ML19260C980
| ML19260C980 | |
| Person / Time | |
|---|---|
| Site: | McGuire, Mcguire |
| Issue date: | 12/05/1979 |
| From: | Murphy C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Parker W DUKE POWER CO. |
| Shared Package | |
| ML19260C974 | List: |
| References | |
| NUDOCS 8002070210 | |
| Download: ML19260C980 (2) | |
See also: IR 05000369/1979037
Text
.
.
'o,
UNITED STATES
!
'n
NUCLEAR REGULATORY COMMISSION
$
E
REGION 11
9
o,
'[
101 MARIETTA ST
N.W.. SUITE 310o
- [
ATLANTA, GECRGIA 30303
Dcc - 51973
In Reply Refer To:
RII:RJH
50-369/79-37
50-370/79-22
e
Duke Power Company
ATTN:
W. O. Parker, Jr.
Vice President, Steam Production
P. O. Box 2178
Charlotte, NC 28242
Gentlemen:
This refers to the inspection conducted by R. J. Hardwick of this office on
October 15-18, 1979, of activities authorized by NRC Construction Permit Nos.
CPPR-83 and CPPR-84 for the McGuire Nuclear Station fa;ility, and to the discus-
sion of our findings held with J. C. Rogers at the conclusion of the inspection.
.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
One new unresolved item resulted from tnis inspection and is discussed in the
enclosed report. This item will be examined during subsequent inspections.
During the inspection, it was found that ertain activities under your license
appear to be in noncompliance with NRC rc luirements. This item and references
to pertinent requirements are listed in the Notice of Violation enclosed herewith
as Appendix A.
This notice is sent to you pursuant to the provisions of Section
2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regula-
tions. Section 2.201 requires you to submit to this office, within 20 days of
your receipt of this notice, a written statement or explanation in reply including:
(1) corrective steps which have been taken by you and the results achieved; (2)
corrective steps which will be taken to avoid further noncompliance; and (3) the
date when full compliance will be achieved.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title
10, Code of Federal Regulations, a copy oi this letter and the enclosed inspection
report will be placed in the NRC's Public Document Room. If this report contains
any information that you (or your contractor) believe to be proprietary, it is
necessary that you make a written application within 20 days to this office to
withhold such information from public disclosure. Any such application must
include a full statement of the reasons on the basis of which it is claimed that
the Information is proprietary, and should be prepared so that proprietary
information identified in the application is contained in a separate part of the
document. If we do not hear from you in this regard within the specified period,
the report will be placed in the Public Document Room.
1937
107
s0020v0
- 2./d
.
.
.
.
Duke Power Company
-2-
Dre - 51979
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
- -f
C. E. Murpny, Chief
Reactor Constructi 1 and Engineering
Support Branch
Enclosures:
1.
Appendix A, Notice of Violation
2.
Inspection Report Nos. 50-369/79-37
and 50-370/79-22
cc w/ enc 1:
M. D. McIntosh, Plant Manager
P. O. Box 488
Cornelius, NC 28031
J. C. Rogers, Project Manager
P. O. Box 33189
Charlotte, NC 28242
-