Text
,8
.
UNITED STAT ES
- gm REcoq'o,
NUCLEAR REGULATORY COMMISSION
,
[
REGloN il
o
) n,
.$
101 MARIETTA STREET. N.W.
5
-
ATLANTA, GEORGI A 3o303
%...../
JAN 181979
In Reply Refer To:
RII:JKR
50-491/79-01
50-492/79-01
50-493/79-01
Duke Power Company
ATTN: Mr. L. C. Dail, Vice President
Design Engineering
Post Of fice Box 33189
Charlotte, North Carolina 28242
Gentlemen:
This refers to the inspection conducted by Mr. J. K. Rausch of this office on
January 3-5,
1979 of activities authorized by NRC License Nos. CPPR-167,
CPPR-168 and CPPR-169 for the Cherokee Nuclear Station facility, and to the
discussion of our findings held with Mr. C. B. Aycock at the conclusion of
the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews
with personnel, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were disclosed.
We have examined actions you have taken with regard to previously identified
inspection findings. These are discussed in the enclosed inspection report.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room.
If this
report contains any information that you (or your contractor) believe to be
proprietary, it is necessary that you make a written application within 20
days to this office to withhold such information from public disclosure. Any
such application must include a full statement of the reasons on the basis of
which it is claimed that the information is proprietary, and should be prepared
so that proprietary information identified in the application is contained in
a separate part of the document. If we do rot hear from you in this regard
within the specified period, the report will be placed in the Public Document
Room.
,
7902150447
.
JAN I 81979
.
Duke Power Company
-2-
Should you have any questions concerning this letter, we will be glad to
discuss them with ycu.
Sincerely,
c' C,
Charles E. Mtri~pT
Chief
Reactor Construction and
Engineering Support Branch
Enclosures:
Inspection Report Nos. 50-491/79-01,
50-492/79-01 and 50-493/79-01
cc w/ enclosures:
Mr. J. T. Moore, Project Manager
Cherokee Nuclear Station
Post Office Box 422
Gaffney, South Carolina 29340
,