ML19259C552

From kanterella
Jump to navigation Jump to search
B&W Site Inspector Daily Rept on 790410.Plant Status:All Reactors at Full Power W/All Engineering Safety Feature Sys in Svc
ML19259C552
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 04/10/1979
From: Ashenden M, Ford E, Jape F
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML19259C550 List:
References
FOIA-79-98 TI-2595-2, NUDOCS 7906290519
Download: ML19259C552 (2)


Text

e.

TI 7 5'15/ /.

At inclunt nt !

i'.e y.ee l of I e

Ol'l* 1 Ct'. Ott I NSi t (TI'l oN A*iD l.*il'tild'E."EN'l

!!&W SITE I?.SPECTOR !)All.Y HEl'ultt natv 3.10}_7_9

s. re Oconce _1, 2 and 3
  • Inspector (w) F Japa......

M._s..E._3.s,hgRd.gn E. D. Ford t.eneral Plant Status: AQ t hre_e units _cpyr.ating....

T. J. Donat at 100%.

Revirv or similar Trannients (! tem 7 of IES79-05A):

a.

No change from 4/7/79 Report.

v b.

Review and Revision of Operating and Maintenance Proceduren riteris 3, 4, 5,

7, 8, 9, 10 of IEB 79-054):

No change from 4/9/79 Report.

deview and Tepic. mentation of Changes in contalnment Isolation (Item 6 IER 79-054A):

No change from 4/7/79 Report.

d.

Training of Plant Personnel (Items 1, 4, 11 and plant / procedure.9 changes):

Licensed personnel scheduled to attend 36W Simulator in Lynchburg, Virginia to review TMI Transient.

(Date not finalized) 79062906M 4

i

~,,

Tl 2595/2 4Cov/4 At t achrwnr 1 Page 2 of 2 4

2.

SL!.M. MAR) 0F NSC INSPC.CTInN At Ti v : f'.' DURI:iG P8 mind.10.am 4/9_ _1_0..am 4/10.

(Addres: I t e;:m I..

t h r u.. i t til>.sve, give oll:et ludependent /nigul firinit effort, if,ezuti fy shl f e n tut ehich a ' tivi ty wens done iluring past 24 honrr.)

1.

Interviewed 19 SRO/RO's on all three shifts in accordance with TL 2595/2.

2.

Obcarved control room operations on all the.= ehifts.

3.

Inspected control room pancis for tag interference with indicators /

status lights /etc.

4 STAT!!S Of INSPECTOR DISCI:d ; IONS 'a'1TH PIAh'T l'ERSON'iEL:

No change from 4/8/79 report.

4 4

titSCt:l!*T

  • 0N OF Gl'MER AL Pt. ANT STATl!S ( i. t'.. uperat ing. rower level, planned c!: mnoti, s.liedu1.id outages, CSF out of set vice, :mi, lor cuintenance,

.g;.

repor tah' c recur re: ices, etc.)

Unit 1:

100% FP, all ESF System in Servi 5e Unit 2:

100% FP, all ESF System in Service I*ni t 3:

100% FP,. all ESF System in Servic4 o

O e