Forwards IE Insp Repts 50-508/79-08 & 50-509/79-07 on 790924-28.No Noncompliance Noted
ML19256E570
Person / Time
Site: Satsop
Issue date: 10/12/1979
From: Spencer G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Strand N
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML19256E571 List:
References
NUDOCS 7911080066
Download: ML19256E570 (2)


See also: IR 05000508/1979008

Text

.N

T/C

.

8# PIO

,%

(o

UNITED STATES

.-

NUCLE AR REGULATORY COMMISSION

! '-

. ]( g

. , _

6EGION V

gy

.y

1900 N. CAL 2FORNI A BOULEVARD

g

g

SUlO M/, WALNUT CREEK PLAZA

.

% ',,,4 e

WALNUT CREEK, CALIFORNIA 94596

4

October 12, 1979

Docket Nos. 50-508

50-509

Washington Public Power Supply System

P. O. Box 468

Richland, Washington 99352

Attention: Mr. N. O. Strand

Managing Director

Gentlemen:

Subject: NRC Inspection - WNP 3 and 5

This refers to the inspection conducted by Mr. D. F. Kirsch of this office

on September 24-28, 1979, of activities authorized by NRC Construction Permit

flos. CPPR-154 and CPPR-155, and to the discussion of our findings held by

Mr. Kirsch with Mr. C. E. Love and other members of your staff at the conclusion

of the inspection.

Areas examined during this inspection are described in the enclosed inspection

report. Within these areas, the inspection consisted of selective examinations

of procedures and representative records, interviews with personnel, and

observations by the inspector.

No items of noncompliance with fiRC requirements were identified within the

scope of this inspection.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed 1n the NRC's Public Document Room.

If this

report contains any information that you believe to be proprietary, it is

necessary that you submit a written application to this office, within 20 days

of the date of this letter, requesting that such information be withheld from

public disclosure. The application must include a full statement of the

reasons why it is claimed that the information is proprietary. The application

should be prepared so that any proprietary information identified is

contained in an enclosure to the application, since the application without

the enclosure will also be placed in the Public Document Room.

If we do not

hear from you in this regard within the specified period, the report .will be;

placed in the public Document Room.

'

1294 14l

7911 080 Odd

,,

Washington Public Power Supply System

-2-

October 12, 1979

Should you have any questions concerning this inspection, we will be glad to

discuss them with you.

Sincerely,

/

.

ImC6v

G. S. S encer, Chief

Reactor Construction and

Engineering Support Branch

Enclosure:

IE Inspection Report

Nos. 50-508/79-08

50-509/79-07

cc w/o enclosure:

M. E. Witherspoon, Division Manager

Quality Assurance, WPPSS

cc w/ enclosure:

W. J. Talbott, Division Manager, WPPSS

1294

142'