ML19260E048

From kanterella
Jump to navigation Jump to search
Forwards Safety Evaluation of Electrical,Instrumentation & Control Aspects of Overpressure Mitigating Sys & Eg&G Rept, Technical Evaluation of Electrical,Instrumentation & Control Aspects of Overpressure Mitigating Sys
ML19260E048
Person / Time
Site: Surry  Dominion icon.png
Issue date: 12/26/1979
From: Lainas G
Office of Nuclear Reactor Regulation
To: Schwencer A
Office of Nuclear Reactor Regulation
Shared Package
ML19260E049 List:
References
NUDOCS 8002130203
Download: ML19260E048 (1)


Text

-

l

  1. p ' n %,'%

UNITED STATES

[ *)$ r.

j NUCLEAR REGULATORY COMMISSION

? @1 ^$..',',.

  • l E

WASHINGTON C. C. 20555

/

DEC 2 6 ISM ME.TRANCCM FOR:

A. Schwencer, Chief Operating Reactors Branch #1 Divisicn of C;erating Reactors FRCM:

G. Lainas Chief Plant Syste s Branen Division of C;erating Reactors

SUBJECT:

SURRY UNITS 1 & 2: EVALUATICN OF THE ELECTRICAL, INSTRUME.1TATICN AND CCNTECL (EI&C) 2SPECTS OF BE CVERPRESSURE MITIG/. TING SYSTEM (TACS 5711/S343)

In ac:ordance with your recuest :er TACS 5711 and 3343 enclosed is ne Plant Systr.ms 3rr cn Safety Evaluation Recort ".rtaining to the Surry Units 1 snd ?, Overanssure Mitigat ng System.

We 'ind One d

ro;csed design ac
ectable. Accitionally,
ne licensee's ;:roccsec Tecnnical Scecificatiens changes nave been subsequently reviewed and are in agreement.vith the rec : rended changes described in Section 2.5 cf :ne enclosed consultant's re:crt.

s G. Lainas, Chief Plant Systems 3rsnch Division of C:erating Reac ces Ocntact:

P. Shemansxi, X27394 Enclosure :

Safety Evaluation Re: ort Cc w/2nC10sure:

3. EiSennut R. Tedesco R. Vollmer W. Ga:m:ill P. Check G. Lanik V. 2 nciera 3

D. Nei;nbors G. Lainas D. TCndi P. Shemanski PS3 Sec:icn A

[

800elao 2_o 3

,