ML19262A725
| ML19262A725 | |
| Person / Time | |
|---|---|
| Site: | Calvert Cliffs |
| Issue date: | 11/19/1979 |
| From: | Reid R Office of Nuclear Reactor Regulation |
| To: | Lundvall A BALTIMORE GAS & ELECTRIC CO. |
| Shared Package | |
| ML19262A726 | List: |
| References | |
| NUDOCS 7912100422 | |
| Download: ML19262A725 (2) | |
Text
3 b dur_ ha Nt %
/C p >* "E c
'C, UNITED STATES
.~
[%,( )
NUCLEAR RCGULATORY COMMISSION WASHINGTON, D. C. 20555
., M 'U ' '. f M ' "/
f 2,
November 19, 1979
%{'
Docket No. 50-318 Mr. A. E. Lundvall, Jr.
Vice President - Supply Baltimore Gas & Electric Company P. O. Box 1475 Baltimore, Maryland 21203
Dear Mr. Lundvall:
The Commission is issuing the enclosed Safety Evaluation to document our analysis of the acceptability of Cycle 3 operations of Calvert Cliffs Nuclear Power Plant, Unit No. 2, with sleeved guide tubes in fuel assemblies under Control Element Assemblies (CEA).
Our analysis is based on the staff observation of the inspection program at the plant site on October 29, 1979, and your submittals of July 11, September 7, October 10, and November 12, 1979, which document your inspection program, the results of the inspections, and the recrimping of sleeves previously crimped in irradiated fuel assemblies.
Based on our review, we conclude that the facility may be operated at the licensed power level through Cycle 3.
We concur with the Combustion Engineering recommendation to lift the limitation that prohibits control rod movement when the reactor coolant system is below 400 F.
The continued acceptable performance of the CEA and the CEA guide tube sleeves will need to be evaluated at the end of Cycle 3 and each cycle until a permanent repair is identified.
Your staff has agreed to pro-vide such an evaluation program at least 90 days prior to the shutdown of Calvert Cliffs, Unit No. 2, for the Cy:le 4 reload outage. Although our staff continues to consider the sleeving of CEA guide tubes an interim repair, in recent discussions with your staff we suggested the possibility of developing Technical Specifications to control this mode of operation in the interim period.
Such a Technical Specification proposal should include specifications on the sleeve design and installa-tion and on surveillance requirements for inspections to be performed each refueling. This type of proposal could be made anytime and would require about 90 days to evaluate.
Sincerely, O
f O
e
%oj+ !"
// R u 6 6bert W. Raid, Chief Operating Reactors Branch #4 Division of Operating Reactors
Enclosure:
Safety Evaluation 1523 0,50 cc:
w/ enclosure 7 912104 + 3 E See next page
Saltinore Gas and Electric Conpany cc w/ enclosure (s):
Janes A. Biddison, Jr.
lir. Bernard Fowler General Counsel President, Board of County G and E Building Comnissioners Charles Center Prince Frederick,11aryland 20768 Bal timore,11a ryl and 21203 Director, Technical Assessment George F. Trowbridge, Esquire Division Shaw, Pittman, Potts and Office of Radiation Programs Trowbridge (AW-459) 1800 t1 Street, N.W.
U. S. Environmental Protection Agency Washington, D. C.
20036-Crystal Mall #2 Arlington, Virginia 20460 fir. R. C. L. Olson Baltinore Gas and Electric Company V. S. Environmental Protection Agency Roon 922 - G and E Building Region III Of fice Post Office Box 1475 ATTN:
EIS COORDINATOR Bal tipure, Maryland 21203 Curtis Building (Sixth Flonr)
Sixth and Walnut Streets fir. Leon B. Russell, Chief Engineer Philadelphia, Pennsylvania 19106 Calvert Cliffs Huclear Power Plant Baltimore Gas and Electric Company cc w/4 cys enclosures and 1 cy Lusby, flaryland 206S7 of BG&E filings dtd: 7/11/79, 9/7/79, 10/10/79, and 11 '12/79 Bechtel Power Corporation Adninistrator, Power Plant Siting Program ATTH:
fir. J. C. Judd Energy and Coastal Zone Administration Chief Huclear Engineer Department of hatural Resources 1574u Shady Grove Road Tawes State Of fice Building Gaithersburg, llaryland 20760 Annapolis, liaryland 21431 Combustion Engineering, Inc.
ATTN:
ftr. P. W. Kruse,llanager Engineering Services Post Office Box 500 Windsor, Connecticut 06095 Calvert County Library Prince Frederick, liaryland 20678 Director, Departaent of State Planning 301 West Preston Street Baltinore, flaryland 21201 f *r. R. fl. Douglass, flanager Guality Assurance Department Rcor 923 Gas & Electric Building P. O. Box 1475 Eai tinore, tb ryland 21203 1523 351