ML19260C261

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-329/79-22 & 50-330/79-22 on 791010-12 & Notice of Violation
ML19260C261
Person / Time
Site: Midland
Issue date: 10/30/1979
From: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Howell S
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
Shared Package
ML19260C262 List:
References
NUDOCS 7912260129
Download: ML19260C261 (2)


See also: IR 05000329/1979022

Text

[p neo

'o,

UNITED STATES

n

'

,

,

-

g

NUCLEAR REGULATORY COMMISSION

y

,,

r

REGION lli

o,

f

799 ROo3EVELT ROAD

,

b

'

o

GLEN ELLYN. ILLINOld 60137

.....

OCT 3 01979

.

Docket No. 50-329

s

Docket No. 50-330

Consumers Power Company

ATTN:

Mr. Stephen H. Howell

Vice President

1945 West Parnall Road

Jackson, MI 49201

Gentlemen:

This refers to the inspection conducted by Messrs. E. J. Gallagher,

K. R. Naidu, E. W. K. Lee and T. E. Vandel of this of fice on October 10-12,

1979, of activities at the Midland Nuclear Plant, Units 1 and 2, authorized

by NRC Construction Permits No. CPPR-81 and No. CPPR-82 and to the dis-

cussion of our findings with Messrs. T. C. Cooke, D. B. Miller, J. L. Corley,

and others of your staff, and others of the site staff at the conclusion

of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and inter-

views with personnel.

During this inspection, certain of your activities appeared to be in noncom-

pliance with NRC requirements, as described in the enclosed Appendix A.

This notice is sent to you pursuant to the provisions of Section 2.201 of

the NRC's " Rules of P_ ctice," Part 2, Title 10, Code of Federal Regulations.

Section 2.201 requires you to submit to this office within thirty days of your

receipt of this notice a written statement or explanation in reply, including

for each item of noncompliance:

(1) corrective action taken and the results

achieved; (2) corrective action to be taken to avoid further noncompliance;

and (3) the date when full compliance will be achieved.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter, the enclosures,

and your response to this letter will be placed in the NRC's Public Document

Room, except as follows.

If the enclosures contain information that you or

your contractors believe to be proprietary, you must apply in writing to this

office, within twenty days of your receipt of this letter, to withhold such

1616 246

70122 60 J A f

9

.

,

00130 B79

Consumers Power Company

-2-

,

information from public disclosure. The application must include a full

statement of the reasons for which the information is considered proprietary,

and should be prepared so that proprietary information identified in the

application is contained in an enclosure to the application.

We will gladly discuss any questions you have concerning this inspection.

'

Sincerely,

\\

'5+

Nf

Gaston Fiorelli, Chief

Reactor Construction and

Engineering Support Branch

Enclosures:

1.

Appendix A, Notice

of Violation

2.

IE Inspection Reports

No. 50-329/79-22 and

No. 50-330/79-22

cc w/encls:

Central Files

Reproduction Unit NRC 20b

PDR

Local PDR

NSIC

TIC

Ronald Callen, Michigan Public

j

jg

9j7

Service Commission

iU 471

Dr. Wayne E. North

Myron M. Cherry, Chicago