Proposed Tech Specs,Section 3.9-2 Re Diesel Generator Fuel Oil Sampling Requirements
ML19257C007
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 01/16/1980
From:
GEORGIA POWER CO.
To:
Shared Package
ML19257B969 List:
References
NUDOCS 8001220558
Download: ML19257C007 (2)


Text

e ATTACIIMENT 2 NRC DOCKET 50-321 OPERATING LICENSE DPR-57 EDWIN I. IIATCll NUCLEAR PLANT UNIT 1 PROPOSED CHANGES TO TECilNICAL SPECIFICATIONS The proposed changes to the Technical Specifications (Appendix A to Operating License DPR-57) would be incorporated as follows:

Remove Page Insert Page 3.9-2 3.9-2 i

1783 319

LIMITING CONDITIONS FOR OPERATION SURVEILLANCE REQUIREMENTS 3.9.A.2. Standby AC Power Supply (Diesel 4.9.A.2 Standby AC Power Supply (Diesel Generators lA, 1B, and IC) Generators lA, 1B, and IC)

(Continued) (Continued)

a. Operability a. Operability The diesel generator itself and Each diesel generator shall its auxiliaries are operable. be manually started and loaded once each month to
b. Dieaal Battery (125 Volt) demonstrate operational read-Each 125 volt diesel battery iness. The test shall con-is operable and capable of tinue for at least a one supplying the required load, hour period at 50% or greater of rated load. The diesel
c. Battery Charger generator starting time to An operable battery charger is reach rated voltage and fre-available. Each battery charger quency shall be recorded.

shall have adequate capacity to During the monthly generator restore its battery to full test, the starting air com-charge within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> from a pressor shall be checked for discharged condition while operation and for its ability carrying the DC load. to recharge the air system.

d. Diesel Fuel b. Diesel Battery (125 Volt)

There shall be a minimum of Each 125 volt diesel battery 80,000 gallons of acceptable shall be subjected to the diesel fuel in the diesel same periodic surveillance as fuel storage tanks. the plant batteries in Speci-fication 4.9.A.3.

c. Battery Charger Indicators shall be provided to monitor the status of the battery charger supply.

This instrumentation shall include indication of output

, current and output voltage.

d. Diesel Fuel Each month the quantity of diesel fuel available in each fuel storage tank shall be measured and recorded.

At least once per 92 days by verifying that a sample of diesel fuel from the fuel storage tank, obtained in accordance with ASTM-D270-65, is within the acceptable limits specified in Table 1 of AST11 D975-74 when checked for viscosity, water and sediment.

e. Fuel Oil Transfer Pumps The operation of the diesel fuel oil transfer pumps shall be demonstrated once each month.

3.9-2 1783 320.