Forwards IE Insp Repts 50-054/79-03 & 70-0687/79-01 on 790424-27 & Notice of Violation.Notice of Violation Withheld (Ref 10CFR2.790)
ML19260C215
Person / Time
Site: 05000054, 07000687
Issue date: 09/19/1979
From: Martin W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Mcgovern J
UNION CARBIDE CORP.
Shared Package
ML19260C200 List:
References
NUDOCS 7912260068
Download: ML19260C215 (2)


See also: IR 05000054/1979003

Text

e

'

UNITED STATES

p nec

,,

'

NUCLEAR REGULATORY COMMisslON

o

R EGION I

s[.} ),, ) /

y

g

631 PARK AVENUE

..E

c

xisc or enussex. rennsvovAniA naos

s.**v***

SEP 1 S 1979

Docket Nos. 50-54

70-687

Union Carbide Corporation

ATTN: Mr. James J. McGovern

Production Manager, Radiochemicals

P. O. Box 324

'

Tuxedo, New York

10987

Gentlemen:

Subject:

Combined Inspection 50-54/79-03; 70-687/79-01

This refers to the inspection conducted by Mr. D. Holody of this office on April

24-27, 1979, of activities authorized by f1RC License Nos. R-81 and 5NM-639, and

to the discussions of our findings held by fir. Holody with yourself at, the

conclusicr. of the inspection.

Areas examined during this inspection are described in the Office of Inspection

and Enforcement Inspection Report which is enclosed with this letter.

Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, measurements made by the

inspector, and observations by the inspector.

Our inspector also verified the steps you had taken to correct the two items of

noncompliance brought to your attention in our letter dated July 13, 1978.

With

regard to Item 1, we found .his to be a recurring item of noncompliance.

With

regard to Item 2, we found that it was not corrected by the date you committed

to in your response of August 9, 1978.

In that response, you indicated that an

audit of the Nuclear Material Control and Accounting procedures and records

would be completed by October 3,1978.

Our review indicated that you failed to

complete this audit until after October 3,1978, and the documentation of the

audit findings was not performed until January,1979.

This constitutes a deviation

from your conmitment to correct the item of noncompliance in the specified time

frame.

Based on the results of this inspection, it appears that one of your activities

was not conducted in full compliance with t!RC requirements, as set forth in the

Notice of Violation, enclosed herewith as Appendix A.

This item of noncompliance

has been categorized into the levels as described in our correspondence to you

dated December 31, 1974.

This notice is sent to you pursuant to the provisions

of Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of

Federal Regulations.

5ection 2.201 requires you ta cubmit to this office,

within twenty (20) days of your receipt of this notica, a written statement or

explanation ir. reply including:

(1) corrective steps which have been taken by

you and the results achieved; (2) corrective steps which will be taken to avoid

further items of noncompliance; and (3) the date when full compliance will be

achieved.

-

1616 033

79k2260 % 8

"

'

-

,

. , .

,

Union Carbide Corporation

2

SEP 19 379

In addition to your response to the item of noncompliance, please respond to the

deviation by describing the actions you will take to insure that items of noncompliance

are corrected in a timely manner.

In your response to the item of noncompliance

and the deviation, please give these matters your particular attention by (1)

examining your management controls over such matters, (2) determining and correcting

the f G t which resulted in your failure to correct one item of noncompliance,

and your failure to correct another item of noncompliance in the committed time

frame, and (3) defining in your response to this letter, the specific corrective

measures you have taken to prevent recurrence of such management inadequacies in

the future.

In accordanca with Section 2.790(d) of the t'RC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, documentation of findings of your control

and accounting procedures for safeguarding special nuclear materials and your

facility security procedures are exempt from disclosure; therefore, the en-

closures to this letter, and your response to this letter will not be placed in

the Public Document Room and will receive limited distribution.

.-

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

n'

SS

,

,

tlalter G. Martin, Chief

Safeguards Branch

Enclosures:

1.

Appendix A, ilotice of Violation (Contains 2.790 Information)

2.

Office of Inspection and Enforcement Combined Inspection Report

ilumbers 50-54/79-03 and 70-687/79-01 (Contains 2.790 Information)

cc w/ report cover sheet only:

D. B. Holzgraf, T:ucleonics i4anager

J.11. Paradiso, Reactor Supervisor

C. Konnerth, Health Physicist