Text
e
.
.
UNITED STATES
[pn Mich 'o,
NUCLEAR REGULATORY COMMISSION
p [ ,g
_
RFGloN 11
3 e}g
O
3
'-* g/
g
230 PEACHTRE E STREET. N. W. sulTE 1217
i
[
ATL ANTA, GEORGI A 30303
o
- - y
.....
In Reply Refer To:
NOV 2 01978
RII:CMH
50-348/78-26
Alabama Power Company
ATTN: Mr. A. R. Barton
Executive Vice President
Post Office Box 2641
Eirmingham, Alabama 35291
Gentlemen:
This refers to the inspection conducted by C. M. Hosey and R. W. Zavadoski
of this of fice on September 25-29, 1978, of activities authorized by NRC
License NPF-2 for Farley 1 facility, and to the discussion of our findings
held with W. G. Hairston at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted
of selective examinations of procedures and representative records, inter-
views with personnel, and observations by the inspectors.
Two new unresolved items resulted from this inspection and are discussed in
the enclosed report.
These items will be examined during subsequent
inspections.
During the inspection, it was found that certain activities under your
license appear to be in compliance with NRC requirements.
This item and
references to pertinent requirements are listed in the Nocice of Violation
enclosed herewith as Appendix A.
This notice is sent to you pursuant to
the provisions of Section 2.201 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations.
Section 2.201 requires you to
submit to this office, within 20 days of your receipt of this notice, a
written statement or explanation in reply including:
(1) corrective steps
which have been taken by you and the results achievtd; (2) corrective steps
which will be taken to avoid further compliance; and (3) the date then full
compliance will be achieved.
7903 0800M
-
.
NOV 2 01978
Alabama Power Company
-2-
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room. If this
report contains any information that you (or your contractor) believe to be
proprietary, it is necessary that you make a written application within 20
days to this office to withhold such information from public disclosure.
Any such application must include a full statement of the reasons on the
basis of which it is claimed that the information is proprietary, and should
be prepared so that proprietary information identified in the application is
contained in a separate part of the document. If we do not hear from you in
this regard within the specified period, the report will be placed in the
Public Document Room.
Should you have any questions concerning this letter, we will be glad to
discuss them with you.
Sincerely,
ik
Wu
&
ack T. St therland, Chief
Fuel Facility and Materials
Safety Branch
Enclosures:
1.
Appendix A, Notice of Violation
2.
Inspection Report No. 50-348/78-26
cc w/ enc 1:
Mr. W. G. Hairston, Plant Manager
Drawer 470
Ashford, Alabama 36312