Forwards IE Insp Repts 50-259/78-30,50-260/78-33 & 50-296/78-31 on 781113-17 & Notice of Violation
ML19263B983
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 12/07/1978
From: Sutherland J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Niav Hughes
TENNESSEE VALLEY AUTHORITY
Shared Package
ML19263B980 List:
References
NUDOCS 7901260156
Download: ML19263B983 (2)


See also: IR 05000259/1978030

Text

e

g >* " f G ug

UNITED STATES

/

o,

NUCLEAR REGULATORY COMMIS510N

$

'n

REGloN n

(

_,

$

101 M ARIET T A sTREE T . N W.

2

  • k *-* ' /

f

ATL ANT A, GE oRGI A 30303

.

%.** **

DEC 0 71978

.

In Reply Refer To:

RII:LLJ

,

-

50-259/78-30

50-260/78-33

50-296/78-31

Tennessee Valley Authority

.

ATTN:

Mr. N. B. Hughes

Manager of Power

830 Power Building

Chattanooga, Tennessee 37401

Gentlemen:

This refers to the inspection conducted by Mr. L. L. Jackson of this office

on November 13-17, 1978, of activities authorized by NRC Operating License

Nos. DPR-33, DPR-52, and DPR-68 for the Browns Ferry 1,

2, and 3 f acility,

and to the discussion of our findings held with Mr. J. G. Dewease at the

conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report, Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews

with personnel, and observations by the inspector.

We have examined actions you have taken with regard to previously identified

enforcement matters. These are discussed in the enclosed inspection report ,

One new unresolved item resulted from this inspection and is discussed in the

enclosed report. This item will be examined during subsequent inspections.

During the inspection, it was found that certain activities under your

license appear to be in noncompliance with NRC requirements. This item and

references to pertinent requirements are listed in the Notice of Violation

enclosed herewith as Appendix A.

This notice is sent to you pursuant to the

provisions of Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10,

Code of Federal Regulations.

Section 2.201 requires you to submit to this

office, within 20 days of your receipt of this notice, a written statement or

explanation in reply inc luding

(1) corrective steps which have been taken

by you and the results ac hieved; (2) corrective steps which will be taken to

avoid further noncompliance, and (3) the date when full compliance will be

achieved.

.

..

,

,,

,

,.

,

-

isG

o

790126015 6

.

.

DEC 0 71978

Tennessee Valley Authority

-2-

,

In accordance with Section 2.790 of the NRC's " Rules of Prattice ," Pa rt 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room. If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20

days to this of fice to withhold such information from public disclosure. Any

such applica' ion must include a full statement of the reasons on the basis of

which it is claimed that the information is proprietary, and should be prepared

so that proprietary information identified in the application is contained in

a separate part of the document. If we do not hear from you in this regard

within the specified period, the report will be placed in the Public Document

Room.

Should you have any questions concerning this letter, we will be glad to

discuss them with you.

'}l

'

i ){ '~> . -

'

l

J. T. Sutherland, Chief

'

' 'I Fuel Facility and Materials

Safety Branch

Enclosure:

1.

Appendix A, Notice

of Violation

2.

Inspection Report Nos. 50-259/78-30,

50-260/78-33 and 50-296/78-31

cc w/ encl:

Mr. J. G. Dewease

Plant Superintendent

Box 2000

Decatur, Alabama 35602

.

R

.

/

,'.