Forwards IE Bulletin 79-13,Revision 2, Cracking in Feedwater Sys Piping. No Action Required
ML19254F189
Person / Time
Site: Oyster Creek
Issue date: 10/17/1979
From: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Finfrock I
JERSEY CENTRAL POWER & LIGHT CO.
References
NUDOCS 7911070297
Download: ML19254F189 (1)


Text

%

"p?M%

'f L J

0, UNITED STATES

[ , e qff j NUCLEAR REGULATORY COMMISSION

A C

REGION I 3, \\ b h,

1[ggf 631 PARK AVENUE KING OF PRUSSIA, PENNSYLVANI A 19406 7

October 17, 1979 Docket No. 50-219 Jersey Central Power and Light Company ATTN: Mr. Ivan R. Finfrock, Jr.

Vice President Madison Avenue at Punch Bowl Road Morristown, New Jersey 67960 Gentlemen:

The enclosed IE Bulletin 79-13, Revision 2, is forwarded to you for i nformation.

No written response is required.

If you desire additional information regarding this matter, please contact this office.

Sincerely,

/ & W.

oyce H. Grier Director

Enclosures:

1.

IE Bulletin No. 79-13 w/ Attachments 2.

Listing of IE Bulletins Issued in Last 6 Months cc w/encls:

J. T. Carroll, Station Superintendent 1289 CONTACT:

L. E. Tripp 337-5282 7011070

ENCLOSURE 1 SSINS:

6830 Accession No.:

7908220135 UNITED STATES NUCLEAR REGULATERY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D.C.

20555 October 17, 1979 IE Bulletin No. 79-13 Rev.. ' ?ri 2 Page 1 of 5 CRACKING IN FEEDWATER SYSTEM PIPING Description of Circumstances:

This revision to IE Bulletin No. 79-13 is based on the results of the radiographic examinations and ongoing investigation of the subject problem to date since the initial Bulletin was issued.

The revision reduces in scope the number and R2 extent of the piping system welds required to be examined.

The requirements for reporting and action time frame remain unchanged.

On May 20, 1979, Indiana and Michigan Power Company notified tne NRC of cracking in two feedwater lines at their D. C. Cook Unit 2 facility.

The cracking was discovered following a shutdown on May 19 to investigate leakage inside contain-ment.

Leaking circumferential cracks were identified in the 16-inch feedwater elbows adjacent to two steam generator nozzle elbow welds. Subsequent radiographic examination revealed crack indications in all eight steam generator feedwater lines at this location on both Units 1 and 2.

On May 25, 1979, a letter was sent to all PWR licensees by the Office of Nuclear Reactor Regulation which informed licensees of the D. C. Cook failures and requested specific information on feedwater system design, fabrication, inspec-tion and operating histories. To further explore the generic nature of the cracking problem, the Office of Inspection and Enforcement requested licensees of PWR plants in current outages to immediately conduct volumetric examination of certain feedwater piping welds.

As a result of these actions, several other licensees with Westinghouse steam generators reported crack indications.

Southtrn California Edison reported on June 5, 1979, that radiographic examination revealed indications of cracking in feedwater nozzle-to-pipe welds on two of three steam generators of San Onofre Unit 1.

On June 15, 1979, Carolina Power and Light reported that radiography showed crack indications in similar locations at their H. B. Robinsen Unit 2.

Duquesne Power and Light confirmed on June 18, 1979, that radiography has shown cracking in their Beaver Valley Unit 1 feedwater piping-to-vessel nozzle weld.

Public Service Electric and Gas Company reported on June 20, 1979 that Salem Unit 1 also has crack indications. Wisc June 20, 1970 to cut out a feedwater no able indication, for metallurgical exami May 25, 1979 seven other PWR facilities E DUPLICATE DOCUMENT pipe welds without finding cracking indi Entire document previously NOTE: R1 and R2 indicates lines revise entered into system under: