.~u.S.NRC United States Nuclear Regulatory Commission Protecting People and the Environment NRC/FERC/NERC Interactions, Current Fleet of Operating Reactors, License Renewal, Decommissioning, New Reactors NRC/FERC Joint Commission Meeting September 25, 2019

Agenda

  • Anna Bradford, Deputy Director, Division of Licensing, Siting and Environmental Analysis, NRO

Nuclear Safety & Security Enhanced by lnteragency Agreements and Interactions MOA FERC CEIi-MOU Oversight

,, o'J

~

NERC Reliability Standards NUCLEAR PLANT NRC Ti tie l O of th e Code of ederal egulations F

R

Nuclear Power is a Significant Portion of the U.S. Electric Generation

~-

,s::,

HI {>

WY co ND SD NE Licensed to Operate (97)

Draft NRC Information Digest, 2019-2020 (NUREG-1350, Vol.31)

& = 1 unit

& = 2unlts A= 3 units

Projected Electric Capacity Dependent on License Renewals 100

~ 80 c., -

u

  • c: -

u

.1: 60 i

CV C,

c, 40

~

  • c::;

CV ci.

CV u As of August 2019 20 0

2010 2020 2030 2040 Year 2050 2060 2070 Without License Renewals With Current and Potential Renewals With Subsequent License Renewal

Subsequent License Renewal (SLR)

Moving Forward

  • Issued SLR guidance in July 2017 in anticipation of applications
  • Reviewing 3 applications
  • Anticipating 1 application in 2020

Electric Capacity Decreased by Decommissioning Power Reactors Diablo Canyon 1&2 San Onofre 2&3 NERCINTERCONNECTIONS WECC WESTERN

,, /

INTERCONNECTION ;

/

/

/

QUEBEC INTERCONNECTION

  • Already Decommissioning
  • Planning Decommissioning Vermont Yankee

.~

-,1----- Pilgrim

-~~~~-- Indian Point 2&3

.,_----Oyster Creek

'""'llll-----Three Mile Island 1

,t--~-.1,,.---- Beaver Valley 1&2 EASTERN INTERCONNECTION ERCOT INTERCONNECTION "NERC Interconnections." NERC. Web. 22 May 2018. <https://www.nerc.com>.

Safety Ensured Prior to and During Decommissioning Activities

  • NRC continues to ensure safety during the entire decommissioning process

- Timely reviews

- Draft proposed rule

  • Lessons learned are being applied to current reviews and incorporated into the decommissioning rulemaking.

New Reactor Licensing in the U.S.

  • NuScale Phases 2 and 3 milestone completed in July 2019
  • TV A Early Site Permit application Commission hearing completed
  • UAMPS Combined License Application plans to reference the NuScale design

New Reactor Licensing in the U.S.,

cont'd

  • GE-Hitachi pre-application interactions anticipated for its BWRX-300 design
  • Bellefonte construction permit license transfer request

Preparing for Vogtle 3 & 4 Operation

  • Scheduled Fuel Load Dates

- Unit 3: November 2020

- Unit 4: November 2021

  • Commercial operation anticipated 6 months after fuel load dates
  • NRC prepared to support timely licensing and oversight activities

NRC's Oversight of Vogtle Construction

  • Verified about 20% of all lTAAC for both units (ITAAC Closure Notifications: ICNs)
  • Accepted "plans" for remaining 64%

(Uncompleted ITAAC Notifications: UINs) 5, 3. ~ \\

r

  • Cfc _j ICN Verified Not Recei ed UIN Accepted 78,
  • C/o

Assuring Readiness for Advanced Reactors

  • Risk-Informed Performance-Based Licensing Approaches

- Draft Regulatory Guide (DG) 1353

  • Technology Inclusive Policy Issues

- Functional Containment

- Security

- Emergency Preparedness

~ t

[

[

(

Advanced Reactor Landscape Micro Reactors Oklo Others Stationary Westinghouse Others Mobile "I

1

]

~

]

I Liquid Metal Cooled Fast Reactors (LMFR)

(

GE-H {VTR)

)

(

Terra Power

)

[

ARC

]

Sodium-Cooled

[

Westinghouse

)

[

Columbia Basin

]

[

Hydromine I

Lead-Cooled I

I High-Temperature Gas-Cooled Reactors (HTGR)

X-energy General Atomics Framatome StarCore TR/SO Fuel

[

[

(

(

[

Molten Salt Reactors (MSR) r - - - -

Terrestrial Terra Power Elysium

]

Thorcon I

Muons

)

Flibe

)

Alpha Tech

)

Liquid Salt Fueled

Acronyms

  • CEIi - Critical Energy /Electric Infrastructure Information
  • ESP - Early Site Permit
  • IAP - Implementation Action Plans
  • ITAAC - Inspections, Tests, Analyses, and Acceptance Criteria
  • MOA - Memorandum of Agreement
  • MOU - Memorandum of Understanding
  • M We - Megawatt electric

Acronyms

  • NERC - North American Electric Reliability Corporation
  • NRR - Office of Nuclear Reactor Regulation
  • NRO - Office of New Reactors
  • NPP - Nuclear Power Plant
  • SMR - Small Modular Reactor
  • UAMPS - Utah Associated Municipal Power Systems