ML19270F567

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-491/79-01,50-492/79-01 & 50-493/79-01.No Noncompliance Noted
ML19270F567
Person / Time
Site: Cherokee  Duke Energy icon.png
Issue date: 01/18/1979
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Dail L
DUKE POWER CO.
Shared Package
ML19270F564 List:
References
NUDOCS 7902150447
Download: ML19270F567 (2)


See also: IR 05000491/1979001

Text

,8

.

UNITED STAT ES

  1. gm REcoq'o,

NUCLEAR REGULATORY COMMISSION

,

[

REGloN il

o

) n,

.$

101 MARIETTA STREET. N.W.

5

-

ATLANTA, GEORGI A 3o303

%...../

JAN 181979

In Reply Refer To:

RII:JKR

50-491/79-01

50-492/79-01

50-493/79-01

Duke Power Company

ATTN: Mr. L. C. Dail, Vice President

Design Engineering

Post Of fice Box 33189

Charlotte, North Carolina 28242

Gentlemen:

This refers to the inspection conducted by Mr. J. K. Rausch of this office on

January 3-5,

1979 of activities authorized by NRC License Nos. CPPR-167,

CPPR-168 and CPPR-169 for the Cherokee Nuclear Station facility, and to the

discussion of our findings held with Mr. C. B. Aycock at the conclusion of

the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews

with personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were disclosed.

We have examined actions you have taken with regard to previously identified

inspection findings. These are discussed in the enclosed inspection report.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20

days to this office to withhold such information from public disclosure. Any

such application must include a full statement of the reasons on the basis of

which it is claimed that the information is proprietary, and should be prepared

so that proprietary information identified in the application is contained in

a separate part of the document. If we do rot hear from you in this regard

within the specified period, the report will be placed in the Public Document

Room.

,

7902150447

.

JAN I 81979

.

Duke Power Company

-2-

Should you have any questions concerning this letter, we will be glad to

discuss them with ycu.

Sincerely,

c' C,

Charles E. Mtri~pT

Chief

Reactor Construction and

Engineering Support Branch

Enclosures:

Inspection Report Nos. 50-491/79-01,

50-492/79-01 and 50-493/79-01

cc w/ enclosures:

Mr. J. T. Moore, Project Manager

Cherokee Nuclear Station

Post Office Box 422

Gaffney, South Carolina 29340

,