Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in IE Insp Repts 50-317/78-36 & 50-318/78-21
ML19261A735
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 01/23/1979
From: Galen Smith
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Lundvall A
BALTIMORE GAS & ELECTRIC CO.
Shared Package
ML19261A736 List:
References
NUDOCS 7902080068
Download: ML19261A735 (2)


See also: IR 05000317/1978036

Text

p

..

.

k

UNITED STATES

c,

gg

  • g

NUCLEAR REGULATORY COMMISSION

0

REGION I

<E'fp

'

$31 PARK AVdNUE

$ ,y /

xino or paussia. rennsvevania is4os

JAN 2 31973

Docket Nos. 50-317

50-318

Baltimore Gas and Electric Company

ATTN: Mr. A. E. Lundvall, Jr.

Vice President, Supply

P. O. Box 1475

Baltimore, Maryland 21203

Gentlemen:

Subject:

Combined Inspection 50-317/78-36; 50-318/78-21

This refers to your letter dated December 29, 1978, in response to our

letter dated December 12, 1978.

Thank you for informing us of the corrective and preventive actions

documented in your letter. These actions will be examined during a

subsequent inspection of your licensed program.

In regard to your comments concerning Item 2 of the report, we acknow-

ledge that the Rad-Chem Foreman did indicate to our inspector that the

company's review of the qualifications of the contractor persor nel had

not been completed.

The observations by our inspector, as stated in the

report, were not intendeu to infer that unqualified personnel may have

been inadvertently placed in responsible positions.

As you will note,

our followup 'n this area indicated that you were in compliance with the

Technical Specification at the time of the outage.

If you have further

questions in this area, we will be pleased to discuss them with you.

Your cooperation with us is appreciated.

Sincerely,

J

-

M

e

.

Ge ge

. Smith, Chief

Fu 1 Facility and Materials

Safety Branch

7902080Clo8

.

.

Baltimore Gas and Electric

2

Company

cc:

R. M. Douglass, Manager, Quality Assurance

L. B. Russell, Chief Engineer

W. Gibson, General Supervisor, Operational QA

R. C. L. Olson, Senior Engineer

.