.~u.S.NRC United States Nuclear Regulatory Commission Protecting People and the Environment NRC/FERC/NERC Interactions, Current Fleet of Operating Reactors, License Renewal, Decommissioning, New Reactors NRC/FERC Joint Commission Meeting September 25, 2019

-

Agenda

  • Anna Bradford, Deputy Director, Division of Licensing, Siting and Environmental Analysis, NRO

-

Nuclear Safety & Security Enhanced by lnteragency Agreements and Interactions MOA FERC -----------------*


* ,

NRC

,,,,

....

CEIi-MOU

,,,,

,

- Oversight ,,, , '

,, o'J

,,

,,,,

~

Ti tie l O of NERC -- th e Code of Federal Regulations

-- Reliability Standards NUCLEAR PLANT

Nuclear Power is a Significant Portion of the U.S. Electric Generation ND SD WY NE co

& = 1 unit

& =2unlts

~- ,s::,

A= 3 units

.- HI {>

Licensed to Operate (97)

Draft NRC Information Digest, 2019-2020 (NUREG-1350, Vol.31)

Projected Electric Capacity Dependent on License Renewals 100

-

~ 80

- Without License

-

c.,

u Renewals

-

  • c:

u

.1: 60

- With Current iCV C,

and Potential Renewals c, 40

~

  • c::;

CV ci.

- With CV Subsequent u License 20 Renewal 0

2010 2020 2030 2040 2050 2060 2070 Year As of August 2019

Subsequent License Renewal (SLR)

Moving Forward

  • Issued SLR guidance in July 2017 in anticipation of applications
  • Reviewing 3 applications
  • Anticipating 1 application in 2020

Electric Capacity Decreased by Decommissioning Power Reactors QUEBEC INTERCONNECTION NERCINTERCONNECTIONS

  • Already Decommissioning
  • Planning Decommissioning Vermont Yankee

.~ -,1--- - - Pilgrim

-~~~~-- Indian Point 2&3

.,_- - - -Oyster Creek

'""'llll -- - - -Three Mile Island 1 Diablo Canyon 1&2 WECC ,t--~-.1,, . - - - - Beaver Valley 1&2 San Onofre 2&3

,,- - - - -

WESTERN ,, / .... ....

INTERCONNECTION ; .... .... EASTERN

/ .... .... INTERCONNECTION

/

/ .... ....

....

ERCOT '

INTERCONNECTION "NERC Interconnections." NERC. Web. 22 May 2018. <https://www.nerc.com>.

Safety Ensured Prior to and During Decommissioning Activities

  • NRC continues to ensure safety during the entire decommissioning process

- Timely reviews

- Draft proposed rule

  • Lessons learned are being applied to current reviews and incorporated into the decommissioning rulemaking.

-

New Reactor Licensing in the U.S.

  • NuScale Phases 2 and 3 milestone completed in July 2019
  • TV A Early Site Permit application Commission hearing completed
  • UAMPS Combined License Application plans to reference the NuScale design

New Reactor Licensing in the U.S.,

cont'd

  • GE-Hitachi pre-application interactions anticipated for its BWRX-300 design
  • Bellefonte construction permit license transfer request

Preparing for Vogtle 3 & 4 Operation

  • Scheduled Fuel Load Dates

- Unit 3: November 2020

- Unit 4: November 2021

  • Commercial operation anticipated 6 months after fuel load dates
  • NRC prepared to support timely licensing and oversight activities

-

NRC's Oversight of Vogtle Construction

  • Verified about 20% of all lTAAC for both units (ITAAC Closure Notifications: ICNs)
  • Accepted "plans" for remaining 64%

(Uncompleted ITAAC Notifications: UINs)

ICN Verified Not Recei ed UIN Accepted 5 , 3. ~ \

78,

  • C/o r
  • Cfc _j

Assuring Readiness for Advanced Reactors

  • Risk-Informed Performance-Based Licensing Approaches

- Draft Regulatory Guide (DG) 1353

  • Technology Inclusive Policy Issues

- Functional Containment

- Security

- Emergency Preparedness

Advanced Reactor Landscape Micro Liquid Metal Cooled Fast High-Temperature Gas- Molten Salt Reactors Reactors Reactors Cooled Reactors (MSR)

(LMFR) (HTGR)

~ "I t Oklo 1 ( GE-H {VTR) ) X-energy

[ Others ] ( Terra Power ) General Atomics r - - - -

Stationary ~

[ ARC ] Framatome StarCore Sodium-Cooled I

[ ] TR/SO Fuel

(

Westinghouse Others I [ Westinghouse )

I


- Terrestrial Terra Power Mobile

[ Columbia Basin ] [ Elysium ]

[ Hydromine I [ Thorcon I

Lead-Cooled ( Muons )

( Flibe )

[ Alpha Tech )

Liquid Salt Fueled

Acronyms

  • CEIi - Critical Energy /Electric Infrastructure Information
  • ESP - Early Site Permit
  • IAP - Implementation Action Plans
  • ITAAC - Inspections, Tests, Analyses, and Acceptance Criteria
  • MOA - Memorandum of Agreement
  • MOU - Memorandum of Understanding
  • M We - Megawatt electric

Acronyms

  • NERC - North American Electric Reliability Corporation
  • NRR - Office of Nuclear Reactor Regulation
  • NRO - Office of New Reactors
  • NPP - Nuclear Power Plant
  • SMR - Small Modular Reactor
  • UAMPS - Utah Associated Municipal Power Systems