ML19262A304
Jump to navigation
Jump to search
| ML19262A304 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 05/06/1974 |
| From: | Jennifer Davis US ATOMIC ENERGY COMMISSION (AEC) |
| To: | John Miller METROPOLITAN EDISON CO. |
| Shared Package | |
| ML19262A305 | List: |
| References | |
| NUDOCS 7910260632 | |
| Download: ML19262A304 (1) | |
Text
,.
MM 6 Metropolitan Edison Company Docket No. 50-289 ATTN: Mr. J. G. Miller Vice President P. O. Box 542 Reading, Pennsylvania 19603 Gentlemen:
Thank you for your letter dated April 26, 1974, which forwarded a report ptersuant to 10 CFR 50.55(e) regarding inspection of reactor internals after hot functional testing.
Your report will be neviewed and evaluated and, should we require additional infonnation concerning this matter, we will contact you.
Your cooperation concerning this matter is appreciated.
Sincerely, Onginal signed by
- 1. c. Davis John G. Davis, Deputy Director for Field Operations bec: PDR Directorate of Regulatory Operations LPDR NSIC TIC R0 FILES DR CENTRAL FILE R0:I JP0'REILLY W/0 ENCL 1485 013 mu R0:FS/EB,
R0,:ES S. C..
R0: D0/F0...
FAD T ha s..
rnbur g JM.__.
.o---
.. 5/2/74 S 4 F. W
...?
.... - -_}
...*3 Forra A EC. 41
- t Rev. 9 9 4 9 A ECM 02 4fl 38o C 43 59 e t ees.s sa a te 7910260 [ D e