ML19254E871
| ML19254E871 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 08/20/1979 |
| From: | Martin W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Counsil W NORTHEAST NUCLEAR ENERGY CO. |
| Shared Package | |
| ML19254E869 | List: |
| References | |
| NUDOCS 7911020471 | |
| Download: ML19254E871 (2) | |
See also: IR 05000245/1979008
Text
UNITED STATES
pA 8ttong
.n
o
NUCLEAR REGULATORY COMMISSION
y
n
REGION 1
$
$
E31 PARK AVENUE
C
KING OF PRUSSI A, PENNSYLVANIA 19406
%*****$
gG q
b. .,
i:
Docket Nos. 50-245
50-336
Northeast Nuclear Energy Company
ATTN:
Mr. W. G. Counsil
Vice President - Nuclear
Engineering and Operations
P. O. Box 270
Hartford, Connecticut
06101
Gentlemen:
Subject:
Combined Inspection 50-245/79-08 and 50-336/79-08
This refers to the inspection conducted by Mr. E. W. Jones of this office on
April 9-13,1979 at the Millstone-Nuclear Station, Units 1 and 2, Waterford,
Connecticut of activities authorized by NRC License Nos. DPR-21 and DPR-65 and
to the discussions of our findings held by Mr. Jones with Messrs. Tasker and
Mroczka of your staff at the conclusion of the inspection.
Areas examined during this inspection are described in the Office of Inspection
an'J Enforcement Inspection Report which is enclosed with this letter.
Within
t'iese areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observations by the
inspector.
Based on the results of this inspection, it appears that one of your activities
was not conducted in full compliance with NRC requirements, as set forth in
the Notice of Violation, enclosed herewith as Appendix A.
This item of
noncompliance has been categorized into the levels as described in our
correspondence to you dated December 31, 1974.
This notice is sent to you
pursuant to the provisions of Section 2.201 of the NRC's " Rules of Practice",
Part 2, Title 10, Code of Federal Regulations.
Secticn 2.201 requires you
to submit to this office, within twenty (20) days of your receipt of this
notice, a written statement or explanation in reply including:
(1) corrective
steps which have been taken by you and the results achieved; (2) corrective
steps which will be taken to avoid further items of noncompliance; and (3)
the date when full compliance will be achieved.
-
1240 291
T 0110 2 0 +7 I
.
.
Not% east Nuclear Energy
g;jg q - 1979
,
Company
2
In accordance with Section 2.790(d) cf the NRC's " Rules of Practice," Part
2, Title 10, Code of Federal Regulations, documentation of findings of your
control and accounting procedures for safeguarding special nuclear materials
and your facility security procedures are exempt from disclosure; therefore,
the enclosures to this letter, and your response to this letter will not be
placed in the Public Document Room and will receive limited distribution.
Should you have any questions concerning this inspection, we will be pleased
to discuss them with you.
Sincerely,
/
5
.
Walter G. Martin, Chief
Safeguards Branch
Enclosures:
1.
Appendix A, Notice of Violation (Contains 2.790 Information)
2.
Office of Inspection and Enforcement Combined Inspection
Report Numbers 50-245/79-08 and 50-336/79-0 e (Contains 2.790
Information)
cc:
J. F. Opeka, Station Superintendent (w/encis)
D. G. Diedrick, t% nager of Quality Assurance (w report cover sheet only)
J. R. Himelwright, Licensing Safeguards Engineer (w report cover sheet only)
A. Z. Roisman, Natural Resources Defense Council (w report cover sheet only)
1240
292