ML19262A130
| ML19262A130 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 09/12/1979 |
| From: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | |
| Shared Package | |
| ML19262A124 | List: |
| References | |
| 50-302-79-26, NUDOCS 7910260396 | |
| Download: ML19262A130 (1) | |
Text
.
APPENDIX A NOTICE OF VIOLATION Florida Power Corporation License No. DPR-72 Crystal River 3 Based on the NRC inspection August 13-17, 1979, certain of your activities were apparently not conducted in full compliance with NRC requirements as indicated below. These items have been categorized as described in correspondence to you dated December 31, 1974.
As required by Technical Specification 6.8.1, Written Procedures shall be established, implemented and maintained, specifically covering the activi-ties stated in paragraph (c), " surveillance and test activities of safety related equipment." The Surveillance Procedure SP-113, Power Range Nuclear Instrumentation Calibration, requires Sections 1, 2 and 7 to be completed in order to reset high flux trip setpoints.
Contrary to the above, during the preparation for the three pump operation on August 16, 1979, the technician who performed the above calibration did not, as witnessed by the inspectors, complete the procedure data sheets fer Sections 1 and 7.
This is an infraction.
1?!7.116 7910260 a
!