ea a800
- g 9'o g
UNITED STATES NUCLEAR REGULATORY COMMISSION
~
g g
.r REGION 111 e'['
o 799 ROOSEVELT ROAD
\\
GLEN ELLYN, ILLINOIS 60137 se, _ a9 Docket No. 50-266 Docket No. 50-301 Wisconsin Electric Power Company ATTN:
Mr. Sol Burstein Executive Vice President Power Plants 231 West Michigan Milwaukee, WI 53201 Gentlemen:
The enclosed Circular 79-25, is forwarded to you for information. No written response to this Circular is required.
If you require additional information regarding this subject, please contact this office.
Sincerely, med James G. Kepp er Director
Enclosures:
1.
IE Circular No. 79-25 2.
List of IE Circulars Recently Issued cc w/ enc 1:
Mr. G. A. Reed, Plant Manager Central Files Director, NRR/DPM Director, NRR/ DOR C. M. Trammell, ORB /NRR PDR Local PDR NSIC TIC Sandra A. Bast, Lakeshore Citizens for Safe Energy Mr. John J. Duffy, Chief Boiler Inspector, Department of Industry, Labor and Human Relations 1702 359 3
800108e re \\
SSINS:
6830 Accession No: 7910250514 UNITED STATES
,h q
a NUCLEAR REGULATORY COMMISSION 0FFICE OF INSPECTION AND ENFORCEMENT
>o 2_ J WASHINGTON, D.C.
20555 December 20, 1979 IE Circular No. 79-25 SH0CK ARREST 0R STRUT ASSEMBLY INTERFERENCE The Bergen Paterson Pipesupport Corporation reported to the NRC a potential problem with their mechanical shock arrestor
" Strut Assembly." The Bergen Paterson, Part 2540 Strut Assembly, is being used as a rear bracket for different sizes of Pacific Scientific Company (PSCO) mechanical, shock arrestors.
Some of these shock arrestor sizes may not function as intended due to insufficient clearances.
The following problems were identified:
For PSCO shock arrestors sizes 15 and 50, the Bergen Paterson Part 2540 Strut Assembly does not provide sufficient clearance for the shock arrestor to function freely, when installed at an off axis angle greater than 83.
For PSCO shock arrestor size 120 there is insufficient clearance throughout the 180 installation angle.
For PSCO shock arrestor sizes 50 and 120 with Bergen Paterson Adaptor Part 2108 the shock arrestor unit may sustain functional damage when the adaptor unit comes in contact with the rear of the snubber, causing distortion of the end dust cover.
PSCO shock arrestors sizes
.35,
.65, 1.5 - ' c + tot have this interference condition and therefore are not part of t' nf this circular.
Bergen Paterson stopped shipment as of October....
m L 2540-15, 2540-50, and 2540-120 strut assemblies and is reviewing all applicable design detail drawings, to identify all affected items and the facilities to which those items have been delivered.
Licensees and holders of construction permits are advised to proceed with the inspection of Pacific Scientific Mechanical Shock Arrestor installations with Bergen Paterson Part 2540-15, 2540-50 and 2540-120 Strut Assemblies and deter-mine whether any of the following conditions are applicable:
1.
The shock arrestor installation orientation presents a possible interference problem.
2.
Inspection of shock arrestors 50 and 120 with adaptor show damaged or deformed snubber.
Corrective action should be coordinated with the Strut Assembly supplier (Bergen Paterson) and appropriate resolutions promptly implemented.
002 360 b-md y k L
IE Circular No. 79-25 Enclosure December 20, 1979 RECENTLY ISSUED IE CIRCULARS Circular Subject Date of Issued to No.
Issue 79-24 Proper Installation and 11/26/79 All Holders of a Calibration of Core Spray Power Reactor OL or Pipe Break Detection CP Equipment on BWRs.
79-23 Notor Starters and 11/26/79 All Power Reactor and Contactors Failed Operating Facilities to Operate and Holders of Reactor cps 79-22 Stroke Times for Power 11/16/79 All Power Reactor Operated Relief Valves Operating Facilities and all Utilities having a CP 79-21 Prevention of Unplanned 10/19/79 All holders of Power Releases of Radioactivity Reactor OLs and cps 79-20 Failure of GTE Sylvania 9/24/79 All holders of Power Relay, Type PM Bulletin Reactor OLs and cps 7305, Catalog SU12-11-AC with a 12V AC Coil 79-19 Loose Locking Devices 9/13/79 All Holders of Power on Ingersoll-Rand Pumps Reactor OLs and cps 79-18 Proper Installation of 9/10/79 All Holders of Power Target Rock Safety-Relief Reactor OLs and cps 79-17 Contact Problem in SB-12 8/14/79 All Power Reactor Switches on General Electric Licensees with a CP Company Metalclad Circuit and/or OL Breakers 79-16 Excessive Radiation Exposures 8/16/79 All Radiography To Members Of The General Public Licensees And A Radiographer 79-15 Bursting of High Pressure Hose 8/8/79 All Materials Priority I, and Malfunction of Relief Fuel Cycle and Operating Valve "0" Ring in Certain Self-Power Reactor Licensees Contained Breathing Apparatus 1702 W