ML19262A675

From kanterella
Jump to navigation Jump to search
Forwards IE Info Notice 79-28, Overloading of Structural Elements Due to Pipe Support Loads. No Response Required
ML19262A675
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 11/16/1979
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Davidson D
CLEVELAND ELECTRIC ILLUMINATING CO.
References
NUDOCS 7912100221
Download: ML19262A675 (1)


Text

/

UNITED STATES 8')3,,(('

NUCLEAR REGULATORY COMMISSION s

REGION lil o ; ' N [j[

799 ROOSEVELT ROAD g

GLEN ELLYN, ILLINOIS 60137 Docket No. 50-440 NC'.' ! : Fi Docket No. 50-441 The Cleveland Electric Illun.inating Company ATTN:

Mr. Dalwyn R. Davidson Vice President System Engineering and Construction P. O. Box 5000 Cleveland, OH 44101 Gentlemen:

The enclosed IE Information Notice No. 79-28 provides information on the overloading of structural elements due to pipe support loads.

Sincerely, JamesG.Kepplerl

%b -

Director

Enclosure:

IE Information Notice No. 79-28 cc w/ enc 1:

Central Files Director, NRR/DPM Director, NRR/ DOR PDR Local PDR NSIC TIC Harold W. Kohn, Power Siting Commission Mr. Daniel D. Wilt, Attorney 1527 187 79121 00 t

SSINS No.:

6870 0

Accession No.: 79102504 5 UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D.C.

20555 November 16, 1979 IE Information Notice No. 79-28 OVERLOADING OF STRUCTURAL ELEMENTS DUE TO PIPE SUPPORT LOADS Description of Circumstances:

Recently, the NRC was informed that, in the course of the inspections pursuant to IE Bulletin No. 79-02 and 79-14 by the Portland General Electric Co. (PGE) at the Trojan Nuclear Plant, some walls were found which did not have adequate structural strength to sustain the required tapport reactions.

Bechtel Corporation was the Architect Engineer for the plant.

These structural inadequacies were reported to be attributable to two deficiencies:

1)

Apparent lack of a final check of certain pipe support locations and reactions to ensure that the supporting structural elements possessed adequate structural integrity to sustain the required loads.

2)

Inadequate design criteria for the reactions from supports anchored into the face of concrete block walls; e.g.,

relying on the combined strength of double concrete block walls without positive connection between the two walls by means other than the bond provided by a layer of grout between them.

The NRC is currently pursuing these issues in detail for the Trojan Nuclear Plant to determine the extent of these deficiencies and the generic implications for other Bechtel facilities.

This Information Notice is provided as an early notification of a possible signif-icant matter.

It is expected that recipients will review the information for possible applicability to their facilities and the actions being performed under IE Bulletin No. 79-02.

Specific action is being requested relating to the adequacy of attachments to concrete block walls under IE Bulletin No. 79-02, Revision 2, item 5.c.

No specific actions are requested in response to this Information Notice.

If NRC evaluations so indicate, further licensee actions may be requested or required.

If you have any questions regarding this matter, please contact the Director of the appropriate NRC Regional Office.

No written response to this IE Information Notice is required.

Enclosure:

Recently Issued 1527 188 IE Information Notices m'

D

'3

~9 9

9c

m. J a

IE Information Notice No. 79-28 Enclosure November 16, 1979 g

RECENTLY ISSUED IE INFORMATION NOTICES Information Subject Date Issued To Notice No.

Issued 79-27 Steam Generator Tube 11/16/79 All power reactor facilities Ruptures At Two PWR holding OLs and cps Facilities79-12A Attempted Damage To New 11/9/79 All Fuel Facilities, Fuel Assemblies research reactors, and power reactors with an OL or CP 79-26 Breach of Containment 11/5/79 All power reactor facilities Integrity holding OLs and cps 79-25 Reactor Trips At Turkey 10/1/79 All power facilities with Point Units 3 And 4 an OL or a CP 79-24 Overpressurization Of 10/1/79 All power reactor facilities Containment Of A PWR Plant with a CP After A Main Steam Line Break 79-23 Emergency Diesel Generator 9/26/79 All power reactor Lube Oil Coolers facilities holding OLs and cps 79-22 Qualification of Control 9/14/79 All power reactor Systems facilities with operating licenses and construction permits.

79-21 Transportation and Commercial 9/7/79 All power and research Burial of Radioactive Material reactors with OL's 79-20 NRC Enforcement Policy 9/7/79 All Holders of Reactor (Rev. 1)

NRC Licensed Individuals OLs and cps and Production Licensees with Licensed Operators 79-20 NRC Enforcement Policy 8/14/79 All Holders of Reactor NRC Licensed Individuals OLs and cps and Production Licensees with Licensed Operators

.nG

\\55-l O