Text
l#
,#e,a e c<,'4'o UNITED STATES S $, e r [,j NUCLEAR REGULATORY COMMIESIGN M '/
E REGION IV
,. h bi - [
o, P
611 RYAN PLAZA oRIVE, SU:TE 1000
,e*
ARLINGTON, TEX AS 76012
....+
January 31, 1980 In Reply Refer To:
RIV Docket No.
50-382/IE Circular No. 79-25, Supplement A Louisiana Power and Light Co.
ATTN:
Mr. D. L. Aswell Vice President of Power Production 142 Delaronde Street New Orleans, Louisiana 70174 Gentlemen:
The enclosed IE Circular No. 79-25, Supplement A, is forwarded to you for information. No written response to this Circular is required.
If you have any questions related to the subject, please contact this office.
Sincerely, I
^D mf
/
Lt k/&' s/
Karl V. Seyftit Director f
Enclosures:
1.
Draft IE Circular No. 79-25 Supplement A 2.
List of IE Circulars Recently Issued 8 0 021 go gc y
SSINS No.:
6830 Accession No.:
UNITED STATES 7912190658 NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D.C.
20555 IE Circular No. 79-25 Supplement A Date: January 31, 1980 Page 1 of 1 SHOCK ARRESTOR STRUT ASSEMBLY INTERFERENCE On December 20, 1979, licensees and holders of construction permits for nuclear power reactors were advised by IE Circular No. 79-25 of a potential problem with Bergen-Paterson part 2540 Strut Assembly used in combination with Pacific Scientific Company mechanical shock arrestors sizes 15K, 50K and 120K.
Bergen-Paterson has conducted a detailed review of their records and identified the following nuclear power plants as being affected by the above problem:
Shoreham #1 Three Mile Island #2 Shearon Harris #1, 2, 3, & 4 Watts Bar #1 Virgil C. Summer #1 Waterford #3 Limmetick #1 & 2 During the course of this investigation Bergen-Paterson identified an additional problem with the 2540-120 Shock Arrestor Strut Assembly.
The assembly may not be acceptable for applications up to the published load of 120,000 lbs.
Preliminary load testing has indierted that the maximum accept-able load may be only 112,000 lbs.
All nuclear power reactor licensees and holders of construction permits are advised to review their systems for any Bergen Paterson part 2540-120 Shock Arrestor Strut Assembly. Application of these assemblies should be analyzed, existing calculations reviewed, and if necessary, recalculated to determine whetb-r loads exceed 112,000 lbs.
Strut Assemblies for applications in excess of 112,000 lbs should be replaced by larger units or other acceptable resolution should be made.
IE Circular No. 79-25 Supplement A January 31, 1980 RECENTLY ISSUED IE CIRCULARS Circular Subject Date Issued To No.
Issued 79-20 Failure Of GTE Sylvania 9/24/79 All Power Reactor Relay, Type PM Bulletin Licensees with a 7305, Catalog SU12-11-AC Construction Permit (CP)
With A 120V AC Coil and/or Operating Licensee (OL) 79-21 Prevention of Unplanned 10/16/79 All holders of Power Releases of Radioactivity Reactor Operating Licenses (OLs) or Construction Permits (cps) 79-22 Stroke Times for Power 11/16/79 All Power Reactor Oper-Operated Relief Valves ating Facilities and all Utilities having a Construction Permit (CP) 79-23 Motor Starters and 11/26/79 All Power Reactor Oper-Centactors Failed to ating Facilities and Holders Operate of Reactor Construction Permits (cps) 79-24 Proper Installation and 11/26/79 All Holders of a Calibration of Core Spray Power Reactor Operating Pipe Break Detection License (OL) or Equipment on BWRs.
Construction Permits (cps) 79-25 Shock Arrestor Strut 12/20/79 All licensees and Assembly Interference holders of power reactor construction Permit (CP) 80-01 Service Advice for GE 1/17/80 All licensees of nuclear Induction Disc Relays power reactor operating facilities and holders of nuclear power reactor Construction Permits (cps)
Enclosure
.