ML19260E048
| ML19260E048 | |
| Person / Time | |
|---|---|
| Site: | Surry |
| Issue date: | 12/26/1979 |
| From: | Lainas G Office of Nuclear Reactor Regulation |
| To: | Schwencer A Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML19260E049 | List: |
| References | |
| NUDOCS 8002130203 | |
| Download: ML19260E048 (1) | |
Text
-
l
- p ' n %,'%
UNITED STATES
[ *)$ r.
j NUCLEAR REGULATORY COMMISSION
? @1 ^$..',',.
- l E
WASHINGTON C. C. 20555
/
A. Schwencer, Chief Operating Reactors Branch #1 Divisicn of C;erating Reactors FRCM:
G. Lainas Chief Plant Syste s Branen Division of C;erating Reactors
SUBJECT:
SURRY UNITS 1 & 2: EVALUATICN OF THE ELECTRICAL, INSTRUME.1TATICN AND CCNTECL (EI&C) 2SPECTS OF BE CVERPRESSURE MITIG/. TING SYSTEM (TACS 5711/S343)
In ac:ordance with your recuest :er TACS 5711 and 3343 enclosed is ne Plant Systr.ms 3rr cn Safety Evaluation Recort ".rtaining to the Surry Units 1 snd ?, Overanssure Mitigat ng System.
We 'ind One d
- ro;csed design ac
- ectable. Accitionally,
- ne licensee's ;:roccsec Tecnnical Scecificatiens changes nave been subsequently reviewed and are in agreement.vith the rec : rended changes described in Section 2.5 cf :ne enclosed consultant's re:crt.
s G. Lainas, Chief Plant Systems 3rsnch Division of C:erating Reac ces Ocntact:
P. Shemansxi, X27394 Enclosure :
Safety Evaluation Re: ort Cc w/2nC10sure:
- 3. EiSennut R. Tedesco R. Vollmer W. Ga:m:ill P. Check G. Lanik V. 2 nciera 3
D. Nei;nbors G. Lainas D. TCndi P. Shemanski PS3 Sec:icn A
[
800elao 2_o 3
,