Forwards IE Insp Repts 50-282/79-08 & 50-306/79-07 on 790212-16 & 0314-16 & Notice of Violation
ML19261D751
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 04/25/1979
From: Heishman R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Wachter L
NORTHERN STATES POWER CO.
Shared Package
ML19261D752 List:
References
NUDOCS 7906260321
Download: ML19261D751 (2)


See also: IR 05000282/1979008

Text

'] hk

I

N

ggb

-g

d

Q

UNIT E D STATES

j

f-

, t

NUCLE AR REGUI.ATORY COMMISSION

fI

,(

c

REGloN til

.

799 ROoSE V E LT RO AD

$

'4

G L E N E LL Y N. IL LINDIS 60137

g

o

e

  • ,..*

APR 2 51979

Docket No. 50-282

Docket No. 50-306

Northern States Power Company

ATTN:

Mr. Leo Wachter

Vice President

Power Production and

System Operation

414 Nicollet Mall

Minneapolis, MN 55401

Gentlemen:

This refers to the inspection conducted by Messrs. L. G. McGregor,

J. D. Smith, B. M. K. Wong and J. F.

Streeter of this office on

February 12-16 and March 14-16, 1979, of activities at the Prairie

Island Nuclear Generating Plant, l' nits 1 and 2, authorized by NRC

Operating Licenses No. DPR-42 and No. DPR-60 and to the discussion

of our findings with Mr. F. P. Tierney at the conclusion of the

inspection.

The e losed copy of our inspection report identifies areas examined

during the inspection. Within these areas, the inspection consisted

of a selective examination of procedures and representative records,

observations, and interviews with personnel.

During this inspection, certain of your activities appeared to be

in noncompliance with NRC requirements, as described in the enclosed

Appendix A.

This notice is sent to you pursuant to the provisions of Section

2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code

of Federal Regulations.

Section 2.201 requires you to submit to

this office within twenty days of your receipt of this notice a

written statement or explanation in reply, including for each

item of noncompliance: (1) corrective action taken and the results

achieved; (2) corrective action to be taken to avoid further non-

compliance; and (3) the date when full compliance will be achieved.

2311

065

790626039\\

i

A

.

Northern States Power

-2-

APR 2 51979

Company

In accordance with Section 2.790 of the NRC's " Rules of Practice,"

Part 2, Title 10, Code of Federal Regulations, a copy of this

letter, the enclosures, and your response to this letter will be

placed in the NRC's Public Document Room, except as follows.

If

the enclosures contain information that you or your contractors

believe to be proprietary, you must apply in writing to this office,

within twenty days of your receipt of this letter, to withhold such

information from public disclosure.

The application must include a

full statement of the reasons for which the information is considered

proprietary, and should be prepared so that proprietary information

identified in the application is contained in an enclosure to the

application.

We will gladly discuss any questions you have concerning this

inspection.

Sincerely,

o

R. F. Heishman, Chief

Reactor Operations and

Nuclear Support Branch

Enclosures:

1.

Appendix A, Notice

of Violation

2.

IE Inspection Reports

No. 50-282/79-08

and No. 50-306/79-07

cc w/encls:

Mr. F. P. Tierney, Jr.,

Plant Manager

Central Files

Reproduction Unit NRC 20b

PDR

Local PDR

2311

066

NSIC

TIC

John W. Fe rman, Ph .D. ,

Nuclear Engineer, MPCA

/

.

Appendix A

NOTICE OF VIOLATION

Northern States Power

Docket No. 50-282

Company

Docket No. 50-306

Based on the inspection conducted on February 12-16 and March 14-16,

1979, it appears that one of your activities was in noncompliance

with SRC requirements as noted below. This item is a deficiency and

applies to Units 1 and 2.

Technical Specifications 4.16.A.1 and 4.16.A.2 became effective

February 14, 1978, and require, respectively, that fire detectors

exterior to primary containment be functionally tested once every

six months and that the detector alarm circuits also be tested

every six months.

Contrary to the above, the initial tests (SPll89) of the fire

detectors and alarm circuits were not conducted until (December 28,

1978) approximately ten and one-half months after the technical

specifications became effective.

2311

067

7 9 0 6 2 6 0 33Jo

.

.

U.S. NUCLEAR REGULATORY COMMISSION

OFFICE OF INSPECTION AND ENFORCEMENT

REGION III

Report No. 50-282/79-08; 50-306/79-07

'%

Docket No. 50-282; 50-306

License No. DPR-42; DPR-60

Licensee:

Northern States Power Company

414 Nicollet Mall

Minneapolis, MN 55401

Facility Name:

Prairie Island Nuclear Generating Plant, Units 1 and 2

Inspection At:

Prairie Island Site, Red Wing, F5

Inspection Conducted:

February 12-16 and rarch 14-16, 1979

<-

,

Inspectors:

L. G. "cGregor (February 12-16, 1975)

/ /' .

'

~/ / } TT

J. D. Smith (March 14-16, 1979)

--

',,m T/

/ ri 19

-

J.

F.

Streeter (February 14-15, 1979)

B. M. K. Wong (February 14-15, 1979)

h /i'

n -

ny<(._>n.T/

c- -

4

,3

- '/ y

[J.

g

F. Streeter, Chief

4f. f c . /$P

Approved By:

Nuclear Support Section 1

Inspection Summary

Inspection on February 12-16 and March 14-16, 1979 (Report No. 50-282/

79-08: 50-306/79-07)

Areas Inspected: Routine, unannounced inspection of calibration and

surveillance of safety related components and equipment and implemen-

tation of ASME Code Section XI and pump and valve test program.

The

inspection involved 93 inspector-hours onsite by four NRC inspectors.

Results: Of the three areas inspected, no Items of Noncompliance were

identified in two areas. One Item of Noncompliance (Deficiency -

delayed conduct of fire system surveillance, Paragraph 5.c) in one area.

.

2311

068

7906260330

.

.

DETAILS

1.

Persons Contacted

+*F.

Tierney, Plant Manager

+E. Watz), Superintendent, Plant Engineer, Radiation Protection

A. Hunsted, Staff Engineer

  • J.

Hoffman, Plant Engineer, Technical

G.

Sundberg, Instrument Engineer

  • R.

01schlager, Instrument and Control Coordinator

+B . Stephens, Mechanical Engineer

D. Walker, Shift Supervisor

R. Hoffey, Shift Supervisor

R. Ryan, Shift Supervisor

The inspectors also talked with and interviewed several members of

the operations, techanical and engineering staffs.

  • Denotes those present at the exit interview on February 16, 1979.

+ Denotes those present at the exit interview on March 16, 1979.

2.

Calibration of Safety Related Components Recuired by Technical

Specifications (Units 1 and 2)

The inspector reviewed plant calibration records, selected logs and

records for the below listed calibration activities.

This review

was performed to determine that the frequency of calibration was

met; the service status of the system was in conformance with the

applicable limiting conditions of operations; the procedures used

to calibrate the components were reviewed and approved as required

by the Technical Specifications; the procedures used contained

acceptable trip settings using applicable technical specification

requirements; the procedures used contained detailed stepwise

instructions; the technical content of the procedures would result

in satisfactory calibration; the qualifications of two individuals

in the I6C group having responsibilities for performing calibra' ions

were adequate.

" Reactor High Flux Intermediate Range Calibration,"

a.

Test 2007 and 1007A

b.

" Reactor High Flux Power Range Calibration,"

Test 2009 and 1009

c.

" Pressurizer Level Control Calibration,"

Test 2001, 2048, 2182, 1048, 1001 and 1182

2311

069

-2-

.

.

d.

" Emergency Core Cooling Temperature Element Calibration

Safety Injection System,"

Test 108 and 2088

" Residual Heat Removal Pump Flow Calibration,"

e.

Test 2020

f.

" Accumulator Boron Concentration Tests,"

Tests 1065 and 2065

g.

" Containment System Emergency Charcoal Filter Pressure Drop

Calibration,"

Tests 1114 and 2114

h.

" Containment Pressure Calibration Sensing Instrumentation,"

Tests 1001, 2001 and 2045

i.

" Containment Temperature Calibration,"

Tests 1038 and 2038

j.

" Station Battery Load Test,"

Test 1098 and 2098

k.

"4 KV Volt and Frequency Calibration,"

Tests 1014 and 1015

1.

" Containment Sump Level Instrument Tests and Calibration,"

Tests 1030 and 2030

"Ref ueling k'ater Storage Tank Level Calibration,"

m.

Test 2023

n.

" Volume Control Tank Level Channels Calibration CVC System,"

Test 2025

" Boric Acid Makeup Flow Channel Calibration,"

o.

Test 2029

p.

" Accumulator Level and Pressure Test and Calibration,"

Test 2031

q.

" Control Rod Drive Exhaust Air Temperature Calibration,"

Test 2043

No items of noncompliance or deviations were identified.

2311

070

- 3-

e

3.

Calibration of Safety Related Components Not Specified by .achnical

Specification (Units 1 and 2)

The inspector reviewed plant calibration records for the below listed

components. This review was performed to determine if the operating

range / accuracy of components were consistent with applicable Technical

Specifications /SAR; the procedurer, used to calibrate the components

were reviewed and approved as required by Technical Specifications;

the procedures used contained acceptance criteria consistent with

Technical Specifications /S AR; the procedures used contained detailed

instructions commensurate with the complexity of the calibration and

that the technical content of the procedures would result in satis-

factory calibration.

a.

Systems

(1) " Analog Reactor Control System,"

Test 1548 and 2548

(2) " Diesel Fire Pump Weekly Test and Calibration,"

Test 1524

(3) " Fire Protection System Test and Calibration,"

Test 1568

(4) " Explosive Detector Calibration,"

Test 1621

(5) " Turbine Bearing Fire Protection Test and Calibration,"

Test 1592 and 2592

(6) " Electrical Penetration Surveillance Test and Calibration,"

Test 2537

b.

Instruments

(1) " Mixed Bed A EFF Conductivity Cell,"

CEC-6 System ODE

(2) " Reactor Coolant Drain Tank N Supply Pressure,"

9

'

IPC 1014 System OWL

(3)

"WST Tank Rad Monitor,"

Inst. 59062 System DRD

2311

071

-4-

,

(4) " Station Air Compressor Receiver Pressure Switch and Valve,"

Inst. 16086 and 31191 System OSA

(5)

"Decon Area Sump Level Switch,"

Inst. 16677 System OWL

(6) " Turbine High Pres' re Cylinder Flange Temperature,"

Inst. 42083-04 System ITB

(7) " Hydrogen Recombiner Product Gas Oxygen Analyzer,"

10 AR-1119 System OWG

20 AR-1119 System OWG Recorder and Alarm

No items of noncompliance or deviations were identified.

4

Surveillance Test Witnessing

The following surveillance testing was witnessed to verify that all

test prerequisites were met and the stepwise procedures were completed

as required:

a.

Test SP 1186 Emergency Diesel Generator Start and Operation,

Unit 1 (Rev. June 16, 1978).

b.

Test SP 1106A Diesel Driven Cooling Water Pump, Unit 1

(Rev. June 16, 1978).

c.

Test SI 1088 Operational Test of Safety Injection Pumps,

Unit 2 (Rev. June 16, 1978).

No items of noncompliance or deviations were identified.

5.

Surveillance of Safety Related Components or Equipment (Units 1

and 2)

a.

Purpose of Review

The inspector reviewed plant surveillance records to determine

if test procedures are approved in accordance with the Tech-

nical Specifications; test procedures include appropriate (1)

prerequisites and preparations, (2) acceptance criteria, and

(3) instructions to ensure tested item is restored to operation

following the test; rechnical content of procedures assures

compliance with the Technical Specifications and Inservice

Inspection Program; tests were performed within the time

2311

072

_s_

frequencies specified in the Technical Specifications and

Inservice Inspection Program; tests were performed by qualified

individuals; test results were reviewed as required by facility

administrative requirements; test results were in conformance

with Technical Specifications and Inservice Inspection Program;

appropriate action was taken for test results not meeting the

acceptance criteria.

b.

Administrative Documents, Personnel Qualifications and Test

Records Reviewed

(1) Test Records

Test Procedure

Date of Tests

SP 1072-45, " Local Leakage Rate Test

3/25/77, 3/19/76

of Penetration 45"

4/29/75 and 4/26/75

SP 1089, " Residual Heat Removal

2/13/79, 1/30/79,

Pumps and Suction Valves from the

1/31/79

Refueling Water Storage Tank,"

Rev. 10

SP 1090, " Containment Spray Pump

2/22/79, 1/25/79

Test" Rev. 14, dtd 11/26/78

12/21/78

SP 1099, " Main Steam Isolation

4/12/78, 3/28/78,

Valves Closure Test," Rev. 2,

12/9/77

7/5/77

SP 1102, " Turbine-driven Auxiliary

1/31/79, 12/27/78,

Feedwater Pump Test," Rev. 8,

11/28/78

8/2/78

SP 1106, "12 Diesel Cooling Water

2/23/79, 2/15/79,

Pump Test," Rev. 4, 6/26/78

2/14/79 and 2/8/79

SP 1151, " Cooling Water System

1/23/79, 10/17/78,

Test," Rev. O, 4/16/77

7/18/77

SP 1155, " Component Cooling System

1/18/79, 12/13/78,

Test," Rev. 5, 10/30/78

11/15/78

SP 1156, " Low Level Gas Decay Tanks

12/5/78, 9/8/78,

to Plant Vent Control Valve Test,"

6/6/78

Rev. 2, 6/5/78

2311

073

-o-

.

,

SP 1157 6 2157, " Post LOCA Hy'drogen

4/10/78, 12/9/78

Control System Valve Operation,"

Rev.

2, 6/5/78

SP 1160, " Chilled Water Crossover

12/19/78, 9/19/78,

Control Valve Test," Rev. 1,

6/22/78, 3/21/78,

6/5/78

12/20,77, 9/20/77,

6/21/77

SP 1161, " Control Room Chilled

2/20/79, 1/23/79,

Water Pump Test," Rev. 3, 6/20/78

12/19/78, 11/21/78,

10/17/78, 9/19/78,

8/22/78, 7/18/78,

6/22/78, S/23/78,

4/18/78, 3/21/78,

2/21/78, 1/17/78

SP 1180, " Diesel Cooling Water

1/26/79, 12/22/78,

System Test," Rev. 3, 12/1/78

11/24/78

SP 1159, " Reactor Vessel Injection

2/27/79, 11/27/78,

Isolat'on Valve Test," Rev. 1,

8/29/78

6/5/78

SP 1002, " Analog Protection

2/16/78

Functional Test," Rev. 5,

8/29/78

SP 1178, "CVCS Check Valve Test"

4/2/78, 12/9/78

SP 1187, " Diesel-driven Fire

1/78 thru 1/79

Pump Battery Inspection,"

Rev. 3, 8/2/78

SP 1096 6 1097, " Station Battery

1/78 thru 1/79

Monthly Test and Station Battery

Quarterly Inspection," Rev. 4,

10/30/78

SP 1053, " Fire Protection System

9/15/78, 10/13/78

Monthly Fire Pump Running Test,"

11/17/78, 12/15/78,

Rev. 6, 10/13/78

1/19/79

SP 1189, " Safety Related Fire

12/28/78

Detector Check," Rev. O, 9/28/78

2311

074

,

-1

-

.

a

SP 1190, " Emergency Diesel Generator

8/78 thru 1/79

011 Storage Tanks Sampling Procedure,"

Rev.

O, 11/15/78

SP 2130, " Containment Vacuum Breakers

12/29/77, 3/28/7F,

Quarterly Test," Rev. 3, 8/2/77

6/27/78, 0/26/78,

12/28/79

SP 2171, " Tech Spec Shock Suppressor

11/14/77, 12/2n/78

Check,"

Rev.

O, 10/17/77

SP 1046, " Full Length Control Rod

12/14/78

Drop Timing," Rev.

4, 6/20/78

(2/

Personnel Qualification Records

The qualification records for two individuals involved in

the tests identified above were reviewed to determine if

the individuals were qualified in accordance with the

Technical Specifications and ANSI N18.1.

(3) Administrative Documents

The fcllowing facility administrative documents were used

during the review:

(a)

Operations Manual Appendix G, Section 6, " Surveil-

lance," dated January 31, 1977.

(b)

" Northern States Power Company, Prairie Island

Nuclear Generating Plant, ASME Code Section XI

Inservice Inspection and Testing Program and

Information Required for NRC Review of Requests

for Relief from ASME Code Section X1 Requirements,"

Rev. 1, dated September 15, 1978.

c.

Findings

(1) Technical Specifications 4.16.A.1 and 4.16.A.2 became

effective February 14, 1978, and require, respectively,

that fire detectors exterior to primary containment be

functionally tested once every six months and that the

detector alarm circuits also be tested every six months.

2311

075

_g_

(

e

Contrary to the above, the initial tests (SP 1189) of

the alarm circuits were not conducted until (December 28,

1978) approximately 10 1/2 months after the technical

specifications became effective.

This is an Item of Non-

compliance (50-282/79-0-01; 50-306/79-0-01) of the

Deficiency level.

(2) The monthly emergency diesel generator fuel oil sample

analysis for viscosity, water, and sediment was not

performed during the period November 21, 1978 through

January 12, 1979, as required by Technical Specification 4.6.A.1.c.

However, the inspector verified that this

was an isolated example.

(3) A few examples were noted where the tester was identified

in the test documentation but the tester's signature was

not documented, where there were delays in forwarding

test results from the group supervisor to the Surveil-

lance Coordinator, where temporary test equipment used

to obtain performance data was not specifically identi-

fied, and where test documentation did not indicate

abnormal conditions were promptly brought to the attention

of the appropriate supervisor.

The licensee instructed

personnel involved in the conduct and review of tests of

the importance of the proper conduct, review, and docu-

mentation of tests.

No other items of importance were noted.

6.

Plant Tour (l' nits 1 and 2)

The inspector conducted a tour of various areas of the plant to

observe operations and activities in progress, general housekeeping

and cleanliness, and equipment caution or lockout tags.

Exceptional

cleanliness was observed throughout areas toured.

No items of noncompliance or deviations were identified.

7.

Exit Interviews

The inspector met with licensee representatives (denoted in Paragraph

1) on February 16, 1979, and at the conclusion of the inspection on

March 16, 1979. The inspectors summarized the purpose, scope, and

findings of the inspection.