ML19261D735

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-269/79-01,50-270/79-01 & 50-287/79-01 on 790131-0201 & Notice of Violation
ML19261D735
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 02/27/1979
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parker W
DUKE POWER CO.
Shared Package
ML19261D729 List:
References
NUDOCS 7906260259
Download: ML19261D735 (2)


See also: IR 05000269/1979001

Text

.-

1

-

.

4

%

(g# 880

UNITED ST.ATES

0g

,

NUCLEAR REGULATORY COMMISSION

,og

e

o

REGION 11

$

101 M ARIETTA STREET. N.W.

5

ATLANTA. GEORGIA 30303

o,s..../

FEB 2 71979

In Reply Refer To:

RII:hTC

50-269/79-1

50-270/79-1

50-287/79-1

Duke Power Company

Attn:

Mr. William O. Parker, Jr.

Vice President, Steam Production

Post Office Box 33189

422 South Church Street

Charlotte, North Carolina 28242

Gentlemen:

This refers to the inspection conducted by Mr. W. T. Cottle of this

office on January 31 through February 1, 1979 of activities authorized

by NRC License Nos. DPR 38, DPR-47 and DPR-55 for the Oconee Nuclear

Station facilities, Units 1, 2 and 3, and to the discussion of our

findings held with Mr. J. E. 9mith at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in

the enclosed inspection report.

Within these areas, the inspection

consisted of selective examinations of procedures and representative

records, interviews with personnel, and observations by the inspector.

During the inspection, it was found that certain activities under your

license appear to be in noncompliance with h7C requirements. This item

and references to pertinent requirements are listed in the Notice of

Violation enclosed herewith as Appendix A.

This notice is sent to you

pursuant to the provisions of Section 2.201 of the NRC's " Rules of

Practice", Part 2, Title 10, Code of Federal Regulations.

Section 2.201

requires you to submit to this office, within 20 days of your receipt of

this notice, a written statement or explanation in reply including:

(1)

corrective steps which have been taken by you, and the results achieved;

(2) corrective steps which will be taken to avoid further noncompliance;

and (3) the date when full compliance will be achieved.

In accordance with Section 2.790 of the NRC's " Rules of Practice,"

Part 2, Title 10, Code of Federal Regulations, a copy of this letter and

the enclosed inspection report will be placed in the NRC's Public Document

Room.

If this report contains any information that you (or your contractor)

believe to be proprietary, it is necessary that you make a written

application within 20 days to this office to withhold such information

2311

018

790ggen}

'

FEB 2 71979

Duke Power Company

-2-

from public disclosure. Any such application must include a full state-

ment of the reasons on the basis of which it is claimed that the informa-

tion is proprietary, and should be prepared so that proprietary information

identified in the application is contained in a separate part of the

document.

If we do not hear frcm you in this regard within the specified

period, the report will be placed in the Public Document Room.

Should you have any questions concerning this letter, we will be glad to

discuss them with you.

Sincerely,

E.c.&

R. C. Lewis, Acting Chief

Reactor Operations and

Nuclear Support Branch

Enclosures:

1.

Appendix A, Notice of Violation

2.

Inspection Report Nos. 50-269/79-1

50-270/79-1 and 50-287/79-1

cc w/ enclosures:

Mr. J. E. Smith, Station Manager

Oconee Nuclear Plant

Post Office Box 1175

Seneca, South Carolina 29678

2311

019