IR 05000054/1979003
| ML19260C217 | |
| Person / Time | |
|---|---|
| Site: | 05000054, 07000687 |
| Issue date: | 08/20/1979 |
| From: | Holody D, Joyner J, Zibulsky H NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | |
| Shared Package | |
| ML19260C200 | List: |
| References | |
| 50-054-79-03, 50-54-79-3, NUDOCS 7912260074 | |
| Download: ML19260C217 (1) | |
Text
.:
~
,
..
.
U.S. NUCLEAR REGULATORY C0t4 MISSION OFFICE OF INSPECTION AND ENFORCEMENT Region I 50-54/79 03 Report No. _70-687/79-01 50-54 Docket No.70-687 M-d1 Safeguards Group
License No.
SNM-639 Priority
Category Licensee:
Union Carbide Corporation P. O. Box 324 Tuxedo, New York Facility Nama:
Sterling Forest Research Reactor Inspection at:
Tuxedo, New York
Inspection conducted:
April 24-27, 1979
/
P 3/7'T N b#-
I '/
Inspectors:
da,te / signed D. J. Holody, Mathematical Statistician b ei; 1 S.
(...l. a k3/79 A
date/sisned H. Zibu'ls'ky, Chemist date signed Approved by:
st1 /
Wk ??T d8E' II
"*d A. Jp'ynef, Chief, Nuclear Material Control
Sup rt Section, Safeguards Branch Inscection Sumnary:
Inspection on April 24-27, 1979 (Combined Report Nos. 50-54/79-03 and 70-687/79-01)
Areas Inspected:
Routine, unannounced inspection by regional based inspectors of nuclear material control and accounting including:
licensee action on previous inspection findings; organization; operations; measurement and statistical controls; shipping and receiving; storage and internal controls; physical inventory; inventory difference and its associated limit of error (under License SNM-639 only); records and reports; and management of materials control.
The inspection involved 52 inspector-hours onsite by two NRC regional based inspectors.
Results:
Of the ten areas inspected, no items of noncompliance were identified in eight areas, one apparent item of noncompliance was identified in one area
-
and one deviation was identified in one area (Infraction - failure tc perform required training of personnel, Paragraph 3; Deviation - failure to perform a management review and audit of material control and accounting procedures and records within the required time frame, Paragraph 11).
1616 035
.
P.egion I Fcrm 12
'
(Rev. April 77)
,
7 912260 07F