Forwards IE Circular 79-25,Suppl a, Shock Arrestor Strut Assembly Interference. No Written Response Required
ML19260E214
Person / Time
Site: Waterford Entergy icon.png
Issue date: 01/31/1980
From: Seyfrit K
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Aswell D
LOUISIANA POWER & LIGHT CO.
References
NUDOCS 8002140101
Download: ML19260E214 (1)


Text

l#

,#e,a e c<,'4'o UNITED STATES S $, e r [,j NUCLEAR REGULATORY COMMIESIGN M '/

E REGION IV

,. h bi - [

o, P

611 RYAN PLAZA oRIVE, SU:TE 1000

,e*

ARLINGTON, TEX AS 76012

....+

January 31, 1980 In Reply Refer To:

RIV Docket No.

50-382/IE Circular No. 79-25, Supplement A Louisiana Power and Light Co.

ATTN:

Mr. D. L. Aswell Vice President of Power Production 142 Delaronde Street New Orleans, Louisiana 70174 Gentlemen:

The enclosed IE Circular No. 79-25, Supplement A, is forwarded to you for information. No written response to this Circular is required.

If you have any questions related to the subject, please contact this office.

Sincerely, I

^D mf

/

Lt k/&' s/

Karl V. Seyftit Director f

Enclosures:

1.

Draft IE Circular No. 79-25 Supplement A 2.

List of IE Circulars Recently Issued 8 0 021 go gc y

SSINS No.:

6830 Accession No.:

UNITED STATES 7912190658 NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D.C.

20555 IE Circular No. 79-25 Supplement A Date: January 31, 1980 Page 1 of 1 SHOCK ARRESTOR STRUT ASSEMBLY INTERFERENCE On December 20, 1979, licensees and holders of construction permits for nuclear power reactors were advised by IE Circular No. 79-25 of a potential problem with Bergen-Paterson part 2540 Strut Assembly used in combination with Pacific Scientific Company mechanical shock arrestors sizes 15K, 50K and 120K.

Bergen-Paterson has conducted a detailed review of their records and identified the following nuclear power plants as being affected by the above problem:

Shoreham #1 Three Mile Island #2 Shearon Harris #1, 2, 3, & 4 Watts Bar #1 Virgil C. Summer #1 Waterford #3 Limmetick #1 & 2 During the course of this investigation Bergen-Paterson identified an additional problem with the 2540-120 Shock Arrestor Strut Assembly.

The assembly may not be acceptable for applications up to the published load of 120,000 lbs.

Preliminary load testing has indierted that the maximum accept-able load may be only 112,000 lbs.

All nuclear power reactor licensees and holders of construction permits are advised to review their systems for any Bergen Paterson part 2540-120 Shock Arrestor Strut Assembly. Application of these assemblies should be analyzed, existing calculations reviewed, and if necessary, recalculated to determine whetb-r loads exceed 112,000 lbs.

Strut Assemblies for applications in excess of 112,000 lbs should be replaced by larger units or other acceptable resolution should be made.

IE Circular No. 79-25 Supplement A January 31, 1980 RECENTLY ISSUED IE CIRCULARS Circular Subject Date Issued To No.

Issued 79-20 Failure Of GTE Sylvania 9/24/79 All Power Reactor Relay, Type PM Bulletin Licensees with a 7305, Catalog SU12-11-AC Construction Permit (CP)

With A 120V AC Coil and/or Operating Licensee (OL) 79-21 Prevention of Unplanned 10/16/79 All holders of Power Releases of Radioactivity Reactor Operating Licenses (OLs) or Construction Permits (cps) 79-22 Stroke Times for Power 11/16/79 All Power Reactor Oper-Operated Relief Valves ating Facilities and all Utilities having a Construction Permit (CP) 79-23 Motor Starters and 11/26/79 All Power Reactor Oper-Centactors Failed to ating Facilities and Holders Operate of Reactor Construction Permits (cps) 79-24 Proper Installation and 11/26/79 All Holders of a Calibration of Core Spray Power Reactor Operating Pipe Break Detection License (OL) or Equipment on BWRs.

Construction Permits (cps) 79-25 Shock Arrestor Strut 12/20/79 All licensees and Assembly Interference holders of power reactor construction Permit (CP) 80-01 Service Advice for GE 1/17/80 All licensees of nuclear Induction Disc Relays power reactor operating facilities and holders of nuclear power reactor Construction Permits (cps)

Enclosure

.