't
a nao
UNITED STATES
ug#o,
NUCLEAR REGULATORY COMMISSION
~M , }
,
o
REGloN il
a$
101 MARIETTA STREET, N.W.
k4
(%,,,,p#
ATLANTA, GEORGIA 30303
FEB
6 1979
,
In Reply Refer To:
RII:JRH
50-424/79-1
50-425/79-1
Georgia Power Company
ATTN:
Mr. J. H. Miller, Jr.
Executive Vice President
270 Peachtree Street, N.W.
Atlanta, Georgia 30303
Gentlemen:
This refers to the inspection conducted by Mr. J. R. Harris of this office on
January 10-12, 1979 of activities authorized by NRC Construction Permit
Nos. CPPR-108 and CPPR-109 for the Alvin W. Vogtle, Units 1 and 2 facility,
and to the discussion of our findings held with Mr. D. M. Fiquett, Manager,
Field Operations at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews
with personnel, and observations by the inspector.
We have examined actions you have taken with regard to previously identified
enforcement matters. These are discussed in the enclosed inspection report.
One new unresolved item resulted frota this inspection and is discussed in the
enclosed report. This item will be examined during subsequent inspections.
During the inspection, it was found that certain activities under your
,
license appear to be in noncompliance with NRC requirements. This item and
references to pertinent requirements are listed in the Notice of Violation
enclosed herewith as Appendix A.
This notice is sent to you pursuant to the
provisions of Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10,
Code of Federal Regulations. Section 2.201 requires you to submit to this
office, within 20 days of your receipt of this notice, a written rtatement or
explanation in reply including:
(1) corrective steps which hve been taken
by you and the results achieved; (2) corrective steps which will be taken to
avoid further noncompliance; and (3) the date when full compliance will be
achieved.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room. If this
7903200463
.
FEB
6 1979
.
.
Georgia Power Company
-2-
report contains any information that you (or your contractor) believe to be
p roprieta ry , it is necessary that you make a written application within 20
days to this office to withhold such information from public disclosure. Any
such application must include a full statement of the reasons on the basis of
which it is claimed that the information is proprietary, and should be prepared
so that proprietary information identified in the application is contained in
a separate part of the document. If we do not hear from you in this regard
within the specified period, the report will be placed in the Public Document
Room.
Should you have any questions concerning this letter, we will be glad to
discuss them with you.
Sincerely,
Charles E.
u rphy ,
ief
Reactor Constr
ton and Engineering
Support Branch
Enclosure:
1. Appendix A, Notice of Violation
2. Inspection Report Nos.
50-424/79-1 and 50-425/79-1
cc w/ enc 1:
Mr. K. M. Gillespie
Construction Project Manager
Vogtle Nuclear Plant
P. O. Box 282
Waynesboro, Georgia 30830
Mr. E. D. Groover
.
QA Site Supervisor
Vogtle Nuclear Plant
P. O. Box 282
Waynesboro, Georgia 30830
'