ML19263B380

From kanterella
Jump to navigation Jump to search
Responds to NRC Re Violations Noted in IE Insp Repts 50-321/78-36 & 50-366/78-45.Corrective Actions: Personnel Have Been Instructed to Prevent Further Failure to File Rept for Conditions That Degrade Sys Operability
ML19263B380
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 12/20/1978
From: Staffa R
GEORGIA POWER CO.
To: Long F
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19263B379 List:
References
NUDOCS 7901180129
Download: ML19263B380 (1)


Text

Ge>g a Po*er Company 230 Peat" ee $"ee?

Pos? 0".ce 8c 4545 Aw?a Getag a V303 Te q we 404 5.^2 6060 m

Poirer Supply Engineering and Serv 6ces g,

g)

December 20, 1978 United States Nuclear Regulatory Commission

REFERENCE:

Of fice of Inspection and Enforcement RII: FSC Region II - Suite 1217 50-321/78-36 101 Marietta Street 50-366/78-45 Atlanta, Georgia 30303 ATTENTION:

Mr. F. J. Iong Gentlemen:

The Georgia Power Company of fers the following information in response to your letter dated November 29, 1978, describing apparent noncompliances with NRC requirements noted during your November 6 - 9, 1978, inspection of the Hatch Nuclear Plant.

321/78-36-06 concerned the failure of plant per-Item of noncompliance procedural requirements concerning the possible inoperable sonnel to meet Although the error status of the diesel generator serving the D-RHR pump.

was that of personnel and not procedural, we feel more definitive instructions in H';P-8 (Maintenance Request Procedure) will help prevent further occurrences that the The procedure will be revised to include a requirement of this type.supervisor and the shift supervisor, in their review of the mainte-department how the prior to the work being performed, look specifically at nance request maintenance would affect the operability of safety equipment. The procedure revision is to be completed by January 20, 1979.

Item of noncompliance 321/78-36-07 concerned the failure of plant per-The relay the inoperability of IE11-K126 time delay relay.

sonnel to report was found to be inoperable on April 12, 1978, and was repaired satisfactorily for this condi-on June 27, 1978. Tech Specs require a 30 day written report tion. The error resulted from personnel not recognizing this failure as This item was reviewed with personnel to degrading the system operability.

prevent further occurrences of this type.

contains no information which is believed to be The inspection report proprietary.

Very truly yours,

/

b' R. W. Staffa Manager of Quality Assurance 90 e' -

JAB /bg 7901180 y