APPENDIX B Washington Public Power Supply System P. O. Box 968 Richland, Washington 99352 Docket flo. 50-460 Construction Permit flo. CPPR-134 f10TICE OF DEVIATION Based on the results of an ?!RC inspection conducted during the period of OctoLer 1-31, 1979, it appears that one of your activities was not conducted in conformance with your comitments to the Commission as indicated below:
a.
Cont rary to ACI-318-71, part 6.4.1 (aoplicable code referenced in DSAR Section 3.8.4), standing water was not reiroved from the horizontal con-struction joint nor was neat cement grout applied to the vertical dr +ha linit 4 construction joint during the placement of concrctc spray pond southwest corner wall during placement number S-164, co6-crete order nunber 217A on October 31, 1979.
This is a deviation.
1939 097~