Forwards SER of Interim Assessments of MSIV Actuations in Mark I Containment Plants. Approves Continued Operation of Facilities,Subj to Corrective Actions Noted in Ser,Pending Final Resolution
ML19261C477
Person / Time
Site: Dresden, Nine Mile Point, Oyster Creek
Issue date: 02/27/1979
From: Grimes B, Vollmer R
Office of Nuclear Reactor Regulation
To: Finfrock I, Trowbridge G, Wallace E
GENERAL PUBLIC UTILITIES CORP., JERSEY CENTRAL POWER & LIGHT CO., SHAW, PITTMAN, POTTS & TROWBRIDGE
Shared Package
ML19261C478 List:
References
NUDOCS 7903230001
Download: ML19261C477 (1)


Text

.

  1. "t' UNITED STATES

[.,

.s..

NUCLEAR REGULATORY COMMISSION

-'c

j]

3

.'fj 1, V(J57 WASHINGTON, D. C. 20555 i

f February 27, 1979 All BWR Licensees (Except Humboldt Bay, Big Rock Point, Dresden 1 and La Crosse)

RE: STAFF EVALUATION OF INTERIM MULTIPLE-CONSECUTIVE SAFETY-RELIEF VALVE ACTUATIONS Gentlemen:

In letters dated March 20, 1978, the staff requested that all licensees of BWR facilities with the Mark I containment design perform an interim assessment of the consequences of a multiple-consecutive safety-relief valve discharge event. The enclosed staff evaluation concludes our review of the interim assessments. Your submittals and actions for this activity are identified in the enclosure.

Based on our review, we conclude that continued operation of the Mark I BWR facilities is acceptable, subject to the corrective actions identified in the evaluation, until this issue is ultimately resolved as part of the Mark I Long-Term Program.

Sincerely, C

')

k%n m_

-B. K. Grimes, Assistant Director for Engineering and Projects Division of Operating Reactor Ql$w R.- H. 'Volliner, Assistant Director for Systems and Projects Division of Operating Reactors Encinsure:

Safety Evaluation Report cc: Service List 790323ccot

/