ML19270H440
| ML19270H440 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 06/15/1979 |
| From: | Sutherland J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | John Miller GEORGIA POWER CO. |
| Shared Package | |
| ML19270H437 | List: |
| References | |
| NUDOCS 7908160490 | |
| Download: ML19270H440 (2) | |
See also: IR 05000321/1979012
Text
'
'
, [ p asomo
UNITL D ST ATES
g **,$
NUCLE AR REGULATORY COMMISSION
!\\
,
,,g
REGION 11
h $[; /
3-
~*
,
!
tot uAHu T T A si,, N W , sulil 3100
AT L ANT A, ot oHWA 30303
(g ' W
.....
6
In Reply Refer To:
RII:CMll
JUN 151979
50-321/74-12
50-366/79-16
Georgia Power Company
ATTN:
J. H. Miller, Jr.
Executive Vice President
270 Peachtree Street
AtIanta, GA 30303
Gentlemen:
This refers to the inspection conducted by C. H. Ilosey of this of fice on May 7-11,
1979, of activities authorized by NRC Operating License Nos. DPR-57 and NPF-5
for the Hatch Unit I and 2 f acilities, and to the discussion of our findings
held with M. Hanry at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
We have examined actions you have taken with regard to previously identified
enforcement matters. These are discussed in the enclosed inspection report.
During the inspection, it was found that certain activities under your license
appear to be in noncompliance with NLC requirements. These items and references
to pertinent requirements are listed in the Notice of Violation enclosed herewith
as Appendix A.
This notice is sent to you pursuant to the provisions of Section 2.201
of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations.
Section 2.201 requires you to submit to this office, within 20 days of your
receipt of this notice, a written statement or explanation in reply including:
(1) corrective steps which have been taken by you and the results achieved; (2)
corrective steps which will be taken to avoid further noncompliance; and (3) the
date when full compliance will be achieved,
h accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of thin letter and the enclosed
inspection report will be placed in the NRC's Public Document Room.
If this
report contains any information that you (or your contractor) believe to be
proprietary, a is necessary that you make a written application within 20 days
to this office to withhold such information from public disclosure. Any such
application must include a full statement of the reasons on the basis of which
it is claimed that the information is proprietary, and should be prepared so
that proprietary information identified in tha application is contained in a
separate part of the document. If we do not hear from you in this regard within
the specified period, the report will be placed in the Public Document Room.
. 79081609y g
. .
.
,
JUN 151979
.
.
Georgia Power Company
-2-
-
Should you have any questions concerning this letter, we will be glad to dis' cuss
them with you.
Sincerely,
,1
4
<
J. T. Sutherland, Chief
Fuel Facility and Materials
Safety Branch
Enclosures:
.1.
Appendix A, Notice of Violation
2.
Inspection Report Nos.
50-321/79-12 and 50-366/79-16
cc w/ encl:
M. Manry, Plant Manager
P. O. Box 442
Baxley, GA 31513
C. E. Belflower
Site QA Supervisor
P. O. Box 442
Baxley, GA 31513
L. L. Gray, Jr.
Construction ?tsject Manager
Post Office box 329
Baxley, G-orgia
31513
r
- .
%
A
e
e