Forwards Summary of B&W Plant Insp for 790410 W/Ie Site Inspector 790410 Daily Repts
ML19259C549
Person / Time
Issue date: 04/10/1979
From: Jennifer Davis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To: Gilinsky V, Hendrie J, Kennedy R
NRC COMMISSION (OCM)
Shared Package
ML19259C550 List:
References
FOIA-79-98 NUDOCS 7906290504
Download: ML19259C549 (2)


Text

g'

[C ~ 3 2 "

II t

MR 101973 i

.l r

MEHCRA;;DUM FCR: Chaiman Hendrie Comissioner Gilinsky THIS DOCUMENT CONTAINS Co:r,issioner nennedy P00R QUALITY PAGES Cc: nissioner Bradford 5

Comissicner Ahearne THRU:

Lee V. Gossick l

Executive Director for Ocarations 2

FP.0M:

John G. Davis, Acting Director Office of Inspection and Enforcement S!3 JECT:

STATUS OF B&'.1 PLANTS NITl! OPERATING LICE!:SES Enclosed for your infonnation is a su: nary of the status of Babcock and llilcox plants for April 10, 1979.

Jc!m G. Davis

/.cting Director Office of Inspection and Enforce:nent

Enclosure:

3 *.'.' Status Report -

Distribution:

4/10/79 IE Files

[B.Paulus.IE uavis, IE cc w/ encl:

,.u.

OGC D. Thompson, IE Incident Response Center, IE PE L. N. Underwood, IE SECY L. V. Gossick, EDO CO?! TACT:

D. Thompson 49-2SlSO

(%\\SrtAn Tid $

79062906@'

S M,,,,,.

X60 M E X005:IE)/

A/D:IE L U EDr N

,00/79 M-RCPaulus DThomoson JGDavis LVuossic 4//o/79 4L; U/79...

.4fuB9 4L.-./ 79

SUMMARY

OF B&W PLANT INSPECTIONS 4/10/79 Region I:

TMI-l - Shutdown Region II:

Crystal River -

Operating at 75% power with one RCS pump shut down due to seal leakage.

35 of 41 operators on shift have been briefed by NRC.

Inspectors initiated a review of the licensee's transient analyses.

Oconee -

All three units operating at 100% power.

Licensee personnel are scheduled to attend B&W simulator to review iMI transient.

Inspectors interviewed 19 reactor operators and senior operators on all three shifts.

Region III:

Davis-Besse -

Shutdown for maintenance and surveillance testing.

55 members of the staffs of Technical Support, Maintenance, Instrumentation and Control, and Operators were briefed by NRC. Two more briefings by NRC are required and are scheduled for April 10 and 11,1979.

Region IV:

Arkansas Nuclear One, Unit 1 -

Shutdown for refueling.

Plant heatup is scheduled to commence 4/29/79; reactor startup on 5/4/79 and power ascension on 5/7/79.

The licensee has completed the required training for all Unit 1 operators.

12 operators were briefed by NRC.

Region V:

Rancho Seco -

Operating at 100% power.

Licensee revisions to procedures are in final draft.

No. changes were required in containment isolation design and procedures.

Only eight licensed personnel remain to be briefed by NRC.