ML19269C055
| ML19269C055 | |
| Person / Time | |
|---|---|
| Site: | Grand Gulf |
| Issue date: | 11/22/1978 |
| From: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Stampley N MISSISSIPPI POWER & LIGHT CO. |
| Shared Package | |
| ML19269C052 | List: |
| References | |
| NUDOCS 7901190254 | |
| Download: ML19269C055 (2) | |
See also: IR 05000416/1978015
Text
.
8
9
UNITED STATES
[g* 8'80 9(o,
0
NUCLE AR REGULATORY COMMISSION
,
R EGION 11
{
)s,
g
r
101 M ARIETT A sTRE E T. N.W.
<
-*
[
ATLANT A GEORGI A 30303
o
Y
- % * * " * J
NOV 2 21978
-
In Reply Refer To:
"
RII:CA
416/417/78-15
y
Mississippi Power and Light Company
ATTN:
Mr. Norris L. Stampley
Vice President of Production
Post Office Box 1640
Jackson, Mississippi 39205
Gentlemen:
This refers to the investigation conducted by Mr. C. E. Alderson of this
office on September 18-22 and October 10-13, 1978 of activities authorized
by NRC License Nos. CPPR-118 and CPPR-119 for the Grand Gulf facility,
and to the discussion of our findings held with Mr. T. E. Reaves, Jr.,
at the conclusion of the investigation.
Areas examined during the investigation and our findings are discussed
in the enclosed investigation report. Within these areas, the investigation
consisted of selective examinations of procedures and representative
records, interviews wit'a personnel, and observations by the investigators.
One new unresolved item resulted from this investigation and is discussed
in the enclosed report.
This item will be examined during subsequent
inspections.
During the investigation, it was found that certain activities under
your license appear to be in noncompliance with NRC requirements. These
items and references to pertinent requirements are listed in the Notice
of Violation enclosed herewith as Appendix A.
This notice is sent to
you pursuant to the provisions of Section 2.201 of the NRC's " Rules of
Practice," Part 2, Title 10, Code of Federal Regulations.
Section 2.201
requires you to submit to this office, within 20 days of your receipt of
this notice, a written statement or explanation in reply including:
(1)
corrective steps which have been taken by you, and the results achieved;
(2) corrective steps which will be taken to avoid further noncompliance;
and (3) the date when full compliance will be achieved.
In accordance with Section 2.790 of the NRC's " Rules of Practice,"
Part 2, Title 10, Code of Federal Regulations, a copy of this letter and
the enclosed investigation report will be placed in the NRC's Public
Document Room.
If this report contains any information that you (or
your contractor) believe to be proprietary, it is necessary that you
make a written application within 20 days to this office to withhold
such information from public disclosure.
Any such application must
include a full statement of the reasons on the basis of which it is
claimed that the information is proprietary, and should be prepared so
790119 d2 Sy'
.
'
.
,
Mississippi Power and
NOV 2 2 79 79
Light Company
-2-
that proprietary information identified in the application is contained
in a separate part of the document.
Ifwedonothearfromyoiinthis
regard within the specified period, the report will be placed in the
Public Document Room.
Should you have any questions concerning this letter, we will be glad to
discuss them with you.
Sincerely,
'
pO
ames P. O'Reilly
D ector
Enclosures:
Appendix A, Notice of Violation
Investigation Report Nos. 50-416/78-15
and 50-417/78-15
cc w/ enclosures:
Mr. W. L. Nail
Plant Superintendent
Post Office Box 756
Port Gibson, Mississippi 39150
.