ML19261D042
| ML19261D042 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 03/13/1979 |
| From: | Murphy C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | John Miller GEORGIA POWER CO. |
| Shared Package | |
| ML19261D034 | List: |
| References | |
| NUDOCS 7904240102 | |
| Download: ML19261D042 (2) | |
See also: IR 05000424/1979002
Text
-
UNITED STATES
- g8 Hougo,
NUCLEAR REGULATORY COMMISSION
4
,
8
- p
o
REGloN il
,$
101 M ARIETT A STRE ET, N.W.
7
ATLANTA, GEORGI A 30303
o
%...../
MAR 131979
In Reply Refer To:
RII:LM
50-424/79-2
50-425/79-2
Georgia Power Cortpany
ATTN:
Mr. J. H. Miller, Jr.
Executive Vice President
270 Peachtree Street, N. W.
Atlanta, Georgia 30303
Gentlemen:
This refers to the inspection conducted by Mr. L. Modenos of this office on
February 13-15, 1979, of activities authorized by NRC Construction Permit
Nos. CPPR-108 and CPPR-109 for the Vogtle Nuclear Plant facility, and to the
discussion of our findings held with Mr. K. M. Gillespie at the conclusion
of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews
with personnel, and observations by the inspector.
During the inspection, it was found that certain activities under your
license appear to be in noncompliance with hPC requirements.
This item and
references to pertinent requirements are listed in the Notice of Violation
enclosed herewith ar. Appendix A.
This notice is sent to you pursuant to the
provisions of Section 2.201 of the NRC's " Rules of Practice," Part 2, Title
10, Code of Federal Regulations.
Section 2.201 requires you to submit to
this office, within 20 days of your receipt of this notice, a written
statement or explanation in reply including:
(1) corrective steps which
have been taken by you, and the results achieved; (2) corrective steps which
will be taken to avoid further noncompliance; and (3) the date when full
compliance will be achieved.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room.
If this
report contains any information that you (or your contractor) believe to be
proprietary, it is necessary that you make a written application within 20
days to this office to withhold such information from public disclosure.
Any such application must include a full statement of the reasons on the
790424 010 7
.
.
MAR 131979
.
Georgia Power Company
-2-
basis of which it is claimed that the information is proprietary, and should
be prepared so that proprietary information identified in the application is
contained in a separate part of the document.
If we do not hear from you in
this regard within the specified period, the report will be placed in the
Public Document Room.
Should you have any questions concerning this letter, we will be glad to
discuss them with you.
Sincerely,
slb )1 (
l0
C. E. Murphy, Chief
Reactor Construction and Engineering
Support Branch
Enclosure:
1.
Appendix A, Notice of Violation
2.
Inspection Report Nos. 50-424/79-2
and 50-425/79-2
cc w/ encl:
Mr. K. M. Gillespie
Construction Project Manager
Vogtle Nuclear Plant
P. O. Box 282
Waynesboro, Georgia 30830
Mr. E. D. Groover
QA Site Supervisor
Vogtle Nuclear Plant
P. O. Box 282
Waynesboro, Goergia 30830