ML19261E928
| ML19261E928 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 10/29/1973 |
| From: | Spangler M US ATOMIC ENERGY COMMISSION (AEC) |
| To: | Olson K, Seiffert P US ATOMIC ENERGY COMMISSION (AEC) |
| Shared Package | |
| ML19261E929 | List: |
| References | |
| NUDOCS 7910170984 | |
| Download: ML19261E928 (1) | |
Text
'
P DISTRIBUTION:
a cket No. 50-289 D
fD pil f T L-Reading
~"b L-AD/SS o 6 l' J
- l L-CBAB OCT 2 91973 Douglas K. Olson, Office of the General Counsel Perry B. Seiffert, Office of the General Counsel SUFFLDENTAL TESTDOHT FOR TIGEE MII.E ISLAED IM. RAY PLANT BY COST-BEEEFIT AIALYSIS STAFF Enclosed herewith are copias of the follouring statements of supplemental testimenvy prepared by Dr. Darrel Eash and Mr. n==nf a Rathban for the forthcoming hearings on the Three Mila Island hel==r Plant
Contention 4.
Costs of Eastgencies and Evacuation (Rathbun)
Costantion 10(s). Costs of Adataintration mad Esgulation (Eash)
Costantion 10(b). Liability Insurance Costs (Mash)
Centantion 10fe). Water Costs (Mash)
Centestico 10(d). Cast of Contaissent hering (Mash)
Costantion 10(e). Costs of Altarmative Facilities (Mash)
. Contention loff). Capacity Factors (uarkhui)
It is felt that the testimonies en the emergency evsenatica plans, the
-Mr hc costs of water ecastunptica and plant capacity factors have etammr and more definitive cost-benefit analyses than any heretofore prepared and hemos could serve as references for ray future needs to deel with these topics.
Miller E. Spangler, Chief Cost-Benefit Analysis Branch Directorate of Licensing Enciasures:
As stated 1483 231 E. Denton A. Ciambasso J. Gallo
/
V. Eagan
/'/ c. ry u,,
m
.-u omcc > b,...Rathbun.......l;.CBASf.r l
u sunwr >..
...........NSRitO@eU.Peb I
I oart > I
..10/.291.7.3.......
Fon. AEC418 (Rev. 9-53) AICM 0240
.+s-- t o-s i ens-i uws 4
'7 910170 g
'