ML19256G323

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-318/79-16 on 791015-17 & 23-26.No Noncompliance Noted
ML19256G323
Person / Time
Site: Calvert Cliffs Constellation icon.png
Issue date: 11/09/1979
From: Brunner E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Lundvall A
BALTIMORE GAS & ELECTRIC CO.
Shared Package
ML19256G324 List:
References
NUDOCS 7912310041
Download: ML19256G323 (2)


See also: IR 05000318/1979016

Text

Sa arc ,

7h

.

o

E(y) w( ( g

o

UNITED STATES

g

NUCLEAR REGULATORY COMMISSION

7, ? '# / .

E

REGION I

0,

[

631 PARK AVENUE

% '.O

,o

KING OF PRUSSIA, PENNSYLVANIA 19406

+ ..+

Docket No. 50-318

9O

Baltimore Gas and Electric Company

ATTN:

Mr. A. E. Lundvall, Jr.

Vice President, Supply

P. O. Box 1475

Baltimore, Maryland 21203

Gentlemen:

Subject:

Inspection No. 50-318/79-16

This refers to the inspection conducted by Mr. George Kalman of this office on

October 15-17 and October 23-26, 1979, at Calvert Cliffs Unit 2, Lusby, Maryland

of activities authorized by NRC License No. DPR-69 and to the discussions of

our findings held by Mr. Gen - Walman with Mr. L. Russell of your staff at the

conclusion of the inspection.

.

Areas examined during this inspection are described in the Office of Inspection

and Enforcement Inspection Report which is enclosed with this letter.

Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observations by the

inspector.

Within the scope of this inspection, no items of noncompliance were observed.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20 days

to this office to withhold such information from public disclosure.

Any such

application must be accompanied by an affidavit executed by the owner of the

information, which identifies the document or part sought to be withheld, and

which contains a statement of reasons which addresses with specificity the items

which will be considered by the Commission as listed in subparagraph (b) (4) of

Section 2.790.

The information sought to be withheld shall be incorporated as

far as possible into a separate part of the affidavit.

If we do not hear from

you in this regard within the specified period, the report will be placed in

the Public Document Room.

1660

292

~7912310 h

.

.

Baltimore Gas & Electric Company

2

NOV

s 1979

No reply to this letter is required; however, if you should have any questions

concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

't - -

j

.- tm

1o

.' Brunner, Chief

Reactor Operations and Nuclear

Support Branch

Enclosure:

Office of Inspection and Enforcement

Inspection Report No. 50-318/79-16

cc w/ encl:

R. M. Douglass, Manager, Quality Assurance

L. B. Russell, Chief Engineer

W. Gibson, General Supervisor, Operations QA

R. C. L. Olson, Senior Engineer

K. H. Sebra, Principal Engineer

1660 293