Text
.
.
.
UNITED sT ATEs
y[g >* "f Gug
NUCLEAR REGULATORY COMMISSION
o,
- , . ([ ,g
REGloN il
- "
101 M ARIETT A STREET.N.W.
" gf
g
o
j
....."
N OV 0 9 1978
In Reply Refer To:
RII:RHW
50-321/78-36
50-366/78-45
.
Georgia Power Company
Attn: Mr. J. H. Miller, Jr.
Executive Vice President
270 Peachtree Street, N. W.
Atlanta, Georgia
30303
Gentlemen:
This refers to the inspection conducted by Mr. R. H. Wessman of this office
on November 6-9, 1978, of activities authorized by NRC Operating License
Nos. DPR-57 and NPF-5 for the E. I. Hatch Units 1 and 2 facilities, and to
the discussion of our findings held with Mr. M. Manry at the conclusion of
the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted
of selective examinations of procedures and representative records, inter-
views with personnel, and observations by the inspectors.
Three new unresolv-d items resulted from this inspecti~i and are discussed
in the enclosed report.
These items will be examined during subsequent
inspections.
During the inspection, it was found that certain activities under your
license appear to be in noncompliance with NRC requirements. These items
and references to pertinent requirements are listed in the Notice of Viola-
tion enclosed herewith as Appendix A.
This notice is sent to you pursuant
to the provisions of Section 2.201 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations.
Section 2.201 requires you to
submit to this office, within 20 days of your receipt of this notice, a
written statement or explanation in reply including:
(1) corrective steps
which have been taken by you and the results achieved; (2) corrective steps
which will be taken to avoid further noncompliance; and (3) the date when
full compliance will be achieved.
vs01180(M
.
.
.
.
.
Georgia Power Company
-2-
NOV c b 137b
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room. If This
report contains any information that you (or your contractor) believe to be
proprietary, it is necessary that you make a written application within 20
days to this office to withhold such information from public disclosure.
Any such application must include a full statement of the reasons on the
basis of which it is claimed that the information is proprietary, and should
be prepared so that proprietary information identified in the application is
contained in a separate part of the document. If we do not hear f rom you in
this regard within the specified period, the report will be placed in the
Public Document Room.
Should you have any questions concerning this letter, we will be glad to
discuss them with you.
Sincerely,
^
F. J. Long, Chie
Reactor Operations and
Nuclear Support Branch
Enclosures:
1.
Appendix A, Notice of Violation
2.
Inspection Report Nos. 50-321/78-36
and 50-366/ 78-45
cc w/ encl:
Mr. C. E. Belflower
Site QA Supervisor
Plant E. I. Hatch
P. O. Box 442
Baxley, Georgia
31513
Mr. M. Manry, Plant Manager
Plant E.1. Hatch
P. O. Box 442
Baxley, Georgia
31513