ML19263B452
| ML19263B452 | |
| Person / Time | |
|---|---|
| Site: | Brunswick |
| Issue date: | 12/05/1978 |
| From: | Long F NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Jackie Jones CAROLINA POWER & LIGHT CO. |
| Shared Package | |
| ML19263B442 | List: |
| References | |
| NUDOCS 7901180267 | |
| Download: ML19263B452 (2) | |
See also: IR 05000324/1978030
Text
.
,
.
UNITED sT ATEs
0d "800g
.
[9
jo,
NUCLEAR REGULATORY COMMISSION
,
R EGloN il
{
) e,(
g
101 M ARIETT A STREET.N.W.
- "*
.-
g
o,
[
ATLANTA, CEoRGIA 30303
s, * *s- ,#
DEC 0 51978
In Reply Refer To:
RII:BWR
50-324/78-30
50-325/78-30
.
.
Carolina Pow:r and Light Company
ATTN:
Mr. J. A. Jones
Executive Vice President
Engineering, Construction
and Operation
336 Fayetteville Street
Raleigh, North Carolina 27602
Gentlemen:
This refers to the inspection conducted by Mr. B. W. Riley of this
office on November 15-17, 1978 of activities authorized by NRC License
Nos. DPR-71 and DPR-62 for the Brunswick I and 2 facilities, and to the
discussion of our findings held with Mr. A. C. Tollison at the conclusion
of the inspection.
Areas examined during the inspection and our findings are discussed in
the enclosed inspection report. Within these areas, the inspection
consisted of selective examinations of procedures and representative
records, interviews with personnel, and observations by the inspectors.
During the inspection, it was found that certain activities under your
license appear to be in noncompliance with NRC requirements. This item
and references to pertinent requjrtments are listed in the Notice of
Violation enclosed berewith as Appendix A.
This notice is sent to you
pursuant to the provisions of Section 2,201 of the NRC's " Rules of
Practice," Part 2, Title 10, Code of Federal Regulations.
Section 2.201
requires you to submit to this office, within 20 days of your receipt of
this notice, a written statement or explanation in reply including:
(1)'
corrective steps which have been taken by you, and the results achieved;
(2) corrective steps which will be taken to avoid further noncompliance;
and (3) the date when full compliance will be achieved.
7 9 0118 0 2(b 7
.
.
DEC 0 51978
.
Carolina Power and
Light Company
-2-
Should you have any questions concerning this letter, we vill be glad to
discuss them with you.
Sincerely,
__
'
F. J. Long, Chief',
Reactor Operations and
Nuclear Support Branch
Enclosure:
1.
Appendix A, Notice of Violation
2.
Inspection Report Nos. 50-325/78-30
and 50-324/78-30
cc w/ enclosures:
Mr. A. C. Tollison, Jr.
Plant Manager
Box 458
Southport, North Carolina 28461