ML19257D172

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-302/79-47 on 791105-09.No Noncompliance Noted
ML19257D172
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 12/06/1979
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Hancock J
FLORIDA POWER CORP.
Shared Package
ML19257D173 List:
References
NUDOCS 8002010485
Download: ML19257D172 (2)


See also: IR 05000302/1979047

Text

flD

8[3

o

UNITED STATES

M -db p

- h([f/g

NUCLEAR REGULATORY COMMISSION

n

E

REGION 11

5

s

i

101 MARIETTA GT., N.W., SUITE 3100

o,

8

g .....,o

ATLANTA, GEORGIA 30303

In Reply Refer To:

DEC 06 1979

RII:AHJ

50-302/79-47

Florida Power Corporation

ATTN: John A. Hancock, Director

Nuclear Operations

P. O. Box 14042, Mail Stop C-4

St. Petersburg, FL 33733

Gentlemen:

This refers to the inspection conducted by A. H. Johnson of this office on

November 5-9, 1979, of activities authorized by NRC Operating License No. DPR-72

for the Crystal River 3 facility, and to the discussion of our findings held

with G. P. Beatty, Jr. , at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were disclosed.

We have examined actions you have taken with regard to previously identified

enforcement matters and unresolved items. The status of these items is discussed

in the enclosed report.

In accordance with Section 2.790 of the ERC's " Rules of Practice", Part

2,

Title 10, Code of Federal Regulations,

a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20 days

to this office to withhold such information from public disclosure. Any such

application must include a full statement of the reasons on the basis of which

it is claimed that the information is proprietary, and should be prepared so

that proprietary information identified in the application is contained in a

separate part of the document. If we do not hear from you in this regard within

the specified period, the report will be placed in the Public Document Room.

.

1855 052.

s o 0 2 0 1 0 f if f

.

Florida Power Corporation

-2-

og 0 6 19f9

,

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

y

' /g'!fft L

&

>~~

R. C. Lewis, Acting. Chief

Reactor Operations and Nuclear

,

Support Branch

Enclosure:

Inspection Report No. 50-302/79-47

cc w/ enc 1:

G. P. Beatty, Jr.

Plant Superintendent

P. O. Box 1240

Crystal River, FL 32629

-

1855 053