Forwards IE Insp Repts 50-321/79-30 & 50-366/79-34 on 791016-19 & 23 & Notice of Violation
ML19260D418
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 12/14/1979
From: Sutherland J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: John Miller
GEORGIA POWER CO.
Shared Package
ML19260D408 List:
References
NUDOCS 8002110018
Download: ML19260D418 (2)


See also: IR 05000321/1979030

Text

.

,

f

a prog'o

UNITED STATES

"

NUCLEAR REGULATORY COMMISSION

3,

,

t c

REGION 11

g '

!

8

101 MARIETTA ST., N.W., SUITE 3100

.

o, * 'V

ATLANTA, GEORGIA 30303

In Reply Refer To:

DEC ] 41974

RII:TCH

-

50-321/79-30

50-366/79-34

Georgia Power Company

ATTN:

J. H. Miller, Jr.

Executive Vice President

270 Peachtree Street

Atlanta, GA 30303

Gentlemen:

This refers to the inspection conducted by T. C. MacArthur of this office on

October 16-19 and 23, 1979, of activities authorized by NRC Operating License

No. DPR-57 and License No. NPF-5 for the Edwin I. Hatch facility, and to the

discussion of our findings held with M. Manry at the conclusion of the inspec-

tion.

Areas examined during this inspection included Radiological Environmental

Monitoring Program including: management controls, quality controls of

analytical measurements, inspection of environmental monitoring stations and

sample collection, review of environmental monitoring data, review of radio-

logical environmental procedures and their implementation. Within these areas,

the inspection consisted of selective examinations of procedures and representa-

tive records, interviews with personnel, and obs 'rvations by the inspector.

During the inspection, it was found that certain activities under your license

appear to be in noncompliance with NRC requirements. This item and references

to pertinent requirements are listed in the Notice of Violation enclosed here-

with as Appendix A.

This notice is sent to you pursuant to the provisions of

Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal

Regulations.

Section 2.201 requires you to submit to this office, within 20

days of your receipt of this notice, a written statement or explanation in reply

including:

(1) corrective steps whict, have been taken by you and the results

l

achieved; (2) corrective steps which 5,ill be taken to avoid further noncompliance;

and (3) the date when full compliance will be achieved.

In accordance with Section 2.790 of the NRC's " Rules of Practice " Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's,Public Document Room.

If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20 days

to this office to withhold such information from public disclosure. Any such

application must include a full statement of the reasons on the basis of which

it is claimed that the information is proprietary, and should be prepared so

that proprietary information identified in the' application is contained in a

separate part of the document.

If we do not hear from you in this regard within

the specified period, the report will be placed in the Public Document Room.

1939 027

3oo211o o Qr

.

.

.

DEC 141979

Georgia Power Company

-2-

Should you have any questions concerning this letter, we will be glad to

discuss them with you.

Sincerely,

/,

t

e 4'Y< $.-

J. T. Sutherland, Chief

Fuel Facility and Materials

Safety Branch

Enclosures:

1.

Appendix A, Notice of Violation

2.

Iuspection Report Nos. 50-321/79-30

and 50-366/79-34

cc w/ enc 1:

M. Manry, Plant Manager

P. O. Box 442

Baxley, GA 31513

C. E. Belflower

Sita QA Supervisor

P. O. P.x 442

Baxley, GA 31513

W. A. Widner, General Manager

Nuclear Generation

Georgia Power Company

Post Office Box 4545

Atlanta, Georgia 30303

.