Text
gn neco T
- p
'o llNITED STATES l'
,. 7 f ',n NUCLEAR REGULATORY COMMISSION 3
REGION 111 3-799 ROOSEVELT ROAD o
%qss
,e'#
GLEN ELLYN. ILLINOls 60137 Docket No. 50-409 N0;, '
Dairyland Power Cooperative ATTN:
Mr. F. W. Linder Genera l Manager 2615 East Avenue - South La Crosse, WI 54601 Gentlemen:
The enclosed IE Information Notice No. 79-28 provides information on the overloading of structural elements due to pipe support loads.
Sincerely, a 6).
gJamesG.Keppler
// Director
Enclosure:
IE Information Notice No. 79-28 cc w/ encl:
Mr. R. E. Shimshak, Plant Superintendent Central Files Director, NRR/DPM Director, NRR/ DOR PDR Local PDR NSIC TIC Anthony Roisman, Esq.,
Attorney 1527 282
.r91c100
9 SSINS No.:
6870 Accession No.: 79102504 5 UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D.C.
20555 November 16, 1979 IE Information Notice No. 79-28 OVERLOADING OF STRUCTURAL ELEMENTS DUE TO PIPE SUPPORT LOADS Description of Circumstances:
Recently, the NRC was informed that, in the course of the inspections pursuant to IE Bulletin No. 79-02 and 79-14 by the Portland General Electric Co. (PGE) at the Trojan Nuclear Plant, some walls were found which did not have adequate structural strength to sustain the required support reactions.
Bechtel Corporation was the Architect Engineer for the plant.
These structural inadequacies were reported to be attributable to two deficiencies:
1)
Apparent lack of a final check of certain pipe support locations and reactions to ensure that the supporting structural elements possessed adequate structural integrity to sustain the required loads.
2)
Inadequate design criteria for the reactions from supports anchored into the face of concrete block walls; e.g., relying on the combined strength of double concrete block walls without positive connection between the two walls by means other than the bor.d provided by a layer of grout between them.
The NRC is currently pursuing these issues in detail for tte Trojan Nuclear Plant to determine the extent of these deficiencies and the gener u implications for other Bechtel facilities.
This Information Notice is provided as an early notification of a possible signif-icant matter.
It i; expected that recipients will review the information for pocsible applicability to their facilities and the actions being performed under IE Bulletin No. 79-02.
Specific action is being requested relating to the adequacy of attachments to concrete block walls under IE Bulletin No. 79-02, Revision 2, item 5.c.
No specific actions are requestea in response to this Information Notice.
If NRC evaluations so indicate, further licensee actions may be requested or required.
If you have any questions regarding this matter, please contact the Director of the appropriate NRC Regional Office.
n No written response to this IE Information Notice is required.
, [
Ll J
Enclosure:
Recently Issued JE Information Notices P00R ORMM 1527 283
J IE Information Notice No. 79-28 Enclosure November 16, 1979 RECENTLY ISSUED IE INFORMATION NOTICES Information Subject Date Issued To Notice No.
Issued 79-27 Steam Generator Tube 11/16/79 All power reactor facilities Ruptures At Two PWR holding OLs and cps Facilities79-12A Attempted Damage To New 11/9/79 All Fuel Facilities, Fuel Assemblies research reactors, and power reactors with an OL or CP 79-26 Breach of Containment 11/5/79 All power reactor facilities Integrity holding OLs and cps 79-25 Reactor Trips At Turkey 10/1/79 All power facilities with Point Units 3 Ano 4 an OL or a CP 79-24 Overpressurization Of 10/1/79 All power reactor facilities Containment Of A PWR Plant with a CP After A Main Steam Line Break 79-23 Emergency Diesel Generator 9/26/79 All power reactor Lube Oil Coolers facilities holding OLs and cps 79-22 Qualification of Control 9/14/79 All power reactor Systems facilities with operating licenses and construction permits.
79-21 Transportation and Commercial 9/7/79 All power and research Burial of Radioactive Material reactors with OL's 79-20 NRC Enforcement Policy 9/7/79 All Holders of Reactor (Rev. 1)
NRC Licensed Individuals OLs and cps and Production Licensees with Licensed Operators 79-20 NRC Enforcement Policy 8/14/79 All Holders of Reactor NRC Licensed Individuals OLs ana cps and Production Licensees with Licensed Operators
} [)27