ML19269F475
| ML19269F475 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 11/15/1979 |
| From: | Sutherland J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Parker W DUKE POWER CO. |
| Shared Package | |
| ML16162A289 | List: |
| References | |
| NUDOCS 7912210080 | |
| Download: ML19269F475 (2) | |
See also: IR 05000269/1979028
Text
.
.
.
/
UNITED STATES
o
8
-
g
NUCLEAR REGULATORY COMMISSION
n
E
REGION 11
$
-
3
'#
o
101 MARIETTA ST
N.W., SUITE 3100
g
o
ATLANTA, GEORGIA 30303
In Reply Refer To:
NOV 151979
RII:ALC
50-269/79-28
50-270/79-26
50-287/79-28
Duke Power Company
ATTN:
W. O. Parker, Jr.
Vice President, Steam Production
P. O. Box 33189
Charlotte, N C 28242
Gentlemen:
This refers to the inspection conducted by A. L. Cunningham of this office on
October 24-26, 1979, of activities authorized by NRC Operating License Noa.
DPR-38, DPR-47 and DPR-55 for the Oconee Nuclear facility, and te the discussion
of our findings held with J. E. Smith at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were disclosed.
We have examined actions you have taken with regard to previously identified
enforcement matters and unresolved items. The status of these items is
discussed in the enclosed report.
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room.
If this
report contains any information that you (or your contractor) believe to be
proprietary, it is necessary that you make a written application within 20 days
to this office to withhold su.h information from public disclosure.
Any such
application must include a full statement of the reasons on the basis of which
it is claimed that the information is proprietary, and should be prepared so
that proprietary information identified in the application is contained in a
separate part of the document.
If we do not hear from you in this regard within
the specified period, the report will be placed in the Public Document Room.
2167 049
7 912210
Ob
NOV 1 5 1979
.
-
.
Duke Power Company
-2-
'
Should you have any questiuns concerning this letter, we will be glad to discuss
them with you.
Sincerely,
el
'O 'h
J. T. Sutherland, Chief
Fuel Facility and Materials
Safety Branch
Enclosure:
Inspection Report Nos. 50-269/79-28,
50-270/79-26 and 50-137/79-28
cc w/ enc 1:
J. E. Smith, Station Manager
P. O. Box 1175
Seneca, S C 29678
2167 050