Forwards IE Insp Repts 50-424/79-02 & 50-425/79-02 on 790213-15 & Notice of Violation
ML19261D042
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 03/13/1979
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: John Miller
GEORGIA POWER CO.
Shared Package
ML19261D034 List:
References
NUDOCS 7904240102
Download: ML19261D042 (2)


See also: IR 05000424/1979002

Text

-

UNITED STATES

  1. g8 Hougo,

NUCLEAR REGULATORY COMMISSION

4

,

8

- p

o

REGloN il

,$

101 M ARIETT A STRE ET, N.W.

7

ATLANTA, GEORGI A 30303

o

%...../

MAR 131979

In Reply Refer To:

RII:LM

50-424/79-2

50-425/79-2

Georgia Power Cortpany

ATTN:

Mr. J. H. Miller, Jr.

Executive Vice President

270 Peachtree Street, N. W.

Atlanta, Georgia 30303

Gentlemen:

This refers to the inspection conducted by Mr. L. Modenos of this office on

February 13-15, 1979, of activities authorized by NRC Construction Permit

Nos. CPPR-108 and CPPR-109 for the Vogtle Nuclear Plant facility, and to the

discussion of our findings held with Mr. K. M. Gillespie at the conclusion

of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews

with personnel, and observations by the inspector.

During the inspection, it was found that certain activities under your

license appear to be in noncompliance with hPC requirements.

This item and

references to pertinent requirements are listed in the Notice of Violation

enclosed herewith ar. Appendix A.

This notice is sent to you pursuant to the

provisions of Section 2.201 of the NRC's " Rules of Practice," Part 2, Title

10, Code of Federal Regulations.

Section 2.201 requires you to submit to

this office, within 20 days of your receipt of this notice, a written

statement or explanation in reply including:

(1) corrective steps which

have been taken by you, and the results achieved; (2) corrective steps which

will be taken to avoid further noncompliance; and (3) the date when full

compliance will be achieved.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20

days to this office to withhold such information from public disclosure.

Any such application must include a full statement of the reasons on the

790424 010 7

.

.

MAR 131979

.

Georgia Power Company

-2-

basis of which it is claimed that the information is proprietary, and should

be prepared so that proprietary information identified in the application is

contained in a separate part of the document.

If we do not hear from you in

this regard within the specified period, the report will be placed in the

Public Document Room.

Should you have any questions concerning this letter, we will be glad to

discuss them with you.

Sincerely,

slb )1 (

l0

C. E. Murphy, Chief

Reactor Construction and Engineering

Support Branch

Enclosure:

1.

Appendix A, Notice of Violation

2.

Inspection Report Nos. 50-424/79-2

and 50-425/79-2

cc w/ encl:

Mr. K. M. Gillespie

Construction Project Manager

Vogtle Nuclear Plant

P. O. Box 282

Waynesboro, Georgia 30830

Mr. E. D. Groover

QA Site Supervisor

Vogtle Nuclear Plant

P. O. Box 282

Waynesboro, Goergia 30830