i.
-
UNITED STATTS
- g*M%g
.
o
NUCLEAR REGULATORY COMMISSION
g
E
o
REGloN If
5
eE
101 M ARIETTA sTF.E ET, N.W.
'#
ATLANTA, GEORGIA 30303
o,g.....[
n nrt i 6 1979
In Reply Refer To:
RII:RFRIII
50-321/79-8
50-366/79-10
Georgia Power Company
ATTN:
Mr. J. H. Miller, Jr.
Executive Vice President
270 Peachtree Street, N.W.
Atlanta, Georgia 30303
Gentlemen:
This refers to the inspection conducted by R. F. Rogers of this office on
December 16-19, 1978, January 1-3,
and January 29 - February 9,
1979, of
activities authorized by NRC License Nos. DPR-57 and NPF-5 for the Plant
Hatch facilities, and to the discr.ssion of our findings held with Mr. M. Manry
periodically during the inspection intervals.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews
with personnel, and observations by the inspector.
During the inspection, it was found that certain activities under your license
appear to be in noncompliance with NRC requirements. These items and references
to pertinent requirements are listed in the Notice of Violation enclosed here-
with as Appendix A.
This notice is sent to you pursuant to the provisions of
Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal
Regulations.
Section 2.201 requires you to submit to this office, within 20
days of your receipt of this notice, a written statement or explanation in reply
including: (1) corrective steps which have been taken by you and the results
achieved; (2) corrective steps which will be taken to avoid further noncom-
pliance; ano (3) the date when full compliance will be achieved.
One new unresolved item resulted from this inspection and is discussed in the
enclosed report. We are concerned about this item involving a Unit 2 short
period which occurred on January 31, 1978. In your response to this letter,
please address the steps taken to improve your administrative controls and
operator training to preclude recurrence of similar events.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room. If this
report contains any information that you (or your contractor) believe to be
2287
040
79062005'/o
.
.
,
~
.
.
,
,
Georgia Power Company
-2-
MAR 4 6 1979
proprietary, it is necessary that you make a written application within 20
days to this office to withhold such information from public disclosure. Any
such application must include a full statement of the reasons on the basis of
which it is claimed that the information is proprietary, and should be prepared
so that proprietary information identified in the application is contained in
a separate part of the document. If we do not hear from you in this regard
within the specified period, the report will be placed in the Public Document
Room.
Should you have any questions concerning this letter, we will be glad to
discuss them with you.
Sincerely,
SC
b
-
3
eqi James P. O' Reil y
gDirector
Enclosures:
1.
Appendix A, Notice of Violation
2.
Inspection Report Nos. 50-321/79-8
and 50-366/79-10
cc w/ encl:
2287
041
Mr. M. Manry, Plant Manager
Plant E. I. Hatch
P. O. Box 442
Baxley, Georgia 31513
Mr. C. E. Belflower
Site QA Supervisor
Plant E. I. Hatch
P. O. Box 442
Baxley, Georgia 31513
i