'g#%,
t
UNITED STATES
.
-' t
NUCLEAR REGULATORY COMMisslON
., g
f [fg.%
[
,j
-
REGION I
gi
pa
e
631 P A R . A V E N U E
.g
KING OF PRUSSIA PENNSYLVANI A 19406
.....
Docket Nos. 50-317
DEC 12 073
50-318
Baltimore Gas and Electric Company
ATTN: Mr. A. E. Lundvall, Jr.
Vice President, Supply
P. O. Box 1475
Baltimore, Maryland 21203
Gentlemen:
Subject:
Inspection 50-317/78-36 and 50-318/78-21
This refers to the inspection conducted by Mr. J. R. White of this
office on September 13-15 and October 10-13, 1978, at Calvert Cliffs
Nuclear Power Station, of activities authorized by NRC License Nos. DPR-
53 and DPR-69 and to the discussions of our findings held by Mr. Whf te
with Mr. R. Douglass of your staff at the conclusion of the inspection.
Areas examined during this inspection are described in the Office of
Inspection and Enforcement Inspection Report which is enclosed with this
letter.
Within these areas, the inspection consisted of selective
examinations of procedures and representative records, interviews with
personnel, measurements made by the inspector, and observations by the
inspector.
Based on the results of this inspection, it appears that certain of your
activities were not conducted in full compliance with NRC require.nents
as set forth in the Notice of Violation, enclosed herewith as Appendix
A.
These items of noncompliance have been categorized into the levels
as described in our correspondence to you dated December 31, 1974.
This
notice is sent to you pursuant to the provisions of Section 2.201 of the
NRC's " Rules of Practice", Part 2, Title 10, Code of Federal Regulations.
Section 2.201 requires you to submit to this office, within twenty (20)
days of your receipt of this notice, a written statement or explanation
in reply including:
(1) corrective steps which have been taken by you
and the results achieved; (2) corrective steps which will be taken to
avoid further items of noncompliance; and (3) the date when full compli-
ance will be achieved.
7 9 0 2 0 80@4 og
.
.
Baltimore Gas and Electric Company
2
E 12 Da
Items number B and D, shown in the Notice of Violation enclosed with
this letter, are recurrent in that items of a similar nature were identified
to you in Notices of Violation dated August 8,1977 and September 13,
1978.
In your response please give these matters your particular attention.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part
2, Title 10, Code of Federal Regulations, a copy of this letter and ti.e
enclosures will be placed in the NRC's Public Document Room.
If this
report contains any information that you (or your contractor) believe to
be proprietary, it is necessary that you make a written application
within 20 days to this office to withhold such information from public
disclosure.
Any such application must be accompanied by an affidavit
executed by the owner of the information, which identifies the document
or part sought to be withheld, and which contains a statement of reasons
which addresses with specificity the items which will be considered by
the Commission as listed in subparagraph (b)(4) of Section 2.790.
The
information sought to be withheld shall be incorporated as far as possible
into a separate part of the affidavit.
If we do not hear from you in
this regard within the specified period, the report will be placed in
the Public Document Room.
Should you have any questions concerning this inspection, we will be
pleased to discuss the:n with you.
Sincerely,
/'
a
Geo ge H. Smith, Chief
Fu
Facility and Materials Safety
B,anch
Enclosures:
1.
Appendix A, Notice of Violation
2.
Office of Inspection and Enforcement Inspection
Report Numbers 50-317/78-36; 50-318/78-21
cc w/encis:
R. M. Douglass, Manager, Quality Assurance
L. B. Russell, Chief Engineer
W. Gibson, General Supervisor, Operational QA
R. C. L. Olson, Senior Engineer