- pn nuouq'o
UNITED STATES
==
g
8
NUCLEAR REGULATORY COMMISSION
o
$
E
REGION 11
'
101 MARlETTA ST
N.W.. SUITE 3100
o,
g*****,d*
ATLANTA, G EORGIA 3o3o3
In Reply Refer To:
DEC14 N
RII:BRC
50-369/79-40
Duke Power Company
ATTN:
W. O. Parker, Jr.
Vice President, Steam Production
P. O. Box 2178
Charlotte, N C 28242
Gentlemen:
This refers to the inspection conducted by B. R. Crowley of this office on
December 4, 1979, of activities authorized by NRC Construction Permit No.
CPPR-83 for the McGuire Nuclear facility, and to the discussion of our findings
held with E. B. Miller at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were disclosed.
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room.
If this
report contains any information that you (or your contractor) believe to be
proprietary, it is necessary that you make a written application within 20 days
to this office to withhold such information from public disclosure. Any such
application must include a full statement of the reasons on the basis of which
it is claimed that the information is proprietary, and should be prepared so
that proprief ary information identified in the application is contained in a
separate part of the document.
If we do not hear from you in this regard within
the specified period, the report will be placed in the Public Document Room.
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
A
-
-
.
C. E. Mu hy, Chief
Reactor Construction and~ Engineering
Support Branch
1864
149
Enclosure:
See Page 2
{} 002040 O M
.
Duke Power Company
-2-
DEC 141979
.
Enclosure:
Inspection Report No. 50-369/79-40
cc w/ enc 1:
M. D. McIntosh, Plant Manager
P. O. Box 488
Cornelius, N C 28031
J. C. Rogers, Project Manager
P. O. Box 33189
Charlotte, N C 28242
-
.
1864
150
.