.~u.S.NRC United States Nuclear Regulatory Commission Protecting People and the Environment NRC/FERC/NERC Interactions, Current Fleet of Operating Reactors, License Renewal, Decommissioning, New Reactors NRC/FERC Joint Commission Meeting September 25, 2019
Agenda
- Eric Benner, Acting Deputy Director for Reactor Safety Programs, NRR
- Meena Khanna, Acting Deputy Director, Division of Materials and License Renewal, NRR
- Anna Bradford, Deputy Director, Division of Licensing, Siting and Environmental Analysis, NRO
Nuclear Safety & Security Enhanced by lnteragency Agreements and Interactions MOA FERC CEIi-MOU Oversight
,, o'J
~
NERC Reliability Standards NUCLEAR PLANT NRC Ti tie l O of th e Code of ederal egulations F
R
Nuclear Power is a Significant Portion of the U.S. Electric Generation
~-
,s::,
HI {>
WY co ND SD NE Licensed to Operate (97)
Draft NRC Information Digest, 2019-2020 (NUREG-1350, Vol.31)
& = 1 unit
& = 2unlts A= 3 units
Projected Electric Capacity Dependent on License Renewals 100
~ 80 c., -
u
- c: -
u
.1: 60 i
CV C,
c, 40
~
- c::;
CV ci.
CV u As of August 2019 20 0
2010 2020 2030 2040 Year 2050 2060 2070 Without License Renewals With Current and Potential Renewals With Subsequent License Renewal
Subsequent License Renewal (SLR)
Moving Forward
- Issued SLR guidance in July 2017 in anticipation of applications
- Reviewing 3 applications
- Anticipating 1 application in 2020
Electric Capacity Decreased by Decommissioning Power Reactors Diablo Canyon 1&2 San Onofre 2&3 NERCINTERCONNECTIONS WECC WESTERN
,, /
INTERCONNECTION ;
/
/
/
QUEBEC INTERCONNECTION
- Already Decommissioning
- Planning Decommissioning Vermont Yankee
.~
-,1----- Pilgrim
-~~~~-- Indian Point 2&3
.,_----Oyster Creek
'""'llll-----Three Mile Island 1
,t--~-.1,,.---- Beaver Valley 1&2 EASTERN INTERCONNECTION ERCOT INTERCONNECTION "NERC Interconnections." NERC. Web. 22 May 2018. <https://www.nerc.com>.
Safety Ensured Prior to and During Decommissioning Activities
- NRC continues to ensure safety during the entire decommissioning process
- Timely reviews
- Draft proposed rule
- Lessons learned are being applied to current reviews and incorporated into the decommissioning rulemaking.
New Reactor Licensing in the U.S.
- NuScale Phases 2 and 3 milestone completed in July 2019
- TV A Early Site Permit application Commission hearing completed
- UAMPS Combined License Application plans to reference the NuScale design
New Reactor Licensing in the U.S.,
cont'd
- GE-Hitachi pre-application interactions anticipated for its BWRX-300 design
- Bellefonte construction permit license transfer request
Preparing for Vogtle 3 & 4 Operation
- Scheduled Fuel Load Dates
- Unit 3: November 2020
- Unit 4: November 2021
- Commercial operation anticipated 6 months after fuel load dates
- NRC prepared to support timely licensing and oversight activities
NRC's Oversight of Vogtle Construction
- Verified about 20% of all lTAAC for both units (ITAAC Closure Notifications: ICNs)
- Accepted "plans" for remaining 64%
(Uncompleted ITAAC Notifications: UINs) 5, 3. ~ \\
r
- Cfc _j ICN Verified Not Recei ed UIN Accepted 78,
- C/o
Assuring Readiness for Advanced Reactors
- Risk-Informed Performance-Based Licensing Approaches
- Draft Regulatory Guide (DG) 1353
- Technology Inclusive Policy Issues
- Functional Containment
- Security
~ t
[
[
(
Advanced Reactor Landscape Micro Reactors Oklo Others Stationary Westinghouse Others Mobile "I
1
]
~
]
I Liquid Metal Cooled Fast Reactors (LMFR)
(
GE-H {VTR)
)
(
Terra Power
)
[
]
Sodium-Cooled
[
)
[
Columbia Basin
]
[
Hydromine I
Lead-Cooled I
I High-Temperature Gas-Cooled Reactors (HTGR)
X-energy General Atomics Framatome StarCore TR/SO Fuel
[
[
(
(
[
Molten Salt Reactors (MSR) r - - - -
Terrestrial Terra Power Elysium
]
Thorcon I
Muons
)
Flibe
)
Alpha Tech
)
Liquid Salt Fueled
- CEIi - Critical Energy /Electric Infrastructure Information
- ESP - Early Site Permit
- IAP - Implementation Action Plans
- ITAAC - Inspections, Tests, Analyses, and Acceptance Criteria
- MOA - Memorandum of Agreement
- MOU - Memorandum of Understanding
- M We - Megawatt electric
- NERC - North American Electric Reliability Corporation
- NRR - Office of Nuclear Reactor Regulation
- NRO - Office of New Reactors
- NPP - Nuclear Power Plant
- SMR - Small Modular Reactor