Respond to NRC 790424 Telcon Re Violations Noted in IE Insp Repts 50-321/79-08 & 50-366/79-10.Corrective Actions:Tech Specs Re Inoperability Reporting Will Be Followed & Test Acceptance Criteria Will Be Followed
ML19263E626
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 05/08/1979
From: Staffa R
GEORGIA POWER CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19263E622 List:
References
NUDOCS 7906200532
Download: ML19263E626 (1)


Text

  • Goonjh Power Cornpwy t

P30 Peachtree Street Post 0:f.co Box 4545 At:anta, Goorgi' 30303 Telephor's 404 d22 6000

~

m O

z.:

Georgia PowcR Power Supply Engineering and Services

,- m May 8, 1979 s,

United States Nuclear Regulatory Commission Office of Inspection and Enforcement

REFERENCE:

Region II - Suite 3100 RII: PJR, III 101 Marietta Street 50-321/79-8 Atlanta, Georgia 30303 50-366/79-10 ATTENTION:

Mr. James P.

Gentlemen:

As a result of a celephone cor-

"ation on April 24, 1979, with Mr. R. F.

Rogers, NRC Resident Inspector at PA'

' Hatch, the following additional infor-mation to our response dated April 10, 1979, is submitted herewith.

50-366/79-10-01 (Infraction)

In the future if a componer.t fails in any mode t, perform its intended function, it will be declared inoperable, and if required by the Technical Specifications the inoperability will be reported to the NRC. That same com-ponent will not be declared operable until acceptable operability has been demonstrated in the same mode as the original failure.

50-366/79-10-02 (Infraction)

The Georgia Power test supervisors have been cautioned against deviating from the reporting requirements for failure to meet test acceptance criteria.

Also notification of Plant Management will be made promptly should test results be unacceptable.

Very truly yours,

/

l 9

/

.l h

./ 4

/

R. W.'

ta Mana 4r of uality Assurance DRS/bg 2287 039 7906200532 Nd/fb' GWIGLEL OOPY