ML19259B053

From kanterella
Jump to navigation Jump to search
Forwards Requests for Addl Info on Topical Rept Radwaste Reduction Sys Sys Sizing,Radioiodine Adsorbent in Offgas Sys,Justification of Sys Operation W/Specific Matl,Solid Radwaste Generation Rates & Expected Radiation Zone
ML19259B053
Person / Time
Issue date: 10/31/1978
From: Baer R
Office of Nuclear Reactor Regulation
To: May J
NEWPORT NEWS INDUSTRIAL CORP. (SUBS. OF NEWPORT NEWS
Shared Package
ML19259B041 List:
References
781013, NUDOCS 7901160029
Download: ML19259B053 (2)


Text

.

'~

.J.

t

.. ~

{?'I -

OCT 1

..,v +

.f'O.Y Mr. J. R. May 1

fy,',e '

Newport News. Industrial Corporation '

230 41st Street r.

-fy' Newport News, Virginia 23607

Dear Mr. May:

SUBJECT:

ADDITIONAL REQUESTS ON "RADWASTE VOLUME REDUCTION' SYSTEM,"

.' TCPICAL REPORT EI/NNI-77-7

.; u -

li- ' - '

Enclosed are some additional requests for information on subject topical k,..-

our review of your responses to our second round of questions on the report. The first three questions in the Enclosure are the result of yf subject topical report. The last two questions are based on the topical report itself.

s We expect to conclude our review once we receive and evaluate satisfactory '

, responses.to.'.these questions.-

+

,,,, g- _ 3

,.y 5.f Of;. 3 Please provide the information requested in the Enclosure by January 1. \\

  1. f 1979. If you will be unable to mspond by that date, please provide

\\

  • h us with your schedule so that we may adjust the schedule of our myiew effort.

Sircerely, Originai sisnedtry p o -

  • n o,.y

'f, e.;q -

-s 2

, f.J Robert L. Baer, Chief Light Water Reactors A

Branch No. 2 Division of Project Management

Enclosure:

?. '

Request for Additional Infonnation i

l i

~

790116 dom

,o OCT 3 303

~

REQUEST FOR A00!TIONAL INFORf!ATION REPORT NUMBER: EI/NNI-77-7 T

R'AR-1 M Radwaste Volume Reduction System

  • June 24,19//)

REPORT TITLE:

ORIGINATING CAGAH12AT10N: Energy Incorporated / Newport News Industrial Corporation o

1.

In your discussion of the sizing of the RWR~1TM ystem, you conclude that the system has the capacity to handle 980 m / year. However, present staff estimates indicate that a maximum of 1350 m3/ year for a 3800 MWt boiling water reactor with deep-bed condensate deminerali:ers can be expected. YourreportshouldinjicatethattwoRWR-lMsystems T

would be required to process the 1350 m / year of waste.

'2. Since ycu indicate that the radiciodine adsorbent in the offgas system is silver-imoregnated gel AC 61?0 !;i to e depth of six inches, justify your CF of 625.

'i a OF of 100 is used, what impact does this have on your dose analysis?

3.

Justiff that your. system will operate with radioactive material of the. type and activity range encountered in nuclear power plants by providing experimental data which demonstrates your system's perfor-

  • 's mance when processing simulated radioactive waste.

4.

Based on the specific design. features of the RNR-1 volume reduction system, and using conservative estimates of solid radwaste generation rates for both PWRs and SWRs, prc.ide an estimate of the man-rem associated with.each of the following functicns; operations, mainte.1-ance, and inservice inspecticn. State the basis, models, and assumo-tions used to arrive at these values.

5.

Indicate on Figure 2-5 (Pg. 44) the expected radiation zone designa-tiens for each of the radwaste areas shown.

e M

1 e

mm-