ML19263E784
| ML19263E784 | |
| Person / Time | |
|---|---|
| Issue date: | 08/18/1978 |
| From: | Bunch D Office of Nuclear Reactor Regulation |
| To: | Oplinger G NRC OFFICE OF INTERNATIONAL PROGRAMS (OIP) |
| Shared Package | |
| ML19263E783 | List: |
| References | |
| 780821, NUDOCS 7906250243 | |
| Download: ML19263E784 (1) | |
Text
-. - - -.
UNITED STATES y r, J.
NUCLEAR REGULATORY COMMISSION
~$ihC WAsHIN G ton, D. C. 2 Css 5 iy%
j AUG 1s 1m
.Mj750 34..%.,'+j
- " ~
7, 9B l.l!G 2l l1A 9 4I UFCRT/lHFORT
=
AND
.Z '
Gerald G. Oplinger, Assistant Director;frjjNAT*L STGEOS
.T...
MEMORANDUM FOR: Export / import and International Safegu Of fice cf International Programs
-g}-
FROM:
D. F. Bunch, Director 2::
^
Program Support Staff Office of Nuclear Reactor Regulation r'
SUBJECT:
REVIEW OF PROPOSED EXPORT OF COMPONENTS TO THE PHil.lPPINES This is in response to your memorandum of August 9, 1978 regarding the subject matter. We have reviewed the li st of components, at-tached to Westinghouse's application for an export license dated August 4,1978 (enclosed) against the criteria of 10 CFR Part 110, Appendix A.
It is our view that the components listed in Exhibit A of the Westinghouse license application are not specially designed or prepared for use in a nuclear reector and therefore, may be exported under general license. However, the components listed in Exhibit B are identified as NSSS components; therefore, strict application of Criteria (a)(9) of 10 CFR 110, Appendix A would indicate that these components would requi re a speci fic license for export.
I D. F. Bunch, Director Program Support Staff Office of Nuclear Reactor Regulation
Enclosure:
As stated
~_
22\\4 b\\\\
-~-~~.7
- -.7;-
7906250.2d
lA llt
~P' Ref. TFG/NRE-iff58 Westinghouse Power Systems Peter sysesRiggp Electric Corporation Company Panay Cen*
875 C:eentree Reas
! N $[#( 3 9 52 i
August 10, 1978
' d,ty. CF.T
~
ISIERl!AT*L STGnas Mr. Marvin R. Peterson Offics of International Programs U. S. Nuclear Regulatory Conmission Washington, D. C.
20555
Dear Mr. Peterson:
Subject:
Identification of Ship Dates Phi'ippine Nuclear Power Plant Unit No. 1 On behalf of Westinghouse Electric Corporation, we are most appreciative for the cooperation extended in attempting to ease the " equipment delay" burden that confronts Westinghouse.
We have revised Exhibits A and B to include " component ship dates" to en-able the U. S. Nuclear Regulatory Conmission to complete its evaluation.
Very truly yours, WESTINGHOUSE ELECTRIC CORPORATION Power Systems Projects Division JWAo f James P. Rodi Transportation Administrator jf Attachments 2214 3I2 Dur 77Dctsoosc
V-M c.
PURCHASE ORDER PLA-008
~
NSSS COMPONENTS ONLY 1978 PHILIPPINE PROJECT SHIPMENTS t
SHIP DATE COMPONENT SPIN NUMBER
<7-31-78 Waste Holduo Tank PLA-WPATWH-01 7-31-78 Baron Injection Tank PLA-SIATBI-01 7-31-78 Spent Resin Storage Tank PLA-WPATRS-01 8-21-78 Floor Drain Tank PLA-WPATFD-01
/8-25-78 Laundry & Hot Shower Tank PLA-WPATLT-01 9-30-78 Positive Displacement Pump PLA-CSAPPD-01 10-30-78 Recyc. Holdup Tank Vent Ejector PLA-BREJHT-01 10-30-78 Catalytic Hydr. Recomb. Package PLA-CHRECA-01 11-30-78 Pressurizer Relief Tank PLA-RCATPR-01 11-30-78 Neutron Dectr. Posting Device PLA-RCMENP-01 12-31-78 Recyc. Evaporator Reagent Tank PLA-BRATER-01 12-31-78 Recycle Evaporator Conc. Filter PLA-BRFLCM-01 12-31-78 Recycle Evascrator Cond. Filter PLA-BRFLEC-01 12-31-78 Seal Water Injection Filter PLA-CSFLSI-01 12-31-78 Butterfly Valves PLA-GAHEBF-01 12-31-78 Cont. Valves PLA-GAHECV-01 12-31-78 Diaphragm Valves PLA-GAHEDV-01 12-31-78 FW Cont. Valves PLA-GAHEFC-01 12-31-78 Man Op. Gate & Sw Check Valves PLA-GAHEGC-01 12-31-78 GP Cont. Valves PLA-GAHEGP-01 12-31-78 GLB Valves PLA-GAHEGV-Cl 12-31-78 Motor Operated Gate Valves PLA-GAHEMG-01 12-31-78 Press Spray Valves PLA-GAHEPS-01 12-31-78 Auxiliary Relief Valves PLA-GAHERV-01 12-31-78 Pressure Safety Valves PLA-GAHESY-01 12-31-78 Waste Gas Decay Tank (6)
PLA-GHATGD-01 12-31-78 S. I.S. Accumulator (2)
PLA-SI ATAT-01 12-31-78 Waste Evaporator Reagent Tank PLA-WPATRT-01 ESTIMATED TOTAL COST
$5,200,000 2214 313
7 EXHIE!-
7 b '.
BALANCE OF PLANT EQUIPMENT ONLY 1978 PHILIPPINE PROJECT SHIPMENTS t
B&R PURCHASE SPECIFICATION ORDER
- DOLLAR SHIP DATE COMPONENT NUMBER NUMBER VALUE VENDOR 2-19 78 Crane Runway Girder C305 PLA-054 5 757,235 Morgan Crane 3-14-78 Crane Runway Rails 8-15-78 Containment Polar Crane Embedded Process Piping G528 PLU-076 500,000 Undetennined 7-1-78 Potable Water Transfer Pump B499 PLU-009 18,081 Ingersoll-Rand 8-1-78 Circuit Breakers Per W Catalog PLA-059 1,619,727 W Trafford 8-3-78 Auxiliary Boiler G316 PLA-166 264,375 B&W - Ohio 9-1-78 Stainless Steel Liners J504 PLA-442 427,020 Jessop Steel 9-1-78 Fire Protection System B497 PLU-063 300,000 ITT-Gri nnel l 9-1-78 Conventional Valves G332 PLA-313 67,323 Crane 9-6-78 Copper-Nickel Pipe G360 PLU-069 95,709 Camden 10-1-78 Sewage Treatment Plant B496 PLA-030 55,194 Cantex 10-2-78 Air Handling Units B501 PLA-268 630,000 CVI 10-15-78 Miscellaneous Steel J303/J301 PLA-445 197,342 Pittsburgh Bridge J503/J501 and Iron 11-1-78 Twisted Cable E518 PLA-294 926,906 Kerite 11-1-78 Air Compressors G352 PLA-175 68,499 Gardner Denver 11-25-78 Transfer Switches E521 PLA-207 52,803 Pacs Industries In, 12-14-78 Water Chillers B503 PLA-272 464,000 W Staunton 12-21-78 Heat Exchangers (CC)
G513 PLA-131 380,000 Joseph Oats 12-31-78 Hangers (Partial)
H500 PLA-136 2,500,000 Basic Engineers 12-31-78 Piping (Partial)
G528/G360 PLA-076 5,700,000 Tubeco
- This price is actual purchase order cost.