ML19260D418
| ML19260D418 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 12/14/1979 |
| From: | Sutherland J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | John Miller GEORGIA POWER CO. |
| Shared Package | |
| ML19260D408 | List: |
| References | |
| NUDOCS 8002110018 | |
| Download: ML19260D418 (2) | |
See also: IR 05000321/1979030
Text
.
,
f
a prog'o
UNITED STATES
"
NUCLEAR REGULATORY COMMISSION
3,
,
t c
REGION 11
g '
!
8
101 MARIETTA ST., N.W., SUITE 3100
.
o, * 'V
ATLANTA, GEORGIA 30303
In Reply Refer To:
DEC ] 41974
RII:TCH
-
50-321/79-30
50-366/79-34
Georgia Power Company
ATTN:
J. H. Miller, Jr.
Executive Vice President
270 Peachtree Street
Atlanta, GA 30303
Gentlemen:
This refers to the inspection conducted by T. C. MacArthur of this office on
October 16-19 and 23, 1979, of activities authorized by NRC Operating License
No. DPR-57 and License No. NPF-5 for the Edwin I. Hatch facility, and to the
discussion of our findings held with M. Manry at the conclusion of the inspec-
tion.
Areas examined during this inspection included Radiological Environmental
Monitoring Program including: management controls, quality controls of
analytical measurements, inspection of environmental monitoring stations and
sample collection, review of environmental monitoring data, review of radio-
logical environmental procedures and their implementation. Within these areas,
the inspection consisted of selective examinations of procedures and representa-
tive records, interviews with personnel, and obs 'rvations by the inspector.
During the inspection, it was found that certain activities under your license
appear to be in noncompliance with NRC requirements. This item and references
to pertinent requirements are listed in the Notice of Violation enclosed here-
with as Appendix A.
This notice is sent to you pursuant to the provisions of
Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal
Regulations.
Section 2.201 requires you to submit to this office, within 20
days of your receipt of this notice, a written statement or explanation in reply
including:
(1) corrective steps whict, have been taken by you and the results
l
achieved; (2) corrective steps which 5,ill be taken to avoid further noncompliance;
and (3) the date when full compliance will be achieved.
In accordance with Section 2.790 of the NRC's " Rules of Practice " Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's,Public Document Room.
If this
report contains any information that you (or your contractor) believe to be
proprietary, it is necessary that you make a written application within 20 days
to this office to withhold such information from public disclosure. Any such
application must include a full statement of the reasons on the basis of which
it is claimed that the information is proprietary, and should be prepared so
that proprietary information identified in the' application is contained in a
separate part of the document.
If we do not hear from you in this regard within
the specified period, the report will be placed in the Public Document Room.
1939 027
3oo211o o Qr
.
.
.
DEC 141979
Georgia Power Company
-2-
Should you have any questions concerning this letter, we will be glad to
discuss them with you.
Sincerely,
/,
t
e 4'Y< $.-
J. T. Sutherland, Chief
Fuel Facility and Materials
Safety Branch
Enclosures:
1.
Appendix A, Notice of Violation
2.
Iuspection Report Nos. 50-321/79-30
and 50-366/79-34
cc w/ enc 1:
M. Manry, Plant Manager
P. O. Box 442
Baxley, GA 31513
C. E. Belflower
Sita QA Supervisor
P. O. P.x 442
Baxley, GA 31513
W. A. Widner, General Manager
Nuclear Generation
Georgia Power Company
Post Office Box 4545
Atlanta, Georgia 30303
.