ML19263D033
| ML19263D033 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 02/23/1979 |
| From: | Staffa R GEORGIA POWER CO. |
| To: | Murphy C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| Shared Package | |
| ML19263D027 | List: |
| References | |
| X7BG10, NUDOCS 7903200455 | |
| Download: ML19263D033 (1) | |
Text
Georg.a Power Company Q{
230 Peachtree Street Pot,t Office Box 4545 IO N II,-
A :anta. Georgia 30303 Telephone 404 522-6060
' C JA IS TEB23 p 4,. 3g GeorgiaPower Power Supply Engineering and Servic..
Ite sourten ekttic system February 23, 1979 United States Nuclear Regulatory Commission Directorate of Inspection and Enforcement Region II 101 Marietta Street, N.W.
REFERENCE:
Atlanta, GA 30303 IE: II: WBS 50-424/79-01 Attn: Mr. C. E. Murphy 50-425/79-01 File:
X78G10 Gentlemen:
1 The Georgia Power Company wishes to submit the following information concerning the noncompliance discussed in your inspection report number 50-424/79-01 and 50-425/79-01.
Georgia Power Company has ordered a Rainhart Catalog No. 620 Sieve Inspector. A procedure for checking sieves for confermance to ASTM' Ell will be developed utilizing the manufacturers instructions.
Full compliance will be achieved by March 9, 1979.
The information contained in the inspection report is not considered to be proprietary.
Vrytrulyhours, l.
h-j R. W, taffa
/
i CWH:aaw xc:
M. D. Hunt NRC - Region II 7903200456