LER-1980-001, /01T-o:on 800105,while Performing Electromatic Relief Valve Operability Test,Emergency Releie Valve D Failed to Open.Caused by Component Failure Due to Retainer Ring Being Backed Off Approx Six Threads |
| Event date: |
|
|---|
| Report date: |
|
|---|
| 2191980001R01 - NRC Website |
|
text
LICENSEE EVENT REPORT
-- :: E LOCO !
I I
l@
- F. EASE PRINT OR TYPE ALL REQUIRED INFOR!.%TIONI
(
at@26! 4 l 1 l 1 I l i 1 lh!
I l@
Ic
! !N'Ji0IC!P l1 l@!01Cl-l0ICl010
'O l-l0 ID l
Li0 Esse TveE o t'
- - a se 7
t e uCEN:st 000:
u
- s uOeN;E u vat =
c oN*-
l@ :1!Iclc.l8101@lollI2I1 1; lo l@
[011
.D*0I ! L l@l 01 51 01 010121 1 10 1
E ca o
ac0 SET NuvE E A e4 c a.
Evs.
0, ATE 74 75 REPOET C ATE 50 EVENT DESCRIPTION AND PROB ABLE CONSEQUEi.CES h El I On Januarv 5, 1980, while cerformine the e'eCtronatic relief valve oper-l c i s,, ability test, the 'D' EMRV failed to open.
Three attempts were made to
]
ei.:i lopen the 'D' EMRV and each time there was no audible indication of steam l
c is
- flow detected and there was not a sinilar increase in the downComer line j
ictei i temperature as noted in the other EMRV tests.
T.S.3.4.B.2 was violated.
cn,;
t o is
[
EO E =
SYOTEM
CAUSE
CAUSE COMP.
VALVE COLE CO;E SUSOO;E 0 0Y20NE*!T 00 0E SUE 00h!
SUE 000E l C I C l@ l E @ l B l@ l VI Al L l V l E IX l@ l Hl@ l Bl@
13l91 7
L S
10 11 12 12 18 19 20 SE OUE NTI A.
C CC:., R R EN CE REPORT REVISION
- o EVENT YE AR REPORT NO.
CODE TYPE NO.
O" =gg:5.f.gI 81 01 1-1 10 10 11 I l/l 10 11 1 TI l-l i
I 21 22 23 24 26 27 26 29 30 31 32 ACTION F L*TU R E EF8ECT SMUTDOWN ATTACHMENT NPRDA PRIME COMP.
COMPONENT TAKEN ACTION ON PLANT METHOD HOURS 22 SUBMITTED FORM bu8.
SUPPLIER MANUF ACTUR ER l X l@l B l@
l Z l@
lZl@
l0 l0 l0 10 l lYl@
l Y l@
lN l@
l Dl 214 l 5 l{
32 34 3b 36 37 40 41 42 43 44 47 CAUSE DESCRIPTICN AND CORRECTIVE ACTIONS h i
O l The retainer ring was found backed off about six threads and the grab l
l screw was missing.
The probable cause was iroroper rebuilding.
The i
i i
l other four EMRV's will be removed and inspected for proper grab screw l
7
,,3 l installation.
l 1
4 1
l 7
8 9 80 F ACILITY METHODOF STATUS
% POWER OTHER STATUS DISCOVERY DISCOVERY DESCRIPTION 3 ITTTl I Dl@ l 0 l 1 l5 l@l NA l
l B lgl Operability Test l
7 8 9 10 12 13 44 45 46 80 ACTIVITY CONTENT AMOUNT OF ACTIVITY LOCATION OF RELEASE RELE ASE@D OF RELEASE lZl@l l Zl NA l
NA l
1 6
7 8 9 10 11 44 45 80 n
h Dh
]
j~
'.mYBER TYPE OESCRIPTION 39 U [\\ ll 6JH h /[g gf l
l0l0l0l@lZl@l ll NA 1
7 N3UdiES
}O [
.D 8
Pi a:ONNEt 0ESOR,P110Ne
. u.ER 1010 lo l@l NA l
i x
7 8 9 11 12 83 LC',5 OF OR OAMAGE TO FACILITY 8g0128o 256 l
v TvPE CESCRIPTloN lZl@l NA i
9 7
6 9 TC E0 it ; ; E y'0 L '0I T Y NRC 16E ONLY r
DESC A1PT IO*.
,,[-
lY l3]
Weekly News Release l
ll l l 1lltl1ll l-p 1,
CE 09 Donald A.
Rest 201-455-8784 n,
,g, pggyg
Jersey Central Power & Light Company r)
Madison Avenue at Punch Bow! Road Morristown New Jersey 07960 (201)455-8200 OYSTER CREEK NUCLEAR GENERATING STATION Forked River, New Jersey 08731 Licensee Event Report Reportable Occurrence No. 50-219/80/1/IT Report Date January 21, 1980 Occurrence Date January 5,1980 identification of Occurrence Violation of the Technical Specifications, paragraph 3.4.B.2, when EMRV 'D' did not open when tested during shutdown.
This event is considered to be a reportable occurrence as defined in the Techni-cal Specifications, paragraph 6.9.2.A.
Conditions Prior to Occurrence The plant was being shutdown for refueling and maintenance.
The major parameters at the time of occurrence were:
Power:
Reactor, 280 MWt Generator, O MWe Flow:
Recirculation 12.6 x 106 gpm Feedwater.8 x 104 #/hr.
Stack Gas:
2.67 x 104 pei/sec Description of Occurrence On Saturday, January 5, 1980 at approximately 3:00 AM while performing the Electromatic Relief Valve Operability Test, the 'D' EMRV failed to open.
There were three attempts to open the 'D' EMRV and each time there was no audible indication of steam flow detected and there was not a similar increase in the downcomer line temperature as noted in the other EMRV tests.
Apparent Cause of Occurrence Component failure was the cause of this event.
The retainer ring was backed off about six threads and ;he grab screw was missing.
It appears as though the grab screw was improperly assembled during previous assembly.
1817 350 Jete, Cr4 Po..e' & Liant Company e; a nmber of t e Genet Pat : Uuties System
l Repcrtable Occurrence Pace 2 Report No. 50-219/80/1/1T Analysis of Occurrence The relief valves of the automatic depressurization system enab'es the co're spray system to provide protection against the small break in the event the feedwater system is not active.
Since the 'D' EMRV was inoperable, the A.D.S. was con-sidered to be operable in a degraded mode.
The loss of one EMRV has been addressed in the loss of cooling accident analysis.
Also, the relief valves are provided to remove sufficient energy from the primary system to prevent the safety valves fr>m lifting during a transient.
The limiting pressure transient is a turbine trip rom rated design power with a failure of the bypass to function.
The five relief valves are required to operate to prevent reaching the lowest setpoint of the primary system safety valves. With four relief valves operable and the core thermal power not reduced to 1740 MWt to preserve a 25 psig margin between peak transient pressure and the lowest safety valve setpoint, there was no assurance that the safety valves would not lift.
Corrective Action
The EMRV was removed and transported to the test stand where it was discovered that the retainer ring was backed off about six threads and the grab screw which keeps the retainer ring in place was missing.
The other four EMRV's will be removed cnd inspected for the same problem.
The probable cause was due to improper rebuilding.
All rebuilt valves will be checked for proper installation of the grab screw.
Failure Data NR108D Size:
6x8 Mfg.:
Dresser industries
\\0\\
|
|---|
|
|
| | | Reporting criterion |
|---|
| 05000219/LER-1980-001-01, /01T-o:on 800105,while Performing Electromatic Relief Valve Operability Test,Emergency Releie Valve D Failed to Open.Caused by Component Failure Due to Retainer Ring Being Backed Off Approx Six Threads | /01T-o:on 800105,while Performing Electromatic Relief Valve Operability Test,Emergency Releie Valve D Failed to Open.Caused by Component Failure Due to Retainer Ring Being Backed Off Approx Six Threads | | | 05000219/LER-1980-001, Forwards LER 80-001/01T-0 | Forwards LER 80-001/01T-0 | | | 05000219/LER-1980-002-03, /03L-0:on 800116,during Fuel Bundle Clip Insp,Fuel Bundle UD-3-023 Was Misoriented & Was Not Properly Seated in Core Cell Location.Caused by Personnel Error & Inadequate Procedural Controls.Procedure 205 Revised | /03L-0:on 800116,during Fuel Bundle Clip Insp,Fuel Bundle UD-3-023 Was Misoriented & Was Not Properly Seated in Core Cell Location.Caused by Personnel Error & Inadequate Procedural Controls.Procedure 205 Revised | | | 05000219/LER-1980-002, Forwards LER 80-002/03L-0 | Forwards LER 80-002/03L-0 | | | 05000219/LER-1980-003-01, /01T-0:on 800116,during Inservice Insp on Core Spray Sparger Piping for Sys Ii,Two Indications of Cracks Discovered.Ultrasonic Test Revealed through-wall Cracks. Possibly Caused by Sparger Installation Method | /01T-0:on 800116,during Inservice Insp on Core Spray Sparger Piping for Sys Ii,Two Indications of Cracks Discovered.Ultrasonic Test Revealed through-wall Cracks. Possibly Caused by Sparger Installation Method | | | 05000219/LER-1980-003, Forwards LER 80-003/01T-0 | Forwards LER 80-003/01T-0 | | | 05000219/LER-1980-004, Forwards LER 80-004/03L-0 | Forwards LER 80-004/03L-0 | | | 05000219/LER-1980-004-03, /03L-0:on 800125,on 800125,29 & 0213,radioactive Water Discovered Leaking from Severely Pitted Aluminum Piping of Condensate Transfer Sys.Caused by Galvanic Corrosion.Leaks Temporarily Repaired & Piping to Be Replaced | /03L-0:on 800125,on 800125,29 & 0213,radioactive Water Discovered Leaking from Severely Pitted Aluminum Piping of Condensate Transfer Sys.Caused by Galvanic Corrosion.Leaks Temporarily Repaired & Piping to Be Replaced | | | 05000219/LER-1980-005, Forwards LER 80-005/03L-0 | Forwards LER 80-005/03L-0 | | | 05000219/LER-1980-005-03, /03L-0:on 800205,during Weekly Surveillance of Standby Gas Treatment Sys,Setpoints for Radiation Monitors RNO4A-1 & RNO4A-2 Found to Read Less Conservatively than Tech Spec.Caused by Personnel Error & Instrument Drift | /03L-0:on 800205,during Weekly Surveillance of Standby Gas Treatment Sys,Setpoints for Radiation Monitors RNO4A-1 & RNO4A-2 Found to Read Less Conservatively than Tech Spec.Caused by Personnel Error & Instrument Drift | | | 05000219/LER-1980-006-03, /03L-0:on 800131,during Reactor Recirculation Flow Calibr surveillance,as-found Values of Recirculation Flow Sensors at Zero Percent Simulated Flow Were Out of Tolerance.Caused by Instrument Drift | /03L-0:on 800131,during Reactor Recirculation Flow Calibr surveillance,as-found Values of Recirculation Flow Sensors at Zero Percent Simulated Flow Were Out of Tolerance.Caused by Instrument Drift | | | 05000219/LER-1980-006, Forwards LER 80-006/03L-0 | Forwards LER 80-006/03L-0 | | | 05000219/LER-1980-007-03, /03L-0:on 800213,while Performing 10-h Test on Standby Gas Treatment Sys 1,flow Was Less than Tech Spec Limit.Caused by Slipping Drive Belts on Exhaust Fan EF1-8. Drive Belts Replaced | /03L-0:on 800213,while Performing 10-h Test on Standby Gas Treatment Sys 1,flow Was Less than Tech Spec Limit.Caused by Slipping Drive Belts on Exhaust Fan EF1-8. Drive Belts Replaced | | | 05000219/LER-1980-007, Forwards LER 80-007/03L-0 | Forwards LER 80-007/03L-0 | | | 05000219/LER-1980-008-01, /01T-0:on 800215,during Insp for IE Bulletin 79-14,discovered Nine Pipe Clamps Installed W/O Restraining Welded Lugs.Caused by Oversight During Const.Welded Lugs to Be Installed | /01T-0:on 800215,during Insp for IE Bulletin 79-14,discovered Nine Pipe Clamps Installed W/O Restraining Welded Lugs.Caused by Oversight During Const.Welded Lugs to Be Installed | | | 05000219/LER-1980-008, Forwards LER 80-008/01T-0 | Forwards LER 80-008/01T-0 | | | 05000219/LER-1980-009-03, During Annual Insp of Containment Spray Heat Exchanges,Leaks Discovered in Four Heat Exchangers.Caused by Component Failure & Design.Heat Exchangers to Be Retubed W/Titanium | During Annual Insp of Containment Spray Heat Exchanges,Leaks Discovered in Four Heat Exchangers.Caused by Component Failure & Design.Heat Exchangers to Be Retubed W/Titanium | | | 05000219/LER-1980-009, Forwards Revised LER 80-009/03L-1 | Forwards Revised LER 80-009/03L-1 | | | 05000219/LER-1980-010, Forwards LER 80-010/01T-0 | Forwards LER 80-010/01T-0 | | | 05000219/LER-1980-010-01, /01T-0:on 800220,during IE Bulletin 79-14 Insp, Pipe hangers,NP-2-R8A & NP-2-R8B Found Improperly Installed. Cleanup Sys Restraint Mod & Nonrigid Restraint Added | /01T-0:on 800220,during IE Bulletin 79-14 Insp, Pipe hangers,NP-2-R8A & NP-2-R8B Found Improperly Installed. Cleanup Sys Restraint Mod & Nonrigid Restraint Added | | | 05000219/LER-1980-010-03, /03L-1:on 790417,excavation Was Started to Repair Leak Near Inside Penetration within Pipe Tunnel.Activity Was Detected in Soil Near Dedt Line.Dedt Line Rerouted on 800316.Line Will Be Repaired | /03L-1:on 790417,excavation Was Started to Repair Leak Near Inside Penetration within Pipe Tunnel.Activity Was Detected in Soil Near Dedt Line.Dedt Line Rerouted on 800316.Line Will Be Repaired | | | 05000219/LER-1980-011-03, /03L-0:on 800219,during Surveillance Test,Trip Occurred on Standby Gas Treatment Sys 1.Caused by Cracked Flow Sensing Line Which Was Probably Stepped On.Line Replaced | /03L-0:on 800219,during Surveillance Test,Trip Occurred on Standby Gas Treatment Sys 1.Caused by Cracked Flow Sensing Line Which Was Probably Stepped On.Line Replaced | | | 05000219/LER-1980-011, Forwards LER 80-011/03L-0 | Forwards LER 80-011/03L-0 | | | 05000219/LER-1980-012, Forwards LER 80-012/03L-0 | Forwards LER 80-012/03L-0 | | | 05000219/LER-1980-012-03, /03L-0:on 800228,discovered That Weekly Surveillance Tests for Main Station & Diesel Generator Batteries Not Performed During Seventh Wk.Caused by Error in Personnel.Evaluation Will Be Made to Determine Improvements | /03L-0:on 800228,discovered That Weekly Surveillance Tests for Main Station & Diesel Generator Batteries Not Performed During Seventh Wk.Caused by Error in Personnel.Evaluation Will Be Made to Determine Improvements | | | 05000219/LER-1980-013, Forwards LER 80-013/01T-0 | Forwards LER 80-013/01T-0 | | | 05000219/LER-1980-013-01, /01T-0:on 800309,fire Suppression Water Sys Removed from Svc to Replace Cracked Valve,Contrary to Tech Specs.Fire Truck Pumper Used as Water Supply Backup. Cause of Valve Body Crack Under Investigation | /01T-0:on 800309,fire Suppression Water Sys Removed from Svc to Replace Cracked Valve,Contrary to Tech Specs.Fire Truck Pumper Used as Water Supply Backup. Cause of Valve Body Crack Under Investigation | | | 05000219/LER-1980-014-01, /01T-0:on 800302,emergency Diesel Generator 1 Failed to Synchronize & Tripped When Generator 2 Was Tagged for Mod.Caused by Component Failure.Fuse F7,found Loose in Holder.Fuseholder Repaired | /01T-0:on 800302,emergency Diesel Generator 1 Failed to Synchronize & Tripped When Generator 2 Was Tagged for Mod.Caused by Component Failure.Fuse F7,found Loose in Holder.Fuseholder Repaired | | | 05000219/LER-1980-014, Forwards LER 80-014/01T-0 | Forwards LER 80-014/01T-0 | | | 05000219/LER-1980-015, Forwards LER 80-015/03L-0 | Forwards LER 80-015/03L-0 | | | 05000219/LER-1980-015-03, /03L-0:on 800403,piston Rod on Closure Mechanism for Reactor Bldg Ventilation Automatic Isolation Valve Was Found Broken,Making Valve Inoperable.Caused by Component Failure.New Piston Rod Eye Stud Was Fabricated & Installed | /03L-0:on 800403,piston Rod on Closure Mechanism for Reactor Bldg Ventilation Automatic Isolation Valve Was Found Broken,Making Valve Inoperable.Caused by Component Failure.New Piston Rod Eye Stud Was Fabricated & Installed | | | 05000219/LER-1980-016, Forwards LER 80-016/01T-0 | Forwards LER 80-016/01T-0 | | | 05000219/LER-1980-016-01, /01T-0:on 800512,util Recognized That 800420 Discovery of Defective Pressure Switch,Psl D,Constituted Immediate Rept.Caused by Cocked Teflon Actuator.Switch Removed & Will Be Replaced | /01T-0:on 800512,util Recognized That 800420 Discovery of Defective Pressure Switch,Psl D,Constituted Immediate Rept.Caused by Cocked Teflon Actuator.Switch Removed & Will Be Replaced | | | 05000219/LER-1980-017-01, /01T-0:on 800516,while Performing Control Rod Interference checks,green-green Rod Position Indication Remained Illuminated While Withdrawing Rod 10-23.Caused by Operator & Procedure in Bypass & Component Failure | /01T-0:on 800516,while Performing Control Rod Interference checks,green-green Rod Position Indication Remained Illuminated While Withdrawing Rod 10-23.Caused by Operator & Procedure in Bypass & Component Failure | | | 05000219/LER-1980-017, /03L-0:on 800520,during Investigation of LER 80-17/1T, One Rod Free Travel Interlock Surveillance Requirements Not Performed as Required.Causec by Failure to Perform Procedure & Schedule Surveillance | /03L-0:on 800520,during Investigation of LER 80-17/1T, One Rod Free Travel Interlock Surveillance Requirements Not Performed as Required.Causec by Failure to Perform Procedure & Schedule Surveillance | | | 05000219/LER-1980-018-03, /03L-0:on 800507,during Monthly Surveillance Testing of Reactor High Pressure Scram sensors,RE03D Found to Be Less Conservative than Specified.Caused by Sensor Repeatability.Sensor Reset | /03L-0:on 800507,during Monthly Surveillance Testing of Reactor High Pressure Scram sensors,RE03D Found to Be Less Conservative than Specified.Caused by Sensor Repeatability.Sensor Reset | | | 05000219/LER-1980-018, Forwards LER 80-018/03L-0 | Forwards LER 80-018/03L-0 | | | 05000219/LER-1980-020, Forwards LER 80-020/01T-0 | Forwards LER 80-020/01T-0 | | | 05000219/LER-1980-020-01, /01T-0:on 800605,following Insp of Fire Barriers Protecting safety-related Areas,Several Penetrations Found in Degraded Condition.Caused by Deficiencies in Installation Specs & Personnel Error Re Delay in Establishing Watche | /01T-0:on 800605,following Insp of Fire Barriers Protecting safety-related Areas,Several Penetrations Found in Degraded Condition.Caused by Deficiencies in Installation Specs & Personnel Error Re Delay in Establishing Watches | | | 05000219/LER-1980-021, Has Been Cancelled | Has Been Cancelled | | | 05000219/LER-1980-022-03, /03L-0:on 800603,reactor High Pressure Isolation Condenser Initiation Switch Trip Points Found Less Conservative than Specified.Caused by Unusual Svc Condition. Pressure Switches Reset & Exercised to Ensure Operation | /03L-0:on 800603,reactor High Pressure Isolation Condenser Initiation Switch Trip Points Found Less Conservative than Specified.Caused by Unusual Svc Condition. Pressure Switches Reset & Exercised to Ensure Operation | | | 05000219/LER-1980-022, Forwards LER 80-022/03L-0 | Forwards LER 80-022/03L-0 | | | 05000219/LER-1980-023, Forwards LER 80-023/03L-0 | Forwards LER 80-023/03L-0 | | | 05000219/LER-1980-023-03, /03L-0:on 800523,prior to Inservice Insp Reactor Vessel Hydro,Testing Revealed That Electromatic Relief Valve High Pressure Sensor IA83B Exceeded Tech Spec Setpoint. on 800531,sensor IA83F Found to Exceed Setpoint | /03L-0:on 800523,prior to Inservice Insp Reactor Vessel Hydro,Testing Revealed That Electromatic Relief Valve High Pressure Sensor IA83B Exceeded Tech Spec Setpoint. on 800531,sensor IA83F Found to Exceed Setpoint | | | 05000219/LER-1980-024, Forwards LER 80-024/03L-0 | Forwards LER 80-024/03L-0 | | | 05000219/LER-1980-025, Forwards LER 80-025/01T-0 | Forwards LER 80-025/01T-0 | | | 05000219/LER-1980-025-01, /01T-0:on 800618,during Surveillance Test, Nonfunctioning Operator Discovered in Valves V-9-12 & V-9-8 Found Leaking.Caused by Component Failure.Defective Valves Replaced & Will Be Inspected.Revised Rept Will Follow | /01T-0:on 800618,during Surveillance Test, Nonfunctioning Operator Discovered in Valves V-9-12 & V-9-8 Found Leaking.Caused by Component Failure.Defective Valves Replaced & Will Be Inspected.Revised Rept Will Follow | | | 05000219/LER-1980-026, Forwards LER 80-026/03L-0 | Forwards LER 80-026/03L-0 | | | 05000219/LER-1980-026-03, /03L-0:on 800709,during Routine Testing Insp of Hydraulic Snubbers Installed in safety-related Sys,Snubber 75/5 Failed to Lock Up in Compression Direction.Caused by Foreign Matl in Snubber Fluid.Snubber Flushed & Refilled | /03L-0:on 800709,during Routine Testing Insp of Hydraulic Snubbers Installed in safety-related Sys,Snubber 75/5 Failed to Lock Up in Compression Direction.Caused by Foreign Matl in Snubber Fluid.Snubber Flushed & Refilled | | | 05000219/LER-1980-027, Forwards LER 80-027/01T-0 | Forwards LER 80-027/01T-0 | |
|