement or explanation in reply including:

(1) corrective steps which have been taken by you and the results achieved; (2)

corrective steps which will be taken to avoid further noncompliance; and (3) the

date when full compliance will be achieved,

h accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of thin letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) believe to be

proprietary, a is necessary that you make a written application within 20 days

to this office to withhold such information from public disclosure. Any such

application must include a full statement of the reasons on the basis of which

it is claimed that the information is proprietary, and should be prepared so

that proprietary information identified in tha application is contained in a

separate part of the document. If we do not hear from you in this regard within

the specified period, the report will be placed in the Public Document Room.

. 79081609y g

. .

.

,

JUN 151979

.

.

Georgia Power Company

-2-

-

Should you have any questions concerning this letter, we will be glad to dis' cuss

them with you.

Sincerely,

,1

4

<

J. T. Sutherland, Chief

Fuel Facility and Materials

Safety Branch

Enclosures:

.1.

Appendix A, Notice of Violation

2.

Inspection Report Nos.

50-321/79-12 and 50-366/79-16

cc w/ encl:

M. Manry, Plant Manager

P. O. Box 442

Baxley, GA 31513

C. E. Belflower

Site QA Supervisor

P. O. Box 442

Baxley, GA 31513

L. L. Gray, Jr.

Construction ?tsject Manager

Post Office box 329

Baxley, G-orgia

31513

r

  • .

%

A

e

e